29/02/1948 |
St Rollox Works |
The following locomotives have been painted in the temporary B.R. livery, i.e. unlined black with plain white lettering (tender number in brackets, followed by paint date):-Nos. 615 (4458) 9/2; 642 (4340) 18/2; 666 (4339) 1/3; 914 (4014) 17/2; 938 (4457) 26/2; 1138 (3555) 24/2; 2736 (4170) 29/2; 2749 (3336) 26/2; 2914 (4272) 20/2; 4323 (3817) 20/2; 5012 (9064) 9/2; 5018 (9829) 20/2; 5081 (9069) 2/2; 5082 (9005) 4/2; 5117 (9179) 24/2; 5127 (9713) 10/2; 5359 (9599) 19/2; 5459 (9593) 27/2; 5575 (9023) 10/2; 8185 (9912) 5/2; 8303 (10030) 12/2; 14476 (6173) 16/2; 14487 (6179) 25/2; 14501 (6209) 11/2; 17269 (910) 16/2; 17600 (1681) 11/2 and 17666 (1747) 12/2. No. 17313 arrived in the shops ex the dump on 20/2 and was cut up on 23/2. The boiler (Class N34 No. 1161) is to be repaired and used again |
SLS/194804 |
31/12/1949 |
St. Rollox Works |
Locomotives entering Works during December: These included Nos. 40150, 1110, 42163, 2801, 42808/36, 44318, 44700/97, 44958/72, 45036/47, 45122/27/51/58/63/69, 45364/66, 45461/70/89, 45579, 45644/92, 45715, 47163, 14507, 55161, 15199, 15218, 55233, 15361, 56025. 16166, 56239, 16285/92, 16316. 56336/69, 17242, 57340, 17354/84, 57599, 17672. No. 45575 is to be the first locomotive painted in the new green livery at St. Rollox. It will be noticed that the Works' shunter-No. 56025- is under repair, which is being replaced temporarily by No. 16035, which is on loan. |
SLS/195002 |
31/03/1950 |
Inverness Lochgorm Works |
Locomotives entering Works during March: These included Nos. 44787, 45127, 45467/77, 54471, 56301. |
SLS/195005 |
15/03/1963 |
Glasgow St. Rollox (Erecting Shop) |
Erecting Shop: 42261/71, 42912, 44791, 44931, 45127, 45309, D3209, D3346, D3563, D3916, D5121, D5325/30/42, D6102/24, D8098; awaiting works-D3008, D3881, D5348, D6107, 44979, 45319, 45423, 45498. Ex-Works: 45460, D6114. Diesel Test House: D3390, D5309, D5361; stored in paint shop-D6101/6/22/5/7/30. Works shunter: D3412. |
SLS/196304 |