Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

Counter

Ad Visitor Statistics
» 8 Online
» 675 Today
» 1239 Yesterday
» 7264 Week
» 12646 Month
» 50713 Year
» 50713 Total
Record: 1511 (01/12/2016)
(Free MySQL Counter)

Advertising



Reliable $1 Web Hosting by HostBig

In Touch

Bookmark and Share

Follow BRDatabase on Twitter

MLSR/LNER Parker "N5" Class 0-6-2T


General
Designer Parker
Introduced 1891
Pre-Grouping MLSR
Big Four London and North Eastern Railway
Wheels 0-6-2T
Number Built 131
First in Service 09/1891
Last in Service 12/1960
Manufacturers
ManufacturerTotal
Beyer Peacock Ltd. 81
Gorton Works 50

Illustration
Copyright: 53A Models
Power
N5/1 N5/2 N5/3
Variant Introduced 1891 1891 1891
Tractive Effort 18,781lbs
As N5/1
As N5/1
Inside Cylinders 18" x 26" (2 off)
As N5/1
18.5" x 26" (2 off)
Inside Valves Slide
As N5/1
Slide
Inside Motion Stephenson
As N5/1
Stephenson

Wheels
N5/1 N5/2 N5/3
Drivers 5' 1"
As N5/1
As N5/1
Truck 3' 6"
As N5/1
As N5/1
Total Wheelbase 22' 6"
As N5/1
As N5/1
Descriptive Wheelbase 7' 11" + 8' 7" + 6' 0"
As N5/1
As N5/1

Dimensions
N5/1 N5/2 N5/3
Length (over buffers) 36' 818"
As N5/1
As N5/1
Weight (in running order) 62t 7cwt 62t 12cwt 62t 18cwt
Adhesive Weight 48t 19cwt 49t 4cwt 50t 18cwt
Maximum Axle Load 17t 0cwt
As N5/1
18t 0cwt
Water Capacity 1,360gal
As N5/1
1,840gal
Coal Capacity 3t 0cwt
As N5/1
3t 16cwt

Boiler & Firebox
N5/1 N5/2 N5/3
Boiler Diagram 21
As N5/1
As N5/1
Boiler Notes Robinson GCR Standard No 1 boiler
As N5/1
As N5/1
Boiler Max Diameter 4' 4"
As N5/1
As N5/1
Boiler Barrel Length 10' 818"
As N5/1
As N5/1
Boiler Pressure 160lbs
As N5/1
As N5/1
Boiler Pitch 7' 412"
As N5/1
As N5/1
Firebox Length 6'
As N5/1
As N5/1
Firebox Grate Area 18.3ft2
As N5/1
As N5/1
Firebox Heating Surface 99ft2
As N5/1
As N5/1
Tube Number 190 102
As N5/1
Tube Diameter 134" 178"
As N5/1
Tube Area 964ft2 554ft2
As N5/1
Flue Elements   15  
Flue Diameter   514"  
Flue Area   227ft2  
Total Evaporative Area 1063ft2 781ft2
As N5/1
Superheater Elements   15  
Superheater Element Diameter   1116"  
Superheater Element Area   113ft2  
Total Heating Area 1063ft2
As N5/1
As N5/1