Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 29 Online
» 2757 Today
» 4163 Yesterday
» 16163 Week
» 69179 Month
» 188706 Year
» 3215559 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D2612 30/01/1961  
Departmental 88 11/02/1961  

Locomotive Specifics
Class as Built 05
Subclass/Rebuild History
ClassFrom
3' 9" engines30/01/1961
Wheels 0-6-0
Builder Hunslet Engineering Co. Ltd.
To Service 30/01/1961 to Darlington (51A)
Withdrawn 23/09/1967
Time in Service 6 yrs, 7 mths , 24 dys
Cut Up 12/1967
Cut At Argosy Salvage (Shettleston)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
51A   Darlington (New) on 30/01/1961
ED Faverdale     w/e 04/02/1961
     Withdrawn on 23/09/1967

Configuration - WIP
Date Configuration Description Additional Diagram Source
30/01/1961 v Vacuum brakes      


Summary
Start Event Details Source See Also
30/01/1961 To Service To service as British Railways number D2612
Built at Hunslet Engineering Co. Ltd.
Allocated to Darlington (51A)
   
04/02/1961 Allocation      
11/02/1961 Renumbered Renumbered to 88    
23/09/1967 Withdrawn Condemned as 88    
12/1967 Scrapped Broken up by Argosy Salvage: Shettleston    

prev prev