LNWR/LMS Webb "1P" Class 2-4-2T
Locomotive ConstructionThe following graph shows the number of locomotives built by year. The first locomotive was delivered in September 1890 and the last in July 1897. A total of 160 locomotives were built between 1890 and 1897. |
Locomotive WithdrawalsThe following graph shows the number of locomotives withdrawn by year. The first locomotive was withdrawn in January 1907 and the last in September 1955. A total of 160 locomotives were withdrawn between 1907 and 1955. |
Class LifespanThis graph show the relationship between builds and withdrawals. The first locomotive was built in September 1890 and the last was withdrawn in September 1955. |
Class StockThis graph shows the number of locomotives in this class, by year, over the entire lifespan of the class. This information illustrates how rapidly/slowly a class may have been constructed or withdrawn from service. |