Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

Counter

Ad Visitor Statistics
» 12 Online
» 854 Today
» 1171 Yesterday
» 4471 Week
» 16176 Month
» 347665 Year
» 424252 Total
Record: 1668 (12/02/2017)
(Free MySQL Counter)

Advertising



In Touch

Bookmark and Share

Follow BRDatabase on Twitter

MSLR/LNER Parker "D7" Class 4-4-0


Class Types
MLSR Class 2
MLSR Class 2A
LNER Class D7

General
Designer Parker
Introduced 1887
Pre-Grouping Manchester, Sheffield and Lincolnshire Railway
Big Four London and North Eastern Railway
Wheels 4-4-0
Number Built as D7 31
Number Scrapped 31
First in Service 11/1887
Last in Service 12/1939
Manufacturers
ManufacturerTotal
Gorton Works 18
Kitson 13
Orders
BuilderOrder #DateSize
Kitson 74 1887 1
Gorton Works n/a 1890 6
Gorton Works n/a 1891 6
Kitson 131 1892 12
Gorton Works n/a 1894 6

Power
2/D7 2A/D7
Variant Introduced 1887 1894
Miscellaneous Differences   Coupled wheel journals larger than Class 2 and coiled springs instead of leaf for the driving axles.
Tractive Effort 14,144lbs
As 2/D7
Inside Cylinders 18" x 26" (2 off)
As 2/D7
Inside Valves Slide
As 2/D7
Inside Motion Stephenson
As 2/D7

Wheels
2/D7 2A/D7
Pony 3' 6"
As 2/D7
Drivers 6' 9"
As 2/D7
Locomotive Wheelbase 21' 9"
As 2/D7
Tender Wheelbase 13'
As 2/D7
Total Wheelbase 44' 3"
As 2/D7
Descriptive Wheelbase 5' 9" + 7' 5" + 8' 7" + 9' 6" + 6' 6" + 6' 6" = 44' 3"
As 2/D7

Dimensions
2/D7 2A/D7
Length (over buffers) 53' 714"
As 2/D7
Weight (in running order) 83t 6cwt
As 2/D7
Weight (loco only) 46t 0cwt
As 2/D7
Adhesive Weight 31t 10cwt
As 2/D7
Maximum Axle Load 16t 0cwt
As 2/D7
Water Capacity 3,080gal
As 2/D7
Coal Capacity 5t 0cwt
As 2/D7

Boiler & Firebox
2/D7 2A/D7
Boiler Pitch 7' 8"
As 2/D7