Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 4362 Today
» 4163 Yesterday
» 17768 Week
» 70784 Month
» 190311 Year
» 3217164 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)

GCR/LNER Robinson "B3" Class 4-6-0


Class Types
GCR Class 9P
LNER Class B3

General
Designer John Robinson
Introduced 1917
Pre-Grouping Company Great Central Railway
Grouping Company London and North Eastern Railway
Description (1957) Class B3/3. The survivor of Robinson's 6'9" 4-cylinder 'Lord Farringdon' class, built 1917-20. All were withdrawn 1946-47, except No. 1497, which had been completely rebuilt in 1942 as a 2-cylinder engine. Scrapped in 1949.
Wheel Arrangement 4-6-0
Number Built as B3 6
Number Scrapped 6
First in Service 11/1917
Last in Service 14/04/1949
Manufacturers
ManufacturerTotal
Gorton Works 6
Orders
BuilderSponsorOrder #DateSize
Gorton Works  n/a 6
Classification Southern Area 4
Route Availability 7 (B3/1 & B3/2), 5 (B3/3)
BR Power Class 4P (B3/3)
Engine Diagrams
DiagramDetails
Section C, 1924 Dimensions given for 24 and 28 element superheaters. Became B3/1 in December 1929.
Section C, 12/1929 Engines with Caprotti valve gear. Classified B3/2
Section C, 1938 B3/1. Revised diagram.
Section C, 1938 B3/2. Revised diagram.
1943. Thompson rebuild of 6166. Classified B3/3.
1947. B3/3 amended boiler heating surface.

Illustration
Copyright: Alan Whitehead c/o 53A Models
Power
B3/1 B3/2 B3/3
Variant Introduced 1917 1929 1943
Tractive Effort 25,145lbs
As B3/1
24,555lbs
Inside Cylinders 16" x 26" (2 off)
As B3/1
As B3/1
Inside Valves 8"Piston
As B3/1
As B3/1
Inside Motion Stephenson
As B3/1
As B3/1
Outside Cylinders 16" x 26" (2 off)
As B3/1
20" x 26" (2 off)
Outside Valves 8"Piston
As B3/1
10"Piston
Outside Motion Stephenson Caprotti Walschaerts

Wheels
B3/1 B3/2 B3/3
Pony 3' 6"
As B3/1
As B3/1
Drivers 6' 9"
As B3/1
As B3/1
Locomotive Wheelbase 28' 10"
As B3/1
27' 11"
Tender Wheelbase 13'
As B3/1
As B3/1
Total Wheelbase 52' 912"
As B3/1
51' 1058"
Descriptive Wheelbase 6' 6" + 6' 10" + 7' 3" + 8' 3" + (10' 11½") + 6' 6" + 6' 6" = 52' 9½"
As B3/1
6' 6" + 5' 11" + 7' 3" + 8' 3" + (10' 11⅝") + 6' 6" + 6' 6" = 51' 10⅝"

Dimensions
B3/1 B3/2 B3/3
Length (over buffers) 63' 038"
As B3/1
62' 178"
Weight (in running order) 127t 8cwt
As B3/1
119t 13cwt
Weight (loco only) 79t 2cwt
As B3/1
71t 7cwt
Adhesive Weight 57t 2cwt
As B3/1
48t 6cwt
Maximum Axle Load 20t 0cwt
As B3/1
18t 3cwt
Water Capacity 4,000gal
As B3/1
As B3/1
Coal Capacity 6t 0cwt
As B3/1
As B3/1

Boiler & Firebox
B3/1 B3/2 B3/3
Boiler Diagram 13
As B3/1
100A
Boiler Max Diameter 5' 6"
As B3/1
5' 6"
Boiler Barrel Length 17' 3"
As B3/1
13' 1178"
Boiler Pressure 180lbs
As B3/1
225lbs
Boiler Pitch 8' 11"
As B3/1
As B3/1
Firebox Length 8' 6"
As B3/1
9'
Firebox Grate Area 26ft2
As B3/1
27.9ft2
Firebox Heating Surface 163ft2
As B3/1
168ft2
Tube Number 139
As B3/1
141
Tube Diameter 214"
As B3/1
2"
Tube Area 1442ft2
As B3/1
1033ft2
Flue Elements 24
As B3/1
24
Flue Diameter 514"
As B3/1
514"
Flue Area 578ft2
As B3/1
460ft2
Total Evaporative Area 2183ft2
As B3/1
1661ft2
Superheater Elements 24
As B3/1
24
Superheater Element Diameter 1116"
As B3/1
1.244"
Superheater Element Area 294ft2
As B3/1
344ft2