Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 33 Online
» 4054 Today
» 4868 Yesterday
» 22965 Week
» 87919 Month
» 290583 Year
» 3317436 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D2590 14/12/1959  

Locomotive Specifics
Class as Built 05
Subclass/Rebuild History
ClassFrom
3' 9" engines14/12/1959
Wheel Arrangement 0-6-0
Builder Hunslet Engineering Co. Ltd.
To Service 14/12/1959 to Wakefield (56A)
Withdrawn 08/06/1968
Time in Service 8 yrs, 5 mths , 25 dys
Cut Up m/e 01/1969
Cut At Campbells (Airdrie)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
56A   Wakefield (New) on 14/12/1959
51A   Darlington w/e 24/02/1962
51C   West Hartlepool w/e 09/05/1964
64B   Haymarket 4w/e 22/04/1967
64H   Leith Central 4w/e 27/05/1967
     Withdrawn on 08/06/1968

Configuration - WIP
Date Configuration Description Additional Diagram Source
14/12/1959 v Vacuum brakes      


Summary
Start Event Details Source See Also
14/12/1959 To Service To service as British Railways number D2590
Built at Hunslet Engineering Co. Ltd.
Allocated to Wakefield (56A)
   
24/02/1962 Allocation Reallocated to Darlington (51A)    
09/05/1964 Allocation Reallocated to West Hartlepool (51C)    
22/04/1967 Allocation Reallocated to Haymarket (64B)    
27/05/1967 Allocation Reallocated to Leith Central (64H)    
08/06/1968 Withdrawn Condemned as 2590    
01/1969 Scrapped Broken up by Campbells: Airdrie    

prev prev