Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 14 Online
» 922 Today
» 4163 Yesterday
» 14328 Week
» 67344 Month
» 186871 Year
» 3213724 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D5009 14/03/1959  
TOPS (Tops) 24009 04/1974  

Locomotive Specifics
Class as Built 24
Subclass/Rebuild History
ClassFrom
24/014/03/1959
Wheels Bo-Bo
Builder Derby Works
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Multiple Fitting Blue Star
Other Details Disc Route Indicators
To Service 14/03/1959 to Derby (17A)
Withdrawn 18/07/1976
Time in Service 17 yrs, 4 mths , 4 dys
Cut Up 30/11/1977
Cut At Locomotive Works (Doncaster)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP Green all over with a narrow white band around the bottom of the bodywork 14/03/1959
BFYE BR Blue bodywork, full yellow cab front by 11/1970

Allocations - WIP
Code Subsequent Codes Name From Date
17A   Derby (New) on 14/03/1959
73C   Hither Green w/e 28/03/1959
5B   Crewe South w/e 12/05/1962
5A   Crewe North w/e 12/05/1962
1A   Willesden w/e 23/11/1963
5A   Crewe North w/e 05/12/1964
1B   Camden w/e 09/01/1965
1E   Bletchley w/e 03/01/1966
D01   London Division on 18/04/1966
D05   Stoke Division w/e 22/04/1967
65A   Eastfield w/e 06/03/1971
     Stored 4w/e 23/08/1975
HA   Haymarket (Reinstated) on 08/09/1975
     Stored 4w/e 29/05/1976
     Withdrawn on 18/07/1976

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
25/07/1962 R.11194 Engine hours recorder fitted   £18/18/2   £18/18/2
08/08/1964 A/RC/4 Modifications to Stone Vapor generators   £219/16/4   £219/16/4
08/08/1964 A/RC/1 BR Automatic Warning System (AWS) fitted   £324/-/-   £324/-/-
by 06/01/1970   Steam heat boiler isolated        
by 30/08/1970   Steam heat boiler isolated        

Configuration - WIP
Date Configuration Description Additional Diagram Source
14/03/1959 vb Vacuum brakes, Steam heat      
08/08/1964 vb Vacuum brakes, Steam heat BR AWS    
by 06/01/1970 vi Vacuum brakes, Isolated boiler BR AWS    
by 30/08/1970 vi Vacuum brakes, Isolated boiler BR AWS    


Summary
Start Event Details Source See Also
14/03/1959 To Service To service as British Railways number D5009
Built at Derby Works
Allocated to Derby (17A)
Livery applied: Green all over with a narrow white band around the bottom of the bodywork
   
28/03/1959 Allocation Reallocated to Hither Green (73C)    
12/05/1962 Allocation Reallocated to Crewe North (5A)    
12/05/1962 Allocation Reallocated to Crewe South (5B)    
25/07/1962 Modification Modification: Engine hours recorder fitted    
23/11/1963 Allocation Reallocated to Willesden (1A)    
08/08/1964 Modification Modification: BR Automatic Warning System (AWS) fitted    
08/08/1964 Modification Modification: Modifications to Stone Vapor generators    
05/12/1964 Allocation Reallocated to Crewe North (5A)    
09/01/1965 Allocation Reallocated to Camden (1B)    
03/01/1966 Allocation Reallocated to Bletchley (1E)    
18/04/1966 Allocation Reallocated to London Division (D01)    
22/04/1967 Allocation Reallocated to Stoke Division (D05)    
06/01/1970 Modification Modification: Steam heat boiler isolated    
30/08/1970 Modification Modification: Steam heat boiler isolated    
11/1970 Livery Change of livery to BR Blue bodywork, full yellow cab front    
06/03/1971 Allocation Reallocated to Eastfield (65A)    
04/1974 Renumbered Renumbered to 24009    
23/08/1975 To Store To Store    
08/09/1975 Reinstated Reinstated to Haymarket (HA)    
29/05/1976 To Store To Store    
18/07/1976 Withdrawn Condemned as 24009    
30/11/1977 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev