Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 778 Today
» 4397 Yesterday
» 18581 Week
» 71597 Month
» 191124 Year
» 3217977 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D360 20/09/1961  
TOPS (Tops) 40160 02/1974  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4020/09/1961
Wheels 1Co-Co1
Builder English Electric Vulcan Foundry
Works Number 3106/D656
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Central Headcode Box
To Service 20/09/1961 to Haymarket (64B)
Withdrawn 26/11/1984
Time in Service 23 yrs, 2 mths , 6 dys
Cut Up 02/1987
Cut At Locomotive Works (Crewe, Cheshire)
Information Power unit damage
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 20/09/1961

Allocations - WIP
Code Subsequent Codes Name From Date
64B   Haymarket (New) on 20/09/1961
SP   Springs Branch (Wigan) m/e 09/1981
     Withdrawn on 26/11/1984

Configuration - WIP
Date Configuration Description Additional Diagram Source
20/09/1961 vb Vacuum brakes, Steam heat      


Summary
Start Event Details Source See Also
20/09/1961 To Service To service as British Railways number D360
Built at English Electric Vulcan Foundry, Works Number 3106
Allocated to Haymarket (64B)
Livery applied: All over Green including front of cab
   
02/1974 Renumbered Renumbered to 40160    
09/1981 Allocation Reallocated to Springs Branch (Wigan) (SP)    
26/11/1984 Withdrawn Condemned as 40160    
02/1987 Scrapped Broken up by Locomotive Works: Crewe, Cheshire    

prev prev