Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 13 Online
» 1583 Today
» 4397 Yesterday
» 19386 Week
» 72402 Month
» 191929 Year
» 3218782 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Post 1948 (1955 Num) 13207 26/01/1956  
Pre TOPS (Pre Tops) D3207 28/02/1958  
TOPS (Tops) 08139 03/1974  

Locomotive Specifics
Class as Built 08
Subclass/Rebuild History
ClassFrom
0826/01/1956
Wheels 0-6-0
Builder Derby Works
To Service 26/01/1956 to Eastfield (65A)
Withdrawn 21/09/1980 off March (MR)
Time in Service 24 yrs, 7 mths , 26 dys
Cut Up 04/1982
Cut At Locomotive Works (Swindon)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
65A   Eastfield (New) on 26/01/1956
67C   Ayr 4w/e 25/07/1964
31B   March w/e 04/01/1969
     Withdrawn on 21/09/1980

Configuration - WIP
Date Configuration Description Additional Diagram Source
26/01/1956 v Vacuum brakes      


Summary
Start Event Details Source See Also
26/01/1956 To Service To service as British Railways number 13207
Built at Derby Works
Allocated to Eastfield (65A)
   
28/02/1958 Renumbered Renumbered to 3207    
25/07/1964 Allocation Reallocated to Ayr (67C)    
04/01/1969 Allocation Reallocated to March (31B)    
03/1974 Renumbered Renumbered to 08139    
21/09/1980 Withdrawn Condemned as 08139 from March (MR)    
04/1982 Scrapped Broken up by Locomotive Works: Swindon    

prev prev