Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 1591 Today
» 4397 Yesterday
» 19394 Week
» 72410 Month
» 191937 Year
» 3218790 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D335 10/03/1961  
TOPS (Tops) 40135 05/1974  
Departmental (Dept) 97406 01/05/1985  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4010/03/1961
97/401/05/1985
Wheels 1Co-Co1
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Split Headcode Box
To Service 10/03/1961 to Crewe North (5A)
Withdrawn 16/12/1986
Time in Service 25 yrs, 9 mths , 6 dys
Information Surplus to requirements,
Status Preserved

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 10/03/1961

Allocations - WIP
Code Subsequent Codes Name From Date
5A   Crewe North (New) on 10/03/1961
WL   Western Lines (LMR) on 18/04/1966
D05   Stoke Division on 17/06/1968
D09   Manchester Division w/e 10/05/1969
D08   Liverpool Division w/e 05/02/1972
KM   Carlisle Kingmoor w/e 11/08/1973
LO   Longsight w/e 10/05/1975
     Withdrawn on 22/01/1985
CD   Crewe Diesel (Reinstated) on 01/05/1985
     Withdrawn on 16/12/1986

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/01/1970   Steam heat boiler isolated        
by 30/08/1970   Steam heat boiler isolated        
by 12/1970   EQ Brakes Added        
12/1975   Air Brakes fitted        
12/1975   EQ Brakes Removed        
by 12/1977   Modified headcode box (black blinds with 2 marker lights)        

Configuration - WIP
Date Configuration Description Additional Diagram Source
10/03/1961 vb Vacuum brakes, Steam heat      
by 06/01/1970 vi Vacuum brakes, Isolated boiler      
by 30/08/1970 vi Vacuum brakes, Isolated boiler      
by 12/1970 vi Vacuum brakes, Isolated boiler EQ Brakes    
12/1975 xi Dual brakes, Isolated boiler      

Preservation
Current Status Unknown


Summary
Start Event Details Source See Also
10/03/1961 To Service To service as British Railways number D335
Built at English Electric Vulcan Foundry
Allocated to Crewe North (5A)
Livery applied: All over Green including front of cab
   
18/04/1966 Allocation Reallocated to Western Lines (LMR) (WL)    
17/06/1968 Allocation Reallocated to Stoke Division (D05)    
10/05/1969 Allocation Reallocated to Manchester Division (D09)    
06/01/1970 Modification Modification: Steam heat boiler isolated    
30/08/1970 Modification Modification: Steam heat boiler isolated    
12/1970 Modification Modification: EQ Brakes Added    
05/02/1972 Allocation Reallocated to Liverpool Division (D08)    
11/08/1973 Allocation Reallocated to Carlisle Kingmoor (KM)    
05/1974 Renumbered Renumbered to 40135    
10/05/1975 Allocation Reallocated to Longsight (LO)    
12/1975 Modification Modification: Air Brakes fitted    
12/1975 Modification Modification: EQ Brakes Removed    
12/1977 Modification Modification: Modified headcode box (black blinds with 2 marker lights)    
01/05/1985 Reinstated Reinstated to Crewe Diesel (CD)    
01/05/1985 Renumbered Renumbered to 97406    
16/12/1986 Withdrawn Condemned as 97406    

prev prev