Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

Counter

Ad Visitor Statistics
» 15 Online
» 1183 Today
» 1213 Yesterday
» 1183 Week
» 12888 Month
» 344377 Year
» 420964 Total
Record: 1668 (12/02/2017)
(Free MySQL Counter)

Advertising



In Touch

Bookmark and Share

Follow BRDatabase on Twitter

MSLR/LNER "Y2" Class 0-4-0ST


Class Types
MSLR Class 4

General
Introduced 1883
Pre-Grouping Manchester, Sheffield and Lincolnshire Railway
Big Four London and North Eastern Railway
Wheels 0-4-0ST
Number Built as Y2 2
Number Scrapped 2
Number Preserved 0
First in Service 03/1883
Last in Service 08/07/1931
Manufacturers
ManufacturerTotal
Manning, Wardle & Co. 2
Orders
BuilderOrder #DateSize
Manning, Wardle & Co. n/a 1883 2

Power
Variant Introduced 1883
Tractive Effort 10,824lbs
Outside Cylinders 14" x 18" (2 off)
Outside Valves Slide
Outside Motion Stephenson

Wheels
Drivers 3'
Total Wheelbase 5' 6"
Descriptive Wheelbase 5' 6"

Dimensions
Length (over buffers) 21' 8"
Weight (in running order) 20t 7cwt
Maximum Axle Load 10t 18cwt
Water Capacity 550gal
Coal Capacity 0t 8cwt

Boiler & Firebox
Boiler Diagram Not Issued
Boiler Max Diameter 3' 218"
Boiler Barrel Length 9' 4.313"
Boiler Pressure 130lbs
Boiler Pitch 5' 1"
Firebox Length 2' 934"
Firebox Grate Area 6.6ft2
Firebox Heating Surface 43ft2
Tube Number 102
Tube Diameter 2"
Tube Area 518ft2
Total Evaporative Area 563ft2
Total Heating Area 563ft2