Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 22 Online
» 1708 Today
» 4397 Yesterday
» 19511 Week
» 72527 Month
» 192054 Year
» 3218907 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 5057 on 26/06/1936

Names Carried
Date From Name
26/06/1936 PENRICE CASTLE
06/10/1937 EARL WALDEGRAVE

Locomotive Specifics
Designer C. Collett
Class Castle
Company History GWR
Wheels 4-6-0
Builder Swindon Works
Order Number 303
To Service Tue 26/06/1936 to Newton Abbot (NA)
Withdrawal Tue 10/03/1964 off Old Oak Common (81A)
Service Life 27 yrs, 8 mths , 13 dys

Disposal
Scrapping During 08/1964 at Locomotive Works (Swindon)

Tenders
Type Number From Company Water Coal
Collett 4,000g 2696 26/06/1936 GWR 4,000g 6t 0cwt
Collett 4,000g 2688 08/07/1938 GWR 4,000g 6t 0cwt
Collett 4,000g 2565 30/04/1940 GWR 4,000g 6t 0cwt
Collett 4,000g 2443 13/02/1941 GWR 4,000g 6t 0cwt
Collett 4,000g 2682 21/06/1941 GWR 4,000g 6t 0cwt
Collett 4,000g 2405 13/11/1942 GWR 4,000g 6t 0cwt
Collett 4,000g 2551 30/11/1944 GWR 4,000g 6t 0cwt
Collett 4,000g 2809 22/01/1946 GWR 4,000g 6t 0cwt
Collett 4,000g 2533 23/04/1947 GWR 4,000g 6t 0cwt
Collett 4,000g 2627 06/05/1949 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4031 17/02/1950 GWR 4,000g 6t 0cwt
Collett 4,000g 2409 31/08/1950 GWR 4,000g 6t 0cwt
Collett 4,000g 2722 01/03/1951 GWR 4,000g 6t 0cwt
Collett 4,000g 2389 22/11/1951 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4072 30/04/1952 GWR 4,000g 6t 0cwt
Collett 4,000g 2693 09/09/1952 GWR 4,000g 6t 0cwt
Collett 4,000g 2904 08/10/1953 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4003 08/06/1954 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4051 22/11/1954 GWR 4,000g 6t 0cwt
Collett 4,000g 2847 09/05/1955 GWR 4,000g 6t 0cwt
Collett 4,000g 2773 05/04/1956 GWR 4,000g 6t 0cwt
Collett 4,000g 2610 31/07/1958 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4099 24/03/1960 GWR 4,000g 6t 0cwt
Collett 4,000g 2624 17/05/1962 GWR 4,000g 6t 0cwt

Allocations
Code Subsequent Codes Name From Date
NA   Newton Abbot (New) on 26/06/1936
EXE   Exeter m/e 03/1938
NA   Newton Abbot m/e 04/1938
LA   Laira m/e 01/1939
LA   Laira on 15/06/1947 (Snapshot)
81A   Old Oak Common m/e 31/01/1951
81A   Old Oak Common on 01/03/1951
83D   Laira 4w/e 26/01/1952
83A   Newton Abbot m/e 02/1952
83D   Laira on 30/04/1952
82A   Bristol Bath Road on 08/06/1954
84C   Banbury on 04/11/1959
81A   Old Oak Common on 24/03/1960
     Withdrawn on 10/03/1964

SLS Allocations*
Type Code Name From Date
ALLOC 81A Old Oak Common m/e 31/01/1951
ALLOC 83D Laira 4w/e 26/01/1952
ALLOC 82A Bristol Bath Road 4w/e 19/06/1954
ALLOC 84C Banbury 4w/e 28/11/1959
ALLOC 81A Old Oak Common 4w/e 23/04/1960
WDN   on 10/03/1964
WDN   5w/e 30/03/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
30/04/1940 Diagram HB boiler fitted (number 6628)
30/11/1944 Diagram HB boiler fitted (number 6639)
23/04/1947 Diagram HA boiler fitted (number 4626)
06/05/1949 Diagram HB boiler fitted (number 6652)
01/03/1951 Diagram HA boiler fitted (number 4611)
08/06/1954 Diagram HD boiler fitted (number 7651)
31/07/1958 Double Chimney fitted
31/07/1958 Diagram HD boiler fitted (number 7675)
24/03/1960 Diagram HB boiler fitted (number 6645)
17/05/1962 Diagram HD boiler fitted (number 7672)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Swindon Works 14/01/1937 1 day Running Repairs    
Swindon Works 10/05/1938 14/07/1938 66 days Intermediate Tender number 2688 (Collett 4,000g) attached.
120649
Swindon Works 28/06/1939 23/07/1939 26 days Light Repair    
Swindon Works 12/03/1940 11/05/1940 61 days General Boiler number 6628 (Diagram HB)
Tender number 2565 (Collett 4,000g) attached.
224980
Swindon Works 07/02/1941 14/02/1941 8 days Light Repair Tender number 2443 (Collett 4,000g) attached.
 
Swindon Works 06/10/1942 16/11/1942 42 days Intermediate Tender number 2405 (Collett 4,000g) attached.
351430
Swindon Works 12/10/1944 30/11/1944 50 days General Boiler number 6639 (Diagram HB)
Tender number 2551 (Collett 4,000g) attached.
437234
Swindon Works 18/12/1945 22/01/1946 36 days Light Repair Tender number 2809 (Collett 4,000g) attached.
 
Swindon Works 11/03/1947 23/04/1947 44 days Intermediate Boiler number 4626 (Diagram HA)
Tender number 2533 (Collett 4,000g) attached.
530046
Swindon Works 10/09/1948 11/10/1948 32 days Light Repair    
Swindon Works 21/01/1949 11/02/1949 22 days Light Casual    
Swindon Works 29/03/1949 06/05/1949 39 days Heavy General Boiler number 6652 (Diagram HB)
Tender number 2627 (Collett 4,000g) attached.
607350
Swindon Works 09/08/1949 19/08/1949 11 days Light Casual    
Swindon Works 23/01/1950 17/02/1950 26 days Light Casual Tender number 4031 (Hawksworth 4,000g) attached.
 
Swindon Works 09/08/1950 31/08/1950 23 days Light Casual Tender number 2409 (Collett 4,000g) attached.
 
Swindon Works 19/01/1951 01/03/1951 42 days Heavy General Boiler number 4611 (Diagram HA)
Tender number 2722 (Collett 4,000g) attached.
687140
Swindon Works 23/10/1951 22/11/1951 31 days Light Casual Tender number 2389 (Collett 4,000g) attached.
 
Swindon Works 25/03/1952 30/04/1952 37 days Light Casual Tender number 4072 (Hawksworth 4,000g) attached.
 
Swindon Works 25/07/1952 10/09/1952 48 days Heavy Intermediate Tender number 2693 (Collett 4,000g) attached.
772537
Swindon Works 01/09/1953 08/10/1953 38 days Light Casual Tender number 2904 (Collett 4,000g) attached.
 
Swindon Works 03/04/1954 08/06/1954 67 days Heavy General Boiler number 7651 (Diagram HD)
Tender number 4003 (Hawksworth 4,000g) attached.
868089
Swindon Works 09/10/1954 22/11/1954 45 days Light Casual Tender number 4051 (Hawksworth 4,000g) attached.
 
Swindon Works 23/03/1955 09/05/1955 48 days Light Casual Tender number 2847 (Collett 4,000g) attached.
 
Swindon Works 15/02/1956 05/04/1956 51 days Heavy Intermediate Tender number 2773 (Collett 4,000g) attached.
951085
Swindon Works 09/05/1958 31/07/1958 84 days Heavy General Boiler number 7675 (Diagram HD)
Tender number 2610 (Collett 4,000g) attached.
Double Chimney fitted
1057634
Swindon Works 04/01/1960 24/03/1960 81 days Heavy Intermediate Boiler number 6645 (Diagram HB)
Tender number 4099 (Hawksworth 4,000g) attached.
1135127
Swindon Works 12/03/1962 17/05/1962 67 days Heavy General Boiler number 7672 (Diagram HD)
Tender number 2624 (Collett 4,000g) attached.
1226505

Mentions ...
Report Date Title Report Source
31/03/1947 Swindon Works Locos. entering works during March included: 1701, 2401, 2474, 2534, 2612, 2702, 2787, 2843, 2908, 2924, 2938, 2981, 3018, 3024, 3029, 3447, 4000, 4075, 4098, 4318, 5001, 5014, 5057, 5065, 5066, 5077, 5093, 5348, 5367, 6320, 6340, 6394, 7316, L.M.S. 8454, W.D. 77288, 78671 and 79234. (Last of the present batch of W.D. 2-8-00 to undergo repair here). Further locos. to receive T.F. boilers are: 4634, 5423, 5750, 6414 and 7428. Works' pilots during March included: 200, 201, 242, 1731, 1795, 2733, 2773 and 3561. 5705 has appeared with the G.W.R. monogram painted on the pannier tanks. New engines reported are: 1027 WES, 1028 BRD, 9402/3 PDN. Straight-sided 4,000 gallon tenders: The design as modified to suit the 'Castles' differs from the original tenders built for the '1000' Class as follows: It is 6in. narrower across the sides to match the cab width of the engine, and the running-plate is lowered to the same height as that under the engine cab. (It may not be generally realised that the '1000' Class have wider cabs and slightly higher running-plates under the cabs than what has always been standard). The coal space between the tanks is narrower so as to maintain the width of tank unchanged, and the shovel hole is also narrower. There are one or two other very minor differences, but otherwise the two types are the same. It appears that while the modified design can be used with all engine classes for which 4,000 gallon tenders are authorised, the original type will be restricted to the '1000' Class. SLS/194705
30/09/1948 Swindon Works Locomotives entering Works during September included: Nos. 1000/25, 1430/40/61, 1957/91, 2144/81/88/94, 2224/46/71, 2827/38/42/72/77/82, 2948, 3617, 3861/64/66, 3904/55, 4000/37/44/58/88, 4128, 4280, 4407, 4509/32/37/40/50, 4639, 4704, 4804, 4973/75/78, 5011/57/71/79, 5153/56, 5207, 5369/75, 5510/54/74, 5718/33/61, 5903/34/51/62/69/84, 6005/06/12, 6133, 6337/40/75/93, 6406/30, 6801/47, 6905/16/52/70, 7004/05/17, 7306/09, 7402/22, 7800/18, 8722/37/39, 9612, 9730.
New work; September: Nos. 7435 (-), 7436 (OXF), 7437 (WOS), 7438 (DG) (completed 5/10); 4160 (-). 4161 (BRY), 4162 (-), 4163 (BRY) and 4164 (DYD), nearly completed. Works' pilots have been Nos. 212, 1713, 1900 an 2764.
Outside the Works and awaiting scrapping are the following:-Nos. 1730, 2643/80, 2734/46/51, 3002/06/27, 3165/84, 3440, 5127, 5343/49 an 9006. In addition, Nos. 2709, 2928, 3005 an 3395 came in for scrapping at the beginning of October. All locomotives receiving a general repair (except express passenger locomotives) are now coming out painted plain black with the exception of No. 5156, which was fully lined, but without 'British Railways' on the tank sides. The majority of locomotives are now receiving smokebox number-plates.
No. 7017 was ex. Works on 22/9 after light repairs and is now running without nameplates
SLS/194811
31/01/1949 Swindon Works New Work January: Nos. 6996 Blackwell Hall (RDG (4/1)), 6997 Bryn-Ivor Hall (17/1), 6998 Burton Agnes Hall (28/1); 6769 BRY (6/1). Locomotives entering Works 30/12/48 to 28/1/49: These included Nos. p24 (Petrol), 213/46 (Both acting as Works' pilots), 1007/08/19, 1369, 1426/29, 2016 (open cab), 2235/64/94, 2445, 2807/59, 2843, 2942/79/87, 3020/44, 3631/33, 3751, 3811/57 (damaged), 3818/28/55, 4017/41/46/53/59/74/78/79/86, 4122/37, 4225/82,, 4507/10/50/94, 4601, 4801 (Ex-Carriage Stock Shed-for conversion to coal-burning), 4912/15/21/35/58, 5014/27/29/49/57/61/92/93, 5108/34, 5225, 5307/33/48/58, 5502/05/12/31/53/72, 5909/49/61/97 , 6013/23/29, 6104/38/58/66, 6304/07/32/34/59/81, 6432, 6640, 6802/03/64/65/69, 6967, 7412, 7731/62/66/86/87, 7805, 8724/26, 9604/11/53, 9732/53/69, W.D. 77049 (badly damaged), 79279, 79309. Condemned: Nos. *1538, *1713, 2717 (all to Concentration Yard), 1889/97, 2767 (open cab), 2935, 3049, 3446/48, 4320. *After acting as Works' pilot.
Further locomotives painted black and fully lined, include Nos. 4900, 5997, 6930/39, while No. 2166 came out black and unlined-with the original boiler again. No. 3020 has had a heavy repair (with a change of boiler), fitted with a smokebox numberplate, but not re-painted
SLS/194903
31/03/1949 Swindon Works New Work March: Nos. *7901 Dodington Hall (23/3), *7902 Eaton Mascot Hall (31/3); 9675 MTHR 4/3), 9676 CYS (10/3), 9677 CED (17/3). *Not allocated. Locomotives entering Works 28/2/49 to 30/3/49: Nos. 1002/09, 1086 (re-numbered 1147), 1213 (re-numbered 9), 1415, 1758 SDN (condemned), 1894 NPT (condemned), 2011/12, 2226/40/92/99, 2724 CYS (condemned), 69, 2806/36/71/82/83, 2902/15/31/81/87, 3032/33/43, 3175, 3386, 3562 OXF (condemned), 3616/45/55/88, 3719/44/47, 3819/29, 3901/55 (both for re-conversion), 4000/03/07/13/49, 4213/37/60/70, 4527/35/38/58/65/69/98, 4624, 4703, 4806/51 (both for re-conversion), 4936/55, 5020/33/55/57/75/89/91/95, 5166, 5310/30/41/72/96, 5509/66, 5719/28/98, 5931/79/88, 6017/24/25/28, 6132/53, 6341/53, 6720/47, 6803/22/54, 6900/02/07/33/46/55/62/64, 7202/09, 7302, 7415, 7766/84, 8753, 9311, 9600, 9704/08 and Class '8' W.D. 77234 (re-numbered 90201). Further locomotives painted black and fully lined include:-Nos. 1002/28, 2947, 4990, 6917/24, while Nos. 4007/20 are painted green and also lined. Works' pilots recently have been:-Nos. *212/13/46 and **1900. *Condemned 7/48. **Condemned 4/48.
No. 3150 has been fitted with the curved front end frames and cylinders (outside steam pipes) of No. 3184 (condemned in 1948). The original frames of No. 3150 had a square front end and the cylinders had internal steam pipes. No. 2123 has been fitted with auto gear.
SLS/194905
31/07/1949 Swindon Works New Work July: Nos. 1501 (1/7), 1502 (27/7). Both are unlined black. Locomotives entering Works during July included: Nos. 1005/12/25, 1467/68, 2206, 2856/86, 2920, 3663, 3779, 3853, 4013/41/56/61, 4133, 4381, 4631, 4901/43, 5050/69, 5238, 5369, 5552/59, 5918, 6003, 6103/08/22, 6320 (for re-conversion), 6336/45/54, 6417, 6804/38, 6910, 7307, 7809, 7905, 8762. Condemned: 2708 an 9087. No. 3837 (ex 4854) has been re-converted to coal-burning. No. 6020 has been painted blue, while No. 4961 has been Painted black and fully lined. The first of the contractor built series of 94XX arrived on Works on 27/7 viz: Nos. 8400 an 8401; they have entered shops to have the A.T.C. gear fitted. Works' Nos. checked are: Bagnall 2910/11 of 1949.
Awaiting Works at the east end of the yard- were Nos. 1000, 2708, 2875, 3635, 4981, 5057, 5554/57, 6844; No. 2863 (ex 4805-oil-burning) was also in evidence. B shop contained Nos. 1363, 1467/68, 2206/11, 2572, 3663/77, 4631, 6408/09/17, 7735, 9638. New engines from Bagnall's were Nos. 8400/1 (makers Nos. 2910/1) and Swindon construction included Nos. 7026 (painted), 7027, 1504 (painted), 1505 and the frames of a diesel (Lot 363). Barry 0-6-2T's Nos. 212, 213 an 246 were acting as Works' shunters.
SLS/194909
31/08/1949 Swindon Works New Work August: Nos. 7025 Sudeley Castle PDN (2/8), 7026 Tenby Castle (15/8), 7027 Thornbury Castle LA (25/8); 1503 PDN (8/8), 1504 PDN (17/8), 1505 PDN (29/8). Nos. 7025-27 are painted dark green and lined, while Nos. 1503-05 are unlined black. Contractor built: Nos. 8400 TYS, 8401 CDF, 8402 (W.G.B. 2912/49) PILL (26/8), 8450 (Y.E. Co. 2443/49) NPT (17/8). Nos. 8400-02/50 are unlined black. Condemned: Nos. 289 (original T.V. R/T boiler and curved top tanks), 1884 (closed cab), 1930 (open cab), 2902, 3182 an 3419. No. 6320 has been re-converted to coal-burning. Locomotives entering Works during August included: Nos. 1000/04/25, 1427/37, 2117 (closed cab), 2211/12/14/21/67, 2462, 2815/52/75/87, 3016/20, 3174/86, 3635/77, 3715/99, 3805/14/43, 4013/15/33/47/80, 4107/48/49/55, 4269/78, 4502/10/59/65/82/92/95, 4637/50/79/97, 4906/51/81, 5001/18/30/42/57/76/80/94/99, 5206, 5344/45/80, 5501/05/22/37/54, 5749, 5804, 5904/12/21/27/44/45/47/66, 6000/04/19, 6105/07/43/61, 6338/77, 6408/31, 6741, 6808/19/28/29/44, 6905/65, 7219/36, 7310, 7414, 7718, 7815/16, 7904, 8789, 9638 an 90712. Further locomotives painted black and fully lined include Nos. 1005/12, 4901/23/50, 5912/18 an 6920. September: A batch of new Class '2' 2-6-2T's and Class '4' 2-6-0's is to be built here. They will be similar to existing L.M.S. designs, but will have modified G.W.R. boilers. The frames have already been cut for five of the 2-6-0's. SLS/194910
28/11/1959 Banbury MPD With the increased traffic occasioned by the transfer of Wolverhampton-Birmingham-London trains from the LMR, this shed has acquired three Castles viz. 4078, 5057 an 7011 i.e. including Banbury Castle. Crewe's last steam engine (92250) has been transferred away to Newport (86A) but additional 9Fs ex Swindon Works have been allocated viz. 92211/2/3. SLS/196001
15/02/1960 Banbury MPD In mid-February, one 'Castle' only was in service (4078) as 5057 was at Swindon and 7011 at Stafford Road Works; 'Halls' were deputising. In store are 2248(85B), 2858(86A) and 5375(84C)-wdn. 10/59. SLS/196003
26/04/1964 Swindon Works (Dump) Works Yard: D3508, D3811, 1024, 1447, 1666, 2818, 3721, 4652, 4923, 6106, 6147, 6871, 6915, 6952, 7812, 8102, 8732, 8738, 9425, 9431, 9484, 9486, 9743, 9752, 42961, 42978, 42983, 43001, 43115, 43132, 73003, 73021. A Shop: D812, D831, D846, D1004, D1005, D1013, D1027, D1035, D1041, D848, D1043, D1058, D1065, D1067, D3421, D3808, D3816, D3823, D3828, D3831, D7026, D7029, D7064, D7071, D7080, D9500, D9501, D9502, D9503, D9504, D9505, D9506, D9057 motors mounted, D9508, D9509, D9510, D9511 frames only, 4144, 7019, 7915, 8486, 42954, 42958, 43002, 43044, 43056, 43075, 43090, 43109, 73053, 73066, 76077, 76081, 92225. C Shop: 6025. Dump: 1650, 4706, 5057, 6010, 6603, 6680, 6824, 9420, 9603, 47623. SLS/196406

Summary
Date Event Details Source See Also
26/06/1936 To Service To service as Great Western Railway Number 5057, name: PENRICE CASTLE
Built at Swindon Works
Allocated to Newton Abbot (NA)
Tender fitted: Collett 4,000g
Diagram HB boiler fitted
   
14/01/1937 Works Visit Works Visit - Swindon Works (Running Repairs) - Arr: 14/01/1937.    
06/10/1937 Naming Renamed 'EARL WALDEGRAVE'    
03/1938 Allocation Reallocated to Exeter (EXE)    
04/1938 Allocation Reallocated to Newton Abbot (NA)    
10/05/1938 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 10/05/1938. Dep: 14/07/1938.
Work undertaken:
Tender number 2688 (Collett 4,000g) attached.
   
01/1939 Allocation Reallocated to Laira (LA)    
28/06/1939 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 28/06/1939. Dep: 23/07/1939.    
12/03/1940 Works Visit Works Visit - Swindon Works (General) - Arr: 12/03/1940. Dep: 11/05/1940.
Work undertaken:
Boiler number 6628 (Diagram HB)
Tender number 2565 (Collett 4,000g) attached.
   
07/02/1941 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 07/02/1941. Dep: 14/02/1941.
Work undertaken:
Tender number 2443 (Collett 4,000g) attached.
   
21/06/1941 Tender Tender fitted: Collett 4,000g number 2682    
06/10/1942 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 06/10/1942. Dep: 16/11/1942.
Work undertaken:
Tender number 2405 (Collett 4,000g) attached.
   
12/10/1944 Works Visit Works Visit - Swindon Works (General) - Arr: 12/10/1944. Dep: 30/11/1944.
Work undertaken:
Boiler number 6639 (Diagram HB)
Tender number 2551 (Collett 4,000g) attached.
   
18/12/1945 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 18/12/1945. Dep: 22/01/1946.
Work undertaken:
Tender number 2809 (Collett 4,000g) attached.
   
11/03/1947 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 11/03/1947. Dep: 23/04/1947.
Work undertaken:
Boiler number 4626 (Diagram HA)
Tender number 2533 (Collett 4,000g) attached.
   
15/06/1947 Allocation Allocation Snapshot - Laira (LA)    
10/09/1948 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 10/09/1948. Dep: 11/10/1948.    
21/01/1949 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 21/01/1949. Dep: 11/02/1949.    
29/03/1949 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 29/03/1949. Dep: 06/05/1949.
Work undertaken:
Boiler number 6652 (Diagram HB)
Tender number 2627 (Collett 4,000g) attached.
   
09/08/1949 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 09/08/1949. Dep: 19/08/1949.    
23/01/1950 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 23/01/1950. Dep: 17/02/1950.
Work undertaken:
Tender number 4031 (Hawksworth 4,000g) attached.
   
09/08/1950 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 09/08/1950. Dep: 31/08/1950.
Work undertaken:
Tender number 2409 (Collett 4,000g) attached.
   
19/01/1951 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 19/01/1951. Dep: 01/03/1951.
Work undertaken:
Boiler number 4611 (Diagram HA)
Tender number 2722 (Collett 4,000g) attached.
   
31/01/1951 Allocation Reallocated to Old Oak Common (81A)    
01/03/1951 Allocation Reallocated to Old Oak Common (81A)    
23/10/1951 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 23/10/1951. Dep: 22/11/1951.
Work undertaken:
Tender number 2389 (Collett 4,000g) attached.
   
26/01/1952 Allocation Reallocated to Laira (83D)    
02/1952 Allocation Reallocated to Newton Abbot (83A)    
25/03/1952 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 25/03/1952. Dep: 30/04/1952.
Work undertaken:
Tender number 4072 (Hawksworth 4,000g) attached.
   
30/04/1952 Allocation Reallocated to Laira (83D)    
25/07/1952 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 25/07/1952. Dep: 10/09/1952.
Work undertaken:
Tender number 2693 (Collett 4,000g) attached.
   
01/09/1953 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 01/09/1953. Dep: 08/10/1953.
Work undertaken:
Tender number 2904 (Collett 4,000g) attached.
   
03/04/1954 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 03/04/1954. Dep: 08/06/1954.
Work undertaken:
Boiler number 7651 (Diagram HD)
Tender number 4003 (Hawksworth 4,000g) attached.
   
08/06/1954 Allocation Reallocated to Bristol Bath Road (82A)    
09/10/1954 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 09/10/1954. Dep: 22/11/1954.
Work undertaken:
Tender number 4051 (Hawksworth 4,000g) attached.
   
23/03/1955 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 23/03/1955. Dep: 09/05/1955.
Work undertaken:
Tender number 2847 (Collett 4,000g) attached.
   
15/02/1956 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 15/02/1956. Dep: 05/04/1956.
Work undertaken:
Tender number 2773 (Collett 4,000g) attached.
   
09/05/1958 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 09/05/1958. Dep: 31/07/1958.
Work undertaken:
Boiler number 7675 (Diagram HD)
Tender number 2610 (Collett 4,000g) attached.
Double Chimney fitted
   
04/11/1959 Allocation Reallocated to Banbury (84C)    
04/01/1960 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 04/01/1960. Dep: 24/03/1960.
Work undertaken:
Boiler number 6645 (Diagram HB)
Tender number 4099 (Hawksworth 4,000g) attached.
   
24/03/1960 Allocation Reallocated to Old Oak Common (81A)    
12/03/1962 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 12/03/1962. Dep: 17/05/1962.
Work undertaken:
Boiler number 7672 (Diagram HD)
Tender number 2624 (Collett 4,000g) attached.
   
10/03/1964 Withdrawn Condemned as 5057 from Old Oak Common (81A)    
08/1964 Scrapped Broken up by Locomotive Works: Swindon    

prev prev