Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 940 Today
» 4163 Yesterday
» 14346 Week
» 67362 Month
» 186889 Year
» 3213742 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS D2615 08/03/1961  
Departmental 89 25/01/1964  
Pre TOPS D2615 11/1967  

Locomotive Specifics
Class as Built 05
Subclass/Rebuild History
ClassFrom
3' 9" engines08/03/1961
Wheels 0-6-0
Builder Hunslet Engineering Co. Ltd.
To Service 08/03/1961 to Percy Main (52E)
Withdrawn 30/12/1967
Time in Service 6 yrs, 9 mths , 22 dys
Cut Up 08/1968
Cut At C F Booth (Rotherham)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
52E   Percy Main (New) on 08/03/1961
52A   Gateshead w/e 25/03/1961
52D   Tweedmouth w/e 16/12/1961
52A   Gateshead w/e 24/08/1963
     Dinsdale Sleeper Depot w/e 25/01/1964
51A   Darlington 4w/e 02/12/1967
     Withdrawn on 30/12/1967

Configuration - WIP
Date Configuration Description Additional Diagram Source
08/03/1961 v Vacuum brakes      


Summary
Start Event Details Source See Also
08/03/1961 To Service To service as British Railways number D2615
Built at Hunslet Engineering Co. Ltd.
Allocated to Percy Main (52E)
   
25/03/1961 Allocation Reallocated to Gateshead (52A)    
16/12/1961 Allocation Reallocated to Tweedmouth (52D)    
24/08/1963 Allocation Reallocated to Gateshead (52A)    
25/01/1964 Renumbered Renumbered to 89    
11/1967 Renumbered Renumbered to 2615    
02/12/1967 Allocation Reallocated to Darlington (51A)    
30/12/1967 Withdrawn Condemned as 2615    
08/1968 Scrapped Broken up by C F Booth: Rotherham    

prev prev