Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 4120 Today
» 4163 Yesterday
» 17526 Week
» 70542 Month
» 190069 Year
» 3216922 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D5013 18/04/1959  
TOPS (Tops) 24013 01/12/1973  

Locomotive Specifics
Class as Built 24
Subclass/Rebuild History
ClassFrom
24/018/04/1959
Wheels Bo-Bo
Builder Derby Works
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Multiple Fitting Blue Star
Other Details Disc Route Indicators
To Service 18/04/1959 to Crewe South (5B)
Withdrawn 05/10/1975
Time in Service 16 yrs, 5 mths , 17 dys
Cut Up 28/02/1978
Cut At Locomotive Works (Doncaster)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP Green all over with a narrow white band around the bottom of the bodywork 18/04/1959

Allocations - WIP
Code Subsequent Codes Name From Date
5B   Crewe South (New) on 18/04/1959
17A   Derby (on loan) w/e 18/04/1959
73C   Hither Green (on loan) w/e 25/04/1959
5B   Crewe South w/e 16/06/1962
2A   Rugby w/e 28/07/1962
D01   London Division on 18/04/1966
D05   Stoke Division w/e 30/04/1966
D02   Birmingham Division w/e 01/10/1966
D05   Stoke Division w/e 03/06/1967
     Stored (at D05) w/e 26/04/1969
55A   Holbeck (MR) w/e 11/10/1969
66A   Polmadie w/e 16/10/1971
65A   Eastfield 5w/e 01/04/1972
     Stored 5w/e 26/07/1975
     Withdrawn on 05/10/1975

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
04/04/1963 A/RC/1 BR Automatic Warning System (AWS) fitted   £324/-/-   £324/-/-
11/07/1964 A/RC/4 Modifications to Stone Vapor generators   £323/13/4   £323/13/4
by 30/08/1970   Steam heat boiler isolated        
11/1971   Steam heat boiler reinstated        

Configuration - WIP
Date Configuration Description Additional Diagram Source
18/04/1959 vb Vacuum brakes, Steam heat      
04/04/1963 vb Vacuum brakes, Steam heat BR AWS    
by 30/08/1970 vi Vacuum brakes, Isolated boiler BR AWS    
11/1971 vb Vacuum brakes, Steam heat BR AWS    


Sightings
Report Date Title Location Report Headcode Reference
01/03/1975 Eastfield shed visit Eastfield On shed   Bruce Strong, Facebook

Summary
Start Event Details Source See Also
18/04/1959 Allocation Loaned to Derby (17A)    
18/04/1959 To Service To service as British Railways number D5013
Built at Derby Works
Allocated to Crewe South (5B)
Livery applied: Green all over with a narrow white band around the bottom of the bodywork
   
25/04/1959 Allocation Loaned to Hither Green (73C)    
16/06/1962 Allocation Reallocated to Crewe South (5B)    
28/07/1962 Allocation Reallocated to Rugby (2A)    
04/04/1963 Modification Modification: BR Automatic Warning System (AWS) fitted    
11/07/1964 Modification Modification: Modifications to Stone Vapor generators    
18/04/1966 Allocation Reallocated to London Division (D01)    
30/04/1966 Allocation Reallocated to Stoke Division (D05)    
01/10/1966 Allocation Reallocated to Birmingham Division (D02)    
03/06/1967 Allocation Reallocated to Stoke Division (D05)    
26/04/1969 To Store To Store (at D05)    
11/10/1969 Allocation Reallocated to Holbeck (MR) (55A)    
30/08/1970 Modification Modification: Steam heat boiler isolated    
16/10/1971 Allocation Reallocated to Polmadie (66A)    
11/1971 Modification Modification: Steam heat boiler reinstated    
01/04/1972 Allocation Reallocated to Eastfield (65A)    
01/12/1973 Renumbered Renumbered to 24013    
26/07/1975 To Store To Store    
05/10/1975 Withdrawn Condemned as 24013    
28/02/1978 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev