Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 3704 Today
» 4163 Yesterday
» 17110 Week
» 70126 Month
» 189653 Year
» 3216506 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 4074 m/e 12/1923

Names Carried
Date From Name
12/1923 CALDICOT CASTLE

Locomotive Specifics
Designer C. Collett
Class Castle
Company History GWR
Wheels 4-6-0
Builder Swindon Works
Order Number 224
To Service During 12/1923 to Unallocated (n/a)
Withdrawal Fri 03/05/1963 off Old Oak Common (81A)
Service Life 39 yrs, 5 mths , 3 dys

Disposal
Scrapping Sat 05/10/1963 at Locomotive Works (Swindon)

Tenders
Type Number From Company Water Coal
Churchward 3,500g 2216 12/1923 GWR 3,500g 7t 0cwt
Collett 3,500g Intermediate 2375 03/1925 GWR 3,500g
Churchward 3,500g 2035 08/1927 GWR 3,500g 7t 0cwt
Churchward 3,500g 2232 12/11/1928 GWR 3,500g 7t 0cwt
Collett 4,000g 2405 11/02/1929 GWR 4,000g 6t 0cwt
Collett 4,000g 2386 03/04/1930 GWR 4,000g 6t 0cwt
Collett 4,000g 2600 27/04/1932 GWR 4,000g 6t 0cwt
Collett 4,000g 2411 14/01/1936 GWR 4,000g 6t 0cwt
Collett 4,000g 2426 25/08/1937 GWR 4,000g 6t 0cwt
Collett 4,000g 2448 25/03/1938 GWR 4,000g 6t 0cwt
Collett 4,000g 2711 09/12/1938 GWR 4,000g 6t 0cwt
Collett 4,000g 2716 01/04/1940 GWR 4,000g 6t 0cwt
Collett 4,000g 2610 23/10/1941 GWR 4,000g 6t 0cwt
Collett 4,000g 2587 26/08/1943 GWR 4,000g 6t 0cwt
Collett 4,000g 2395 01/11/1944 GWR 4,000g 6t 0cwt
Collett 4,000g 2831 12/12/1945 GWR 4,000g 6t 0cwt
Collett 4,000g 2846 20/08/1947 GWR 4,000g 6t 0cwt
Collett 4,000g 2852 16/02/1949 GWR 4,000g 6t 0cwt
Collett 4,000g 2680 04/12/1950 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4007 15/02/1952 GWR 4,000g 6t 0cwt
Collett 4,000g 2424 20/08/1952 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4063 27/11/1952 GWR 4,000g 6t 0cwt
Collett 4,000g 2532 27/03/1954 GWR 4,000g 6t 0cwt
Collett 4,000g 2736 12/05/1954 GWR 4,000g 6t 0cwt
Collett 4,000g 2927 27/05/1955 GWR 4,000g 6t 0cwt
Collett 4,000g 2835 15/02/1956 GWR 4,000g 6t 0cwt
Collett 4,000g 2724 01/04/1957 GWR 4,000g 6t 0cwt
Collett 4,000g 2835 02/12/1957 GWR 4,000g 6t 0cwt
Collett 4,000g 2931 22/05/1958 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4111 15/04/1959 GWR 4,000g 6t 0cwt
Collett 4,000g 4010 30/10/1959 GWR 4,000g 6t 0cwt
Collett 4,000g 2747 19/04/1961 GWR 4,000g 6t 0cwt

Allocations
Code Subsequent Codes Name From Date
n/a   Unallocated (New) m/e 12/1923
PDN   Old Oak Common m/e 04/1924
NA   Newton Abbot m/e 12/1931
BRD   Bristol Bath Road on 27/05/1932
NA   Newton Abbot on 24/06/1932
LDR   Landore m/e 07/1933
EXE   Exeter on 16/09/1934
PDN   Old Oak Common on 28/03/1937
CDF   Cardiff Canton on 29/08/1937
LDR   Landore on 08/04/1940
PDN   Old Oak Common on 26/04/1941
LDR   Landore on 01/11/1941
LDR   Landore on 15/06/1947 (Snapshot)
87G   Carmarthen m/e 09/1956
87E   Landore m/e 06/1957
81A   Old Oak Common on 13/07/1959
87E   Landore on 12/08/1959
81D   Reading (W.R.) on 03/05/1960
82C   Swindon on 31/10/1960
82B   St Philips Marsh on 17/01/1962
81E   Didcot on 19/05/1962
81A   Old Oak Common on 17/12/1962
     Withdrawn on 03/05/1963

SLS Allocations*
Type Code Name From Date
ALLOC 87G Carmarthen 4w/e 06/10/1956
ALLOC 87E Landore 4w/e 10/08/1957
ALLOC 81D Reading (W.R.) 4w/e 21/05/1960
ALLOC 82C Swindon 4w/e 03/12/1960
ALLOC 82B St Philips Marsh 4w/e 27/01/1962
ALLOC 81E Didcot 4w/e 19/05/1962
ALLOC 81A Old Oak Common 4w/e 15/12/1962
WDN   4w/e 04/05/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/12/1925 Diagram HA boiler fitted (number 4654)
12/11/1928 Diagram HA boiler fitted (number 4602)
03/04/1930 Diagram HA boiler fitted (number 4657)
30/11/1931 Diagram HA boiler fitted (number 4650)
07/09/1934 Diagram HA boiler fitted (number 4643)
25/08/1937 Diagram HA boiler fitted (number 4616)
26/08/1943 Diagram HB boiler fitted (number 6614)
12/12/1945 Diagram HB boiler fitted (number 6680)
20/08/1947 Diagram HA boiler fitted (number 4620)
16/02/1949 Diagram HA boiler fitted (number 4636)
04/12/1950 Diagram HB boiler fitted (number 6686)
27/11/1952 Diagram HA boiler fitted (number 4628)
01/04/1957 Diagram HD boiler fitted (number 7648)
15/04/1959 Double Chimney fitted
19/04/1961 Diagram HD boiler fitted (number 7663)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Swindon Works 11/02/1925 15/03/1925 33 days Heavy Tender number 2375 (Collett 3,500g Intermediate) attached.
65310
Swindon Works 10/10/1925 24/12/1925 76 days Heavy Boiler number 4654 (Diagram HA)
107538
Swindon Works 05/03/1926 03/04/1926 30 days Light Repair    
Swindon Works 30/07/1926 04/08/1926 6 days Light Repair    
Swindon Works 06/09/1926 14/09/1926 9 days Light Repair    
Swindon Works 20/06/1927 29/09/1927 102 days Light Repair Tender number 2035 (Churchward 3,500g) attached.
 
Swindon Works 10/09/1928 19/11/1928 71 days Heavy Boiler number 4602 (Diagram HA)
Tender number 2232 (Churchward 3,500g) attached.
250885
Swindon Works 05/12/1928 22/12/1928 18 days Light Repair    
Swindon Works 28/01/1929 14/02/1929 18 days Light Repair Tender number 2405 (Collett 4,000g) attached.
 
Swindon Works 06/05/1929 16/05/1929 11 days Light Repair    
Swindon Works 30/01/1930 05/04/1930 66 days Heavy Boiler number 4657 (Diagram HA)
Tender number 2386 (Collett 4,000g) attached.
327350
Swindon Works 08/07/1930 16/08/1930 40 days Light Repair    
Swindon Works 14/09/1931 05/12/1931 83 days Heavy Boiler number 4650 (Diagram HA)
423921
Swindon Works 14/04/1932 03/05/1932 20 days Light Repair Tender number 2600 (Collett 4,000g) attached.
 
Swindon Works 12/05/1932 27/05/1932 16 days Light Repair    
Swindon Works 08/06/1932 24/06/1932 17 days Light Repair    
Swindon Works 17/05/1933 07/1933   Intermediate    
Swindon Works 03/07/1934 16/09/1934 76 days General Boiler number 4643 (Diagram HA)
543986
Swindon Works 19/11/1935 19/01/1936 62 days Intermediate Tender number 2411 (Collett 4,000g) attached.
624225
Swindon Works 18/11/1936 19/12/1936 32 days Light Repair    
Swindon Works 18/02/1937 24/02/1937 7 days Unclassified    
Swindon Works 13/03/1937 28/03/1937 16 days Light Repair    
Swindon Works 25/06/1937 29/08/1937 66 days General Boiler number 4616 (Diagram HA)
Tender number 2426 (Collett 4,000g) attached.
712168
Swindon Works 11/03/1938 27/03/1938 17 days Light Repair Tender number 2448 (Collett 4,000g) attached.
 
Swindon Works 25/10/1938 18/12/1938 55 days Intermediate Tender number 2711 (Collett 4,000g) attached.
796544
Swindon Works 22/08/1939 21/09/1939 31 days Light Repair    
Swindon Works 09/02/1940 08/04/1940 60 days Intermediate Tender number 2716 (Collett 4,000g) attached.
873569
Swindon Works 28/08/1941 01/11/1941 66 days Intermediate Tender number 2610 (Collett 4,000g) attached.
950010
Swindon Works 21/06/1943 03/09/1943 75 days General Boiler number 6614 (Diagram HB)
Tender number 2587 (Collett 4,000g) attached.
1032671
Swindon Works 28/09/1944 01/11/1944 35 days Light Repair Tender number 2395 (Collett 4,000g) attached.
 
Swindon Works 07/11/1945 12/12/1945 36 days Intermediate Boiler number 6680 (Diagram HB)
Tender number 2831 (Collett 4,000g) attached.
1140850
Swindon Works 16/07/1947 20/08/1947 36 days Intermediate Boiler number 4620 (Diagram HA)
Tender number 2846 (Collett 4,000g) attached.
1221651
Swindon Works 17/01/1949 16/02/1949 31 days Heavy General Boiler number 4636 (Diagram HA)
Tender number 2852 (Collett 4,000g) attached.
1290321
Swindon Works 27/10/1950 04/12/1950 39 days Heavy General Boiler number 6686 (Diagram HB)
Tender number 2680 (Collett 4,000g) attached.
1379395
Swindon Works 08/01/1952 15/02/1952 39 days Light Casual Tender number 4007 (Hawksworth 4,000g) attached.
 
Swindon Works 30/06/1952 20/08/1952 52 days Light Casual Tender number 2424 (Collett 4,000g) attached.
 
Swindon Works 16/09/1952 27/11/1952 73 days Heavy General Boiler number 4628 (Diagram HA)
Tender number 4063 (Hawksworth 4,000g) attached.
1448058
Swindon Works 18/03/1954 12/05/1954 56 days Heavy Casual Tender number 2532 (Collett 4,000g) attached.
 
Swindon Works 28/03/1955 27/05/1955 61 days Heavy Intermediate Tender number 2927 (Collett 4,000g) attached.
1545784
Swindon Works 19/12/1955 15/02/1956 59 days Light Casual Tender number 2835 (Collett 4,000g) attached.
 
Swindon Works 29/01/1957 01/04/1957 63 days Heavy General Boiler number 7648 (Diagram HD)
Tender number 2724 (Collett 4,000g) attached.
1620136
Swindon Works 20/02/1958 22/05/1958 92 days Light Casual Tender number 2931 (Collett 4,000g) attached.
 
Swindon Works 23/01/1959 15/04/1959 83 days Heavy Intermediate Tender number 4111 (Hawksworth 4,000g) attached.
Double Chimney fitted
1696234
Swindon Works 22/07/1959 12/08/1959 22 days Light Casual    
Swindon Works 05/10/1959 30/10/1959 26 days Unclassified Tender number 4010 (Collett 4,000g) attached.
 
Swindon Works 08/02/1961 19/04/1961 71 days Heavy General Boiler number 7663 (Diagram HD)
Tender number 2747 (Collett 4,000g) attached.
1778123

Mentions ...
Report Date Title Report Source
30/11/1945 Swindon Works Locos entering works during November: 13, 28, 1003, 1785, 2189, 2202/39/91, 2669, 2741, 2854, 2921/34/81, 3004/44, 3183, 3366, 3435/43, 3638, 3775/98, 3802/4/13/4/7/38/57/65, 4000/16/53/74/82/95/8, 4272 4543, 4643/58, 4826, 4965/82; 5005/17/20/6, 5125/37, 5327/50/84, 5413, 5502/23, 5735/8/59/69, 5905/16/23/32/3/9/58/69, 6002/8, 6125/57, 6353/97; 6846, 6951/4, 7243, 7712/8/73/4/7/84, 8755, 9797. The advent of a K3 to Swindon works has been commented upon in the January Journal: it has a hole in its blast pipe, a bad regulator blow-through.and a hot box on one of the driving wheels. It may be recalled that B12/3 8539 was seen on the works turntable in 1944 when she was on loan to W.D. for working Ambulance Trains, but it is not known whether, on that occasion, she had entered the works or was merely using the turntable due to some defect of the one at the shed.
The scale of withdrawals has been so great that the concentration yard has been overwhelmed, and some of the locos are stored in a road adjacent to the main line-2381/5, 2406, 1161, 3439, 2732/59 being noted- there on 21/12. Both latter engines had been dead at the home sheds for some time before their withdrawal.
SLS/194602
31/07/1947 Swindon Works Locos. entering Works during July included:-Nos. 1019, 2532, 2841, 2852, 2931, 2936, 2939, 2943, 3831, 3862, 4032, 4074, 4083, 5005, 5030, 5357, 5936, 5942, 5990, 6317, 6345, 6360, 6395, W.D. 77294, 78542 and 78632. No. 2651 WOS was ex Works on 5/7. New engines reported seen are:-Nos. 4155 BRD, 4156 STJ and 6753-55 CV.BRY. - The following have received 'TF' boilers: Nos. 1410, 3790, 4630, 6405, 8756, and 9707. 'Austerity' Nos. 77000, 77443, 78510, 78512, 78521, and 79235 are all ex repairs in Belgium and painted black. The new 67XX are the same as the earlier ones, in that they are not fitted with screw couplings, train heating, vacuum brake or A.T.C. equipment. They are, however, fitted with 'TF' boilers. SLS/194709
31/01/1949 Swindon Works New Work January: Nos. 6996 Blackwell Hall (RDG (4/1)), 6997 Bryn-Ivor Hall (17/1), 6998 Burton Agnes Hall (28/1); 6769 BRY (6/1). Locomotives entering Works 30/12/48 to 28/1/49: These included Nos. p24 (Petrol), 213/46 (Both acting as Works' pilots), 1007/08/19, 1369, 1426/29, 2016 (open cab), 2235/64/94, 2445, 2807/59, 2843, 2942/79/87, 3020/44, 3631/33, 3751, 3811/57 (damaged), 3818/28/55, 4017/41/46/53/59/74/78/79/86, 4122/37, 4225/82,, 4507/10/50/94, 4601, 4801 (Ex-Carriage Stock Shed-for conversion to coal-burning), 4912/15/21/35/58, 5014/27/29/49/57/61/92/93, 5108/34, 5225, 5307/33/48/58, 5502/05/12/31/53/72, 5909/49/61/97 , 6013/23/29, 6104/38/58/66, 6304/07/32/34/59/81, 6432, 6640, 6802/03/64/65/69, 6967, 7412, 7731/62/66/86/87, 7805, 8724/26, 9604/11/53, 9732/53/69, W.D. 77049 (badly damaged), 79279, 79309. Condemned: Nos. *1538, *1713, 2717 (all to Concentration Yard), 1889/97, 2767 (open cab), 2935, 3049, 3446/48, 4320. *After acting as Works' pilot.
Further locomotives painted black and fully lined, include Nos. 4900, 5997, 6930/39, while No. 2166 came out black and unlined-with the original boiler again. No. 3020 has had a heavy repair (with a change of boiler), fitted with a smokebox numberplate, but not re-painted
SLS/194903
19/02/1961 Swindon Works ('A' Shop) Gas Works Sidings: 1502/9, 1603/52, 3638/49, 3704, 4203, 5103/10/76, 6752/3/61/76, 7740, 8406/76, 9400/14/47/9/58, 9795. Stock Shed Yard: 1361/4, 1410/33/54, 4644, 5920, 6158, 6336, 7410/3, 7761, 8473. Triangle: 1366, 2227, 3799, 4170, 4287, 4587, 4978, 5207, 5519, 6425, 6864, 6979, 7704/76, 8457. Works Yard: 1014/25, 1625/9, 2207, 2516, 4099, 4701, 4902/15/81/5, 5025, 6003, 6131, 6945/53/61, 7000/20, 7325, 7775/94, 7902, 8454, 9481, 9701/49, 18000, 78000/8, L.T.E. L91. 'A' Shop: D604, D800/9/11/8/20/66-70, D1000-5, D2187-92, D3000/27, D3182, D6301/3/5, 7, 1017, 3806, 4073/4, 4128/31/48, 4274, 4574, 4919/24/7/30/5/54, 5008/19/27/9/32/68/71, 5900/23/72/85/6, 6023/7/9, 6122/44/7, 6368, 6822/51, 6917/29/36/51, 7033, 7908, 15100/4, 70024, 82032/9, 92232. Dump: 1601/2/10/20/59, 2813/9/32, 4550/9/94, 5331/91, 5510/4, 6333/52, 6775, 8419, 9462. 'C' Shop: 1616/44, 2846, 4281, 6382. SLS/196104
18/08/1963 Swindon Works (Dump) Triangle: 1432, 6437, 5679, 8444/86/91/94/96, 8766, 9401/79/83, 9715, D3103. Yard: 1621, 3668, 3711, 3826, 4082, 4175, 4265/98, 5645, 5933, 6011/25/26, 6159, 6815/19/28/35, 6931/32/61/78, 7909, 8738, 9412/40. 'A' Shop: D1023-26 (New in various stages of construction), D603, D801/4/40/61/2, D1004/9/16/9/50/63, D6305, D7075, 3605, 3738, 3850, 4115/57/68, 5971, 6000/18, 6129/65, 6809/15/37/68, 6937/44/78/94, 7902/27, 8403, 9662, 92246, Birmingham Pullman, uW60096. Top end of 'A' Shop: 15100/1/3, D3509/94/95, D3195, D3600, and N.C.B. 0-6-2 T. 67 (ex T.V.R.). Dismantling Shed: 5644, 5945. Dump: 3795, 4074, 5101/92, 5201, 5912/31, 7;412, 8783/91, 9713. Weigh House: D604, D808, 3823. On shed ex-Works: 9607, 9666. In store on shed: 1019, 2250, 2890, 3780, 3842, 4079, 4631, 4909, 4948, 5017, 5357, 5525/70, 5815, 5943, 9604 an W21. SLS/196309

Summary
Date Event Details Source See Also
12/1923 To Service To service as Great Western Railway Number 4074, name: CALDICOT CASTLE
Built at Swindon Works
Allocated to Unallocated (n/a)
Tender fitted: Churchward 3,500g
Diagram HA boiler fitted
   
04/1924 Allocation Reallocated to Old Oak Common (PDN)    
11/02/1925 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 11/02/1925. Dep: 15/03/1925.
Work undertaken:
Tender number 2375 (Collett 3,500g Intermediate) attached.
   
10/10/1925 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 10/10/1925. Dep: 24/12/1925.
Work undertaken:
Boiler number 4654 (Diagram HA)
   
05/03/1926 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 05/03/1926. Dep: 03/04/1926.    
30/07/1926 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 30/07/1926. Dep: 04/08/1926.    
06/09/1926 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 06/09/1926. Dep: 14/09/1926.    
20/06/1927 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 20/06/1927. Dep: 29/09/1927.
Work undertaken:
Tender number 2035 (Churchward 3,500g) attached.
   
10/09/1928 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 10/09/1928. Dep: 19/11/1928.
Work undertaken:
Boiler number 4602 (Diagram HA)
Tender number 2232 (Churchward 3,500g) attached.
   
05/12/1928 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 05/12/1928. Dep: 22/12/1928.    
28/01/1929 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 28/01/1929. Dep: 14/02/1929.
Work undertaken:
Tender number 2405 (Collett 4,000g) attached.
   
06/05/1929 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 06/05/1929. Dep: 16/05/1929.    
30/01/1930 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 30/01/1930. Dep: 05/04/1930.
Work undertaken:
Boiler number 4657 (Diagram HA)
Tender number 2386 (Collett 4,000g) attached.
   
08/07/1930 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 08/07/1930. Dep: 16/08/1930.    
14/09/1931 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 14/09/1931. Dep: 05/12/1931.
Work undertaken:
Boiler number 4650 (Diagram HA)
   
12/1931 Allocation Reallocated to Newton Abbot (NA)    
14/04/1932 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 14/04/1932. Dep: 03/05/1932.
Work undertaken:
Tender number 2600 (Collett 4,000g) attached.
   
12/05/1932 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 12/05/1932. Dep: 27/05/1932.    
27/05/1932 Allocation Reallocated to Bristol Bath Road (BRD)    
08/06/1932 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 08/06/1932. Dep: 24/06/1932.    
24/06/1932 Allocation Reallocated to Newton Abbot (NA)    
17/05/1933 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 17/05/1933. Dep: ?/07/1933.    
07/1933 Allocation Reallocated to Landore (LDR)    
03/07/1934 Works Visit Works Visit - Swindon Works (General) - Arr: 03/07/1934. Dep: 16/09/1934.
Work undertaken:
Boiler number 4643 (Diagram HA)
   
16/09/1934 Allocation Reallocated to Exeter (EXE)    
19/11/1935 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 19/11/1935. Dep: 19/01/1936.
Work undertaken:
Tender number 2411 (Collett 4,000g) attached.
   
18/11/1936 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 18/11/1936. Dep: 19/12/1936.    
18/02/1937 Works Visit Works Visit - Swindon Works (Unclassified) - Arr: 18/02/1937. Dep: 24/02/1937.    
13/03/1937 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 13/03/1937. Dep: 28/03/1937.    
28/03/1937 Allocation Reallocated to Old Oak Common (PDN)    
25/06/1937 Works Visit Works Visit - Swindon Works (General) - Arr: 25/06/1937. Dep: 29/08/1937.
Work undertaken:
Boiler number 4616 (Diagram HA)
Tender number 2426 (Collett 4,000g) attached.
   
29/08/1937 Allocation Reallocated to Cardiff Canton (CDF)    
11/03/1938 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 11/03/1938. Dep: 27/03/1938.
Work undertaken:
Tender number 2448 (Collett 4,000g) attached.
   
25/10/1938 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 25/10/1938. Dep: 18/12/1938.
Work undertaken:
Tender number 2711 (Collett 4,000g) attached.
   
22/08/1939 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 22/08/1939. Dep: 21/09/1939.    
09/02/1940 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 09/02/1940. Dep: 08/04/1940.
Work undertaken:
Tender number 2716 (Collett 4,000g) attached.
   
08/04/1940 Allocation Reallocated to Landore (LDR)    
26/04/1941 Allocation Reallocated to Old Oak Common (PDN)    
28/08/1941 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 28/08/1941. Dep: 01/11/1941.
Work undertaken:
Tender number 2610 (Collett 4,000g) attached.
   
01/11/1941 Allocation Reallocated to Landore (LDR)    
21/06/1943 Works Visit Works Visit - Swindon Works (General) - Arr: 21/06/1943. Dep: 03/09/1943.
Work undertaken:
Boiler number 6614 (Diagram HB)
Tender number 2587 (Collett 4,000g) attached.
   
28/09/1944 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 28/09/1944. Dep: 01/11/1944.
Work undertaken:
Tender number 2395 (Collett 4,000g) attached.
   
07/11/1945 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 07/11/1945. Dep: 12/12/1945.
Work undertaken:
Boiler number 6680 (Diagram HB)
Tender number 2831 (Collett 4,000g) attached.
   
15/06/1947 Allocation Allocation Snapshot - Landore (LDR)    
16/07/1947 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 16/07/1947. Dep: 20/08/1947.
Work undertaken:
Boiler number 4620 (Diagram HA)
Tender number 2846 (Collett 4,000g) attached.
   
17/01/1949 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 17/01/1949. Dep: 16/02/1949.
Work undertaken:
Boiler number 4636 (Diagram HA)
Tender number 2852 (Collett 4,000g) attached.
   
27/10/1950 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 27/10/1950. Dep: 04/12/1950.
Work undertaken:
Boiler number 6686 (Diagram HB)
Tender number 2680 (Collett 4,000g) attached.
   
08/01/1952 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 08/01/1952. Dep: 15/02/1952.
Work undertaken:
Tender number 4007 (Hawksworth 4,000g) attached.
   
30/06/1952 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 30/06/1952. Dep: 20/08/1952.
Work undertaken:
Tender number 2424 (Collett 4,000g) attached.
   
16/09/1952 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 16/09/1952. Dep: 27/11/1952.
Work undertaken:
Boiler number 4628 (Diagram HA)
Tender number 4063 (Hawksworth 4,000g) attached.
   
18/03/1954 Works Visit Works Visit - Swindon Works (Heavy Casual) - Arr: 18/03/1954. Dep: 12/05/1954.
Work undertaken:
Tender number 2532 (Collett 4,000g) attached.
   
28/03/1955 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 28/03/1955. Dep: 27/05/1955.
Work undertaken:
Tender number 2927 (Collett 4,000g) attached.
   
19/12/1955 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 19/12/1955. Dep: 15/02/1956.
Work undertaken:
Tender number 2835 (Collett 4,000g) attached.
   
09/1956 Allocation Reallocated to Carmarthen (87G)    
29/01/1957 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 29/01/1957. Dep: 01/04/1957.
Work undertaken:
Boiler number 7648 (Diagram HD)
Tender number 2724 (Collett 4,000g) attached.
   
06/1957 Allocation Reallocated to Landore (87E)    
06/1957 Report Report: No. 4074 has been modified with a double chimney and extended smokebox similarly to No. 4090. (Trains Illustrated - August, 1957)    
02/12/1957 Tender Tender fitted: Collett 4,000g number 2835    
20/02/1958 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 20/02/1958. Dep: 22/05/1958.
Work undertaken:
Tender number 2931 (Collett 4,000g) attached.
   
23/01/1959 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 23/01/1959. Dep: 15/04/1959.
Work undertaken:
Tender number 4111 (Hawksworth 4,000g) attached.
Double Chimney fitted
   
13/07/1959 Allocation Reallocated to Old Oak Common (81A)    
22/07/1959 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 22/07/1959. Dep: 12/08/1959.    
12/08/1959 Allocation Reallocated to Landore (87E)    
05/10/1959 Works Visit Works Visit - Swindon Works (Unclassified) - Arr: 05/10/1959. Dep: 30/10/1959.
Work undertaken:
Tender number 4010 (Collett 4,000g) attached.
   
03/05/1960 Allocation Reallocated to Reading (W.R.) (81D)    
31/10/1960 Allocation Reallocated to Swindon (82C)    
08/02/1961 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 08/02/1961. Dep: 19/04/1961.
Work undertaken:
Boiler number 7663 (Diagram HD)
Tender number 2747 (Collett 4,000g) attached.
   
17/01/1962 Allocation Reallocated to St Philips Marsh (82B)    
19/05/1962 Allocation Reallocated to Didcot (81E)    
17/12/1962 Allocation Reallocated to Old Oak Common (81A)    
03/05/1963 Withdrawn Condemned as 4074 from Old Oak Common (81A)    
05/10/1963 Scrapped Broken up by Locomotive Works: Swindon    

prev prev