Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 12 Online
» 4249 Today
» 4163 Yesterday
» 17655 Week
» 70671 Month
» 190198 Year
» 3217051 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D3659 24/05/1958  
TOPS (Tops) 08504 02/1974  

Locomotive Specifics
Class as Built 08
Subclass/Rebuild History
ClassFrom
0824/05/1958
Wheels 0-6-0
Builder Doncaster Works
To Service 24/05/1958 to Sheffield Darnall (41A)
Withdrawn 30/10/1988 off Thornaby (TE)
Time in Service 30 yrs, 5 mths , 6 dys
Cut Up 23/09/1992
Cut At C F Booth (Rotherham)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
41A   Sheffield Darnall (New) on 24/05/1958
41B   Sheffield Darnall w/e 02/05/1964
41A   Tinsley w/e 09/10/1965
     Stored m/e 08/1977
IM   Immingham (Reinstated) m/e 09/1977
     Withdrawn on 30/10/1988

Configuration - WIP
Date Configuration Description Additional Diagram Source
24/05/1958 v Vacuum brakes      


Summary
Start Event Details Source See Also
24/05/1958 To Service To service as British Railways number D3659
Built at Doncaster Works
Allocated to Sheffield Darnall (41A)
   
02/05/1964 Allocation Reallocated to Sheffield Darnall (41B)    
09/10/1965 Allocation Reallocated to Tinsley (41A)    
02/1974 Renumbered Renumbered to 08504    
08/1977 To Store To Store    
09/1977 Reinstated Reinstated to Immingham (IM)    
30/10/1988 Withdrawn Condemned as 08504 from Thornaby (TE)    
23/09/1992 Scrapped Broken up by C F Booth: Rotherham    

prev prev