Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 2022 Today
» 4397 Yesterday
» 19825 Week
» 72841 Month
» 192368 Year
» 3219221 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 5001 on 21/08/1926

Names Carried
Date From Name
21/08/1926 LLANDOVERY CASTLE

Locomotive Specifics
Designer C. Collett
Class Castle
Company History GWR
Wheels 4-6-0
Builder Swindon Works
Order Number 234
To Service Tue 21/08/1926 to Old Oak Common (PDN)
Withdrawal Tue 26/02/1963
Service Life 36 yrs, 6 mths , 5 dys

Disposal
Scrapping During 05/1964 at Cashmore's (Great Bridge)

Tenders
Type Number From Company Water Coal
Dean 4,000g 1582 21/08/1926 GWR 4,000g
Collett 4,000g 2540 22/03/1930 GWR 4,000g 6t 0cwt
Collett 4,000g 2585 18/08/1931 GWR 4,000g 6t 0cwt
Collett 8 wheeled 4,000g 2586 10/1931 GWR 4,000g 6t 0cwt
Collett 4,000g 2627 14/08/1936 GWR 4,000g 6t 0cwt
Collett 4,000g 2691 08/12/1937 GWR 4,000g 6t 0cwt
Collett 4,000g 2440 17/06/1939 GWR 4,000g 6t 0cwt
Collett 4,000g 2397 16/08/1939 GWR 4,000g 6t 0cwt
Collett 4,000g 2724 13/02/1941 GWR 4,000g 6t 0cwt
Collett 4,000g 2444 21/08/1942 GWR 4,000g 6t 0cwt
Collett 4,000g 2422 13/07/1944 GWR 4,000g 6t 0cwt
Collett 4,000g 2831 27/07/1945 GWR 4,000g 6t 0cwt
Collett 4,000g 2617 08/01/1946 GWR 4,000g 6t 0cwt
Collett 4,000g 2556 04/07/1946 GWR 4,000g 6t 0cwt
Collett 4,000g 2669 25/09/1946 GWR 4,000g 6t 0cwt
Collett 4,000g 2658 22/10/1946 GWR 4,000g 6t 0cwt
Collett 4,000g 2647 10/01/1947 GWR 4,000g 6t 0cwt
Collett 4,000g 2860 28/03/1947 GWR 4,000g 6t 0cwt
Collett 4,000g 2566 12/02/1948 GWR 4,000g 6t 0cwt
Collett 4,000g 2434 12/06/1948 GWR 4,000g 6t 0cwt
Collett 4,000g 2644 21/09/1949 GWR 4,000g 6t 0cwt
Collett 4,000g 2790 15/07/1950 GWR 4,000g 6t 0cwt
Collett 4,000g 2896 30/08/1950 GWR 4,000g 6t 0cwt
Collett 4,000g 2739 08/02/1952 GWR 4,000g 6t 0cwt
Collett 4,000g 2544 26/05/1953 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4060 27/01/1954 GWR 4,000g 6t 0cwt
Collett 4,000g 2729 05/10/1955 GWR 4,000g 6t 0cwt
Collett 4,000g 2547 26/11/1956 GWR 4,000g 6t 0cwt
Collett 4,000g 2876 23/02/1957 GWR 4,000g 6t 0cwt
Collett 4,000g 2744 22/01/1958 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4126 06/01/1960 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4098 28/07/1961 GWR 4,000g 6t 0cwt

Allocations
Code Subsequent Codes Name From Date
PDN   Old Oak Common (New) on 21/08/1926
CDF   Cardiff Canton on 26/08/1931
PDN   Old Oak Common on 20/09/1931
SRD   Stafford Road on 14/04/1935
CDF   Cardiff Canton on 13/12/1935
PDN   Old Oak Common on 15/12/1937
CDF   Cardiff Canton on 17/08/1939
CDF   Cardiff Canton on 15/06/1947 (Snapshot)
81A   Old Oak Common on 22/01/1958
84G   Shrewsbury on 26/09/1958
81A   Old Oak Common on 02/08/1960
     Stored (Old Oak Common) on 14/09/1962
81A   Old Oak Common (Reinstated) on 04/02/1963
     Withdrawn on 26/02/1963

SLS Allocations*
Type Code Name From Date
ALLOC 81A Old Oak Common 4w/e 26/01/1957
ALLOC 84G Shrewsbury 4w/e 04/10/1958
ALLOC 81A Old Oak Common 4w/e 13/08/1960
ALLOC 81A Old Oak Common 4w/e 09/02/1963
WDN 65   4w/e 09/03/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/03/1930 Diagram HA boiler fitted (number 4637)
18/08/1931 Diagram HA boiler fitted (number 4633)
23/02/1934 Diagram HA boiler fitted (number 4626)
14/08/1936 Diagram HA boiler fitted (number 4657)
21/08/1942 Diagram HB boiler fitted (number 6685)
04/07/1946 Diagram HA boiler fitted (number 4607)
12/02/1948 Diagram HB boiler fitted (number 6614)
21/09/1949 Diagram HB boiler fitted (number 6612)
08/02/1952 Diagram HA boiler fitted (number 4614)
05/10/1955 Diagram HA boiler fitted (number 4651)
22/01/1958 Diagram HB boiler fitted (number 6639)
06/01/1960 Diagram HC boiler fitted (number 7640)
28/07/1961 Double Chimney fitted
28/07/1961 Diagram HD boiler fitted (number 9607)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Swindon Works 25/08/1926 07/09/1926 14 days Light Repair Tender number 1582 (Dean 4,000g) attached.
Renumbered to GWR 5001
 
Swindon Works 11/11/1926 24/12/1926 44 days Light Repair    
Swindon Works 26/03/1928 12/06/1928 79 days Light Repair    
Swindon Works 03/12/1928 19/12/1928 17 days Light Repair    
Swindon Works 09/01/1930 01/04/1930 83 days Heavy Boiler number 4637 (Diagram HA)
Tender number 2540 (Collett 4,000g) attached.
209140
Swindon Works 29/05/1931 26/08/1931 90 days Heavy Boiler number 4633 (Diagram HA)
Tender number 2585 (Collett 4,000g) attached.
305292
Swindon Works 01/11/1932 01/1933   Intermediate   396347
Swindon Works 11/01/1934 04/03/1934 53 days General Boiler number 4626 (Diagram HA)
470832
Swindon Works 20/02/1935 14/04/1935 54 days Intermediate   542693
Swindon Works 22/06/1936 20/08/1936 60 days General Boiler number 4657 (Diagram HA)
Tender number 2627 (Collett 4,000g) attached.
619283
Swindon Works 28/10/1937 15/12/1937 49 days Intermediate Tender number 2691 (Collett 4,000g) attached.
706090
Swindon Works 01/05/1939 28/06/1939 59 days Intermediate Tender number 2440 (Collett 4,000g) attached.
795807
Swindon Works 20/07/1939 17/08/1939 29 days Light Repair Tender number 2397 (Collett 4,000g) attached.
 
Swindon Works 17/12/1940 16/02/1941 62 days Intermediate Tender number 2724 (Collett 4,000g) attached.
874513
Swindon Works 23/06/1942 23/00/1942   General    
Newton Abbot 08/01/1944 21/02/1944 45 days Light Repair    
Swindon Works 26/05/1944 21/07/1944 57 days Intermediate Tender number 2422 (Collett 4,000g) attached.
1046850
Swindon Works 30/05/1945 27/07/1945 59 days Light Repair Tender number 2831 (Collett 4,000g) attached.
 
Swindon Works 04/12/1945 08/01/1946 36 days Light Repair Tender number 2617 (Collett 4,000g) attached.
 
Swindon Works 31/05/1946 04/07/1946 35 days Intermediate Boiler number 4607 (Diagram HA)
Tender number 2556 (Collett 4,000g) attached.
1136891
Swindon Works 28/09/1946 22/10/1946 25 days Running Repairs Tender number 2658 (Collett 4,000g) attached.
 
Swindon Works 28/11/1946 10/01/1947 44 days Light Repair Tender number 2647 (Collett 4,000g) attached.
 
Swindon Works 12/03/1947 1 day Running Repairs    
Swindon Works 07/01/1948 12/02/1948 37 days General Boiler number 6614 (Diagram HB)
Tender number 2566 (Collett 4,000g) attached.
1205938
Swindon Works 19/08/1949 21/09/1949 34 days Heavy General Boiler number 6612 (Diagram HB)
Tender number 2644 (Collett 4,000g) attached.
1281622
Swindon Works 20/07/1950 30/08/1950 42 days Light Casual Tender number 2896 (Collett 4,000g) attached.
 
Swindon Works 01/01/1952 08/02/1952 39 days Heavy General Boiler number 4614 (Diagram HA)
Tender number 2739 (Collett 4,000g) attached.
1386272
Swindon Works 20/04/1953 26/05/1953 37 days Light Casual Tender number 2544 (Collett 4,000g) attached.
 
Swindon Works 18/11/1953 27/01/1954 71 days Heavy Intermediate Tender number 4060 (Hawksworth 4,000g) attached.
1483003
Swindon Works 17/07/1954 25/08/1954 40 days Light Casual    
Swindon Works 25/08/1955 05/10/1955 42 days Heavy General Boiler number 4651 (Diagram HA)
Tender number 2729 (Collett 4,000g) attached.
1562582
Swindon Works 22/05/1956 26/11/1956 189 days Light Casual Tender number 2547 (Collett 4,000g) attached.
 
Swindon Works 11/09/1957 22/01/1958 134 days Heavy General Boiler number 6639 (Diagram HB)
Tender number 2744 (Collett 4,000g) attached.
1644513
Swindon Works 28/01/1958 07/02/1958 11 days Light Casual    
Wolverhampton Works (Stafford Road) 13/02/1959 13/03/1959 29 days Unclassified    
Swindon Works 11/11/1959 06/01/1960 57 days Heavy Intermediate Boiler number 7640 (Diagram HC)
Tender number 4126 (Hawksworth 4,000g) attached.
1729040
Swindon Works 27/05/1961 28/07/1961 63 days Heavy General Boiler number 9607 (Diagram HD)
Tender number 4098 (Hawksworth 4,000g) attached.
Double Chimney fitted
1797375

Mentions ...
Report Date Title Report Source
31/12/1946 Swindon Works Locos. entering works during December included the following: 100, 1943, 2132, 2792, 2809, 2825, 2837, 2840, 2844, 2851, 2891, 2912, 2955, 2980, 2989, 3016, 3026, 3040, 3804, 3829, 3838, 3865, 4025, 4038, 4059, 4080, 4704, 4950, 4955, 5001, 5023, 5039, 5060, 5063, 5079, 5083, 5085, 5349, 5374, 5376, 5380, 5926, 5956, 5961, 6009, 6029, 6333, 6354, 6929, 6933, 6935, 6956, 7320, and W.D. 77001. Works' pilots during the same period have included: 200, 207, 242, 1731, 1732, 1761, 2723, and 2773. Practically all 57XX going through the works are now receiving a top-feed boiler. Locos. noted recently so altered are: 3766, 6709, 8711, 8753, and 8780 NEA (the latter was seen at Paddington on 28/12, working empty stock!). 5083 Bath Abbey ('Castle') is an oil burner with large tender having different shape fuel tanks. New 'Counties' reported are: 1020 (SRD), 1021 (PDN), and 1022 (LA) SLS/194702
31/03/1947 Swindon Works Locos. entering works during March included: 1701, 2401, 2474, 2534, 2612, 2702, 2787, 2843, 2908, 2924, 2938, 2981, 3018, 3024, 3029, 3447, 4000, 4075, 4098, 4318, 5001, 5014, 5057, 5065, 5066, 5077, 5093, 5348, 5367, 6320, 6340, 6394, 7316, L.M.S. 8454, W.D. 77288, 78671 and 79234. (Last of the present batch of W.D. 2-8-00 to undergo repair here). Further locos. to receive T.F. boilers are: 4634, 5423, 5750, 6414 and 7428. Works' pilots during March included: 200, 201, 242, 1731, 1795, 2733, 2773 and 3561. 5705 has appeared with the G.W.R. monogram painted on the pannier tanks. New engines reported are: 1027 WES, 1028 BRD, 9402/3 PDN. Straight-sided 4,000 gallon tenders: The design as modified to suit the 'Castles' differs from the original tenders built for the '1000' Class as follows: It is 6in. narrower across the sides to match the cab width of the engine, and the running-plate is lowered to the same height as that under the engine cab. (It may not be generally realised that the '1000' Class have wider cabs and slightly higher running-plates under the cabs than what has always been standard). The coal space between the tanks is narrower so as to maintain the width of tank unchanged, and the shovel hole is also narrower. There are one or two other very minor differences, but otherwise the two types are the same. It appears that while the modified design can be used with all engine classes for which 4,000 gallon tenders are authorised, the original type will be restricted to the '1000' Class. SLS/194705
31/01/1948 Swindon Works Locomotives entering Works during January included: Nos. 198, 250, 1009, 1531, 2793, 2859/80/99, 2929/51, 3011/12/44, 3800/07/09/14, 4076/83/87, 4375, 4408, 4542/61,.4854, 4917/87, 5000/01/19/22/30/33/35/48/65/69/75/91/99, 5928/39/46/58/77/94, 6000/03/17/22, 6357/80, 6821/23/62/74, 6906/32, 7001/07, 7308, 9083, W.D. 77005/58/64, 78543/714/717, 79226/34 an 79303. Engines condemned during the same period included Nos. 242, 504, an 3585. Works pilots recently have been: Nos. 198, 905, 1713, an 1781, while 3561 has been on the carriage side. New work: Nos. 6981 , 6982 and 6983 were completed on 20/1, 26/1, and 3/2 respectively; the construction of the 0-6-0 Diesel-electric shunters (Lot 364) is now under way, and the engine of the first one has been mounted on the frames. The first engine to be lettered 'BRITISH RAILWAYS' and to bear the prefix 'W' in yellow paint, under the numberplate was No. 4946 , which was ex Works on 8/1 (right-hand side only) and later emerged with both sides done on 16/1. Additional locomotives leaving the Works have been dealt with in various styles, as follows: Nos. 4100, 4217, an 5514 with 'BRITISH RAILWAYS' on the tank sides and prefixed with a yellow 'W' (Subsequently to 26/1, all prefixes have been in white paint). Nos. 1017, 4062, 4084, 4087, an 4951 were lettered 'BRITISH RAILWAYS' and prefixed 'W'; 2880, 5388, 5529, an 6736 with plain tenders and tanks and prefixed with a 'W,' while 2830 carried 'G.W.R.' on the tender and prefixed 'W.' On 23/1 No. 7007 had the old nameplates removed and was renamed Great Western, and on 30/1 No. 7001 emerged from the Works renamed Sir James Milne, with the tender bearing 'G.W.R.' and crest; the number had not been prefixed. All W.D.'s now entering the Works have had the Westinghouse pump removed, presumably at the running sheds SLS/194803
31/08/1949 Swindon Works New Work August: Nos. 7025 Sudeley Castle PDN (2/8), 7026 Tenby Castle (15/8), 7027 Thornbury Castle LA (25/8); 1503 PDN (8/8), 1504 PDN (17/8), 1505 PDN (29/8). Nos. 7025-27 are painted dark green and lined, while Nos. 1503-05 are unlined black. Contractor built: Nos. 8400 TYS, 8401 CDF, 8402 (W.G.B. 2912/49) PILL (26/8), 8450 (Y.E. Co. 2443/49) NPT (17/8). Nos. 8400-02/50 are unlined black. Condemned: Nos. 289 (original T.V. R/T boiler and curved top tanks), 1884 (closed cab), 1930 (open cab), 2902, 3182 an 3419. No. 6320 has been re-converted to coal-burning. Locomotives entering Works during August included: Nos. 1000/04/25, 1427/37, 2117 (closed cab), 2211/12/14/21/67, 2462, 2815/52/75/87, 3016/20, 3174/86, 3635/77, 3715/99, 3805/14/43, 4013/15/33/47/80, 4107/48/49/55, 4269/78, 4502/10/59/65/82/92/95, 4637/50/79/97, 4906/51/81, 5001/18/30/42/57/76/80/94/99, 5206, 5344/45/80, 5501/05/22/37/54, 5749, 5804, 5904/12/21/27/44/45/47/66, 6000/04/19, 6105/07/43/61, 6338/77, 6408/31, 6741, 6808/19/28/29/44, 6905/65, 7219/36, 7310, 7414, 7718, 7815/16, 7904, 8789, 9638 an 90712. Further locomotives painted black and fully lined include Nos. 1005/12, 4901/23/50, 5912/18 an 6920. September: A batch of new Class '2' 2-6-2T's and Class '4' 2-6-0's is to be built here. They will be similar to existing L.M.S. designs, but will have modified G.W.R. boilers. The frames have already been cut for five of the 2-6-0's. SLS/194910
28/05/1961 Swindon Works (Triangle) Gas Works: 4203, 5103/10/76, 9414. Stock Shed Yard: D817, D6319/21, 5815. Triangle: 1361/2/4, 1433, 1647, 3657/67/70/7, 3724, 5001, 6027, 6959, 8457, 8705, 9762. Works Yard: D804/38, D2144/88/91/6, D7000, 1029, 1501/2/9, 1604, 2516, 2884, 4090, 4950/72/8/85, 5022/97, 5949/58, 6004, 6937/62, 7007, 7221, 7304/40, 7761/75, 9400, 9749, 82031, 92226/45. Weigh House: D808, 4984. 'A' Shop: D602, D801/15/8/36/40/3/50/69/70, D1000-7, D2195/7-9, D2372-4, D3257, D6305/9, 3817, 4088, 4264/75, 4704, 4912/4/42/70/88/94, 5015/51/70/2/99, 5914/48/51/3/70/87, 6020, 6333/72, 6828/44/50, 6911/69/77/9, 7002/9/32/6, 7232/3, 13187, 13256/62, 15100/2, 82020/1, 92234. Dump: 1366, 1419/31/54/73, 2207/27, 3676, 5158/75/94, 5771/91, 6426, 7748, 8429, 8722/6/40/69/77, 9735/81. 'C' Shop: 5207, 8101. Field: 78001/8. SLS/196107
23/07/1961 Swindon Works ('A' Shop) 'A' Shop: D602/4, D805/11/28/70, D1000-11, D2137, D2372-9, D3257, D3431, D3744, D6306/11/9, 13186, 13264/5, 15100/2, 2829, 3817/43, 4090, 4922/8/56/78, 5000/1/31/49/60, 5306/51, 5903/4/36/9/67, 6000/4/7, 6363/95, 6871, 6919/46/59/86/97/8, 7020, 7209/15/21/2, 7826, 82031, 92226/34. Works Yard: D804/15/23/41/51/2, D2188/9/94, 1604/34/47, 2516, 3667/70, 3822/41, 4003, 4203, 4916/98, 5015/80/1, 5103/10/76/7/95, 5336, 5949, 6027, 6349, 6831, 6969, 7745/56/75/98, 8789/98, 9400/14, 9749, 78001/8. 92215/45. Triangle: 6021, 9736/67. Dump: 1361/2/4/6, 1419/33, 3657/76, 3724, 6426, 7700/61, 8429, 8705/22/40/77/96, 9735/62/71/81. 'C' Shop: 8457 intact, Outside 'C' Shop: 5771, 8726 being cut up. SLS/196109

Summary
Date Event Details Source See Also
21/08/1926 To Service To service as Great Western Railway Number 5001, name: LLANDOVERY CASTLE
Built at Swindon Works
Allocated to Old Oak Common (PDN)
Diagram HA boiler fitted
   
25/08/1926 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 25/08/1926. Dep: 07/09/1926.
Work undertaken:
Tender number 1582 (Dean 4,000g) attached.
Renumbered to GWR 5001
   
11/11/1926 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 11/11/1926. Dep: 24/12/1926.    
26/03/1928 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 26/03/1928. Dep: 12/06/1928.    
03/12/1928 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 03/12/1928. Dep: 19/12/1928.    
09/01/1930 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 09/01/1930. Dep: 01/04/1930.
Work undertaken:
Boiler number 4637 (Diagram HA)
Tender number 2540 (Collett 4,000g) attached.
   
29/05/1931 Works Visit Works Visit - Swindon Works (Heavy) - Arr: 29/05/1931. Dep: 26/08/1931.
Work undertaken:
Boiler number 4633 (Diagram HA)
Tender number 2585 (Collett 4,000g) attached.
   
26/08/1931 Allocation Reallocated to Cardiff Canton (CDF)    
20/09/1931 Allocation Reallocated to Old Oak Common (PDN)    
10/1931 Tender Tender fitted: Collett 8 wheeled 4,000g number 2586    
01/11/1932 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 01/11/1932. Dep: ?/01/1933.    
11/01/1934 Works Visit Works Visit - Swindon Works (General) - Arr: 11/01/1934. Dep: 04/03/1934.
Work undertaken:
Boiler number 4626 (Diagram HA)
   
20/02/1935 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 20/02/1935. Dep: 14/04/1935.    
14/04/1935 Allocation Reallocated to Stafford Road (SRD)    
13/12/1935 Allocation Reallocated to Cardiff Canton (CDF)    
22/06/1936 Works Visit Works Visit - Swindon Works (General) - Arr: 22/06/1936. Dep: 20/08/1936.
Work undertaken:
Boiler number 4657 (Diagram HA)
Tender number 2627 (Collett 4,000g) attached.
   
28/10/1937 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 28/10/1937. Dep: 15/12/1937.
Work undertaken:
Tender number 2691 (Collett 4,000g) attached.
   
15/12/1937 Allocation Reallocated to Old Oak Common (PDN)    
01/05/1939 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 01/05/1939. Dep: 28/06/1939.
Work undertaken:
Tender number 2440 (Collett 4,000g) attached.
   
20/07/1939 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 20/07/1939. Dep: 17/08/1939.
Work undertaken:
Tender number 2397 (Collett 4,000g) attached.
   
17/08/1939 Allocation Reallocated to Cardiff Canton (CDF)    
17/12/1940 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 17/12/1940. Dep: 16/02/1941.
Work undertaken:
Tender number 2724 (Collett 4,000g) attached.
   
23/06/1942 Works Visit Works Visit - Swindon Works (General) - Arr: 23/06/1942. Dep: 23/00/1942.    
21/08/1942 Modification Diagram HB number 6685 boiler fitted    
21/08/1942 Tender Tender fitted: Collett 4,000g number 2444    
08/01/1944 Works Visit Works Visit - Newton Abbot (Light Repair) - Arr: 08/01/1944. Dep: 21/02/1944.    
26/05/1944 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 26/05/1944. Dep: 21/07/1944.
Work undertaken:
Tender number 2422 (Collett 4,000g) attached.
   
30/05/1945 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 30/05/1945. Dep: 27/07/1945.
Work undertaken:
Tender number 2831 (Collett 4,000g) attached.
   
04/12/1945 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 04/12/1945. Dep: 08/01/1946.
Work undertaken:
Tender number 2617 (Collett 4,000g) attached.
   
31/05/1946 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 31/05/1946. Dep: 04/07/1946.
Work undertaken:
Boiler number 4607 (Diagram HA)
Tender number 2556 (Collett 4,000g) attached.
   
25/09/1946 Tender Tender fitted: Collett 4,000g number 2669    
28/09/1946 Works Visit Works Visit - Swindon Works (Running Repairs) - Arr: 28/09/1946. Dep: 22/10/1946.
Work undertaken:
Tender number 2658 (Collett 4,000g) attached.
   
28/11/1946 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 28/11/1946. Dep: 10/01/1947.
Work undertaken:
Tender number 2647 (Collett 4,000g) attached.
   
12/03/1947 Works Visit Works Visit - Swindon Works (Running Repairs) - Arr: 12/03/1947.    
28/03/1947 Tender Tender fitted: Collett 4,000g number 2860    
15/06/1947 Allocation Allocation Snapshot - Cardiff Canton (CDF)    
07/01/1948 Works Visit Works Visit - Swindon Works (General) - Arr: 07/01/1948. Dep: 12/02/1948.
Work undertaken:
Boiler number 6614 (Diagram HB)
Tender number 2566 (Collett 4,000g) attached.
   
12/06/1948 Tender Tender fitted: Collett 4,000g number 2434    
19/08/1949 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 19/08/1949. Dep: 21/09/1949.
Work undertaken:
Boiler number 6612 (Diagram HB)
Tender number 2644 (Collett 4,000g) attached.
   
15/07/1950 Tender Tender fitted: Collett 4,000g number 2790    
20/07/1950 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 20/07/1950. Dep: 30/08/1950.
Work undertaken:
Tender number 2896 (Collett 4,000g) attached.
   
01/01/1952 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 01/01/1952. Dep: 08/02/1952.
Work undertaken:
Boiler number 4614 (Diagram HA)
Tender number 2739 (Collett 4,000g) attached.
   
20/04/1953 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 20/04/1953. Dep: 26/05/1953.
Work undertaken:
Tender number 2544 (Collett 4,000g) attached.
   
18/11/1953 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 18/11/1953. Dep: 27/01/1954.
Work undertaken:
Tender number 4060 (Hawksworth 4,000g) attached.
   
17/07/1954 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 17/07/1954. Dep: 25/08/1954.    
25/08/1955 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 25/08/1955. Dep: 05/10/1955.
Work undertaken:
Boiler number 4651 (Diagram HA)
Tender number 2729 (Collett 4,000g) attached.
   
22/05/1956 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 22/05/1956. Dep: 26/11/1956.
Work undertaken:
Tender number 2547 (Collett 4,000g) attached.
   
23/02/1957 Tender Tender fitted: Collett 4,000g number 2876    
11/09/1957 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 11/09/1957. Dep: 22/01/1958.
Work undertaken:
Boiler number 6639 (Diagram HB)
Tender number 2744 (Collett 4,000g) attached.
   
22/01/1958 Allocation Reallocated to Old Oak Common (81A)    
28/01/1958 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 28/01/1958. Dep: 07/02/1958.    
26/09/1958 Allocation Reallocated to Shrewsbury (84G)    
13/02/1959 Works Visit Works Visit - Wolverhampton Works (Stafford Road) (Unclassified) - Arr: 13/02/1959. Dep: 13/03/1959.    
11/11/1959 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 11/11/1959. Dep: 06/01/1960.
Work undertaken:
Boiler number 7640 (Diagram HC)
Tender number 4126 (Hawksworth 4,000g) attached.
   
02/08/1960 Allocation Reallocated to Old Oak Common (81A)    
27/05/1961 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 27/05/1961. Dep: 28/07/1961.
Work undertaken:
Boiler number 9607 (Diagram HD)
Tender number 4098 (Hawksworth 4,000g) attached.
Double Chimney fitted
   
14/09/1962 To Store To Store at Old Oak Common (81A)    
04/02/1963 Reinstated Reinstated to Old Oak Common (81A)    
26/02/1963 Withdrawn      
05/1964 Scrapped Broken up by Cashmore's: Great Bridge    

prev prev