Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 2536 Today
» 4163 Yesterday
» 15942 Week
» 68958 Month
» 188485 Year
» 3215338 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2797 on 04/06/1930
London and North Eastern Railway (1946 1st) 569 on Not applied
London and North Eastern Railway (1946 2nd) 101   14/07/1946
British Railways 60101   20/08/1948

Names Carried
Date From Name
04/06/1930 CICERO

Liveries Carried
Colour Lining Date From
LNER Apple Green Black and White 04/06/1930
LNER Black Unlined 12/1941
LNER Apple Green Black and White 02/1947
BR Blue Black and White 07/1949
BR Green Orange and Black 07/1952

Locomotive Specifics
Designer N. Gresley
Class A3
Company History GNR/LNER
Wheels 4-6-2
Builder Doncaster Works
Order Number 317
Works Number 1742
Fittings (as built)
Engine Brakes Vacuum
To Service Thu 04/06/1930 to Haymarket (HAY)
Withdrawal Thu 11/04/1963 off St Margarets (64A)
Service Life 32 yrs, 10 mths , 7 dys

Disposal
Scrapping During 06/1964 at Arnott Young (Carmyle)

Tenders
Type Number From Company Water Coal
LNER Non-Corridor 5481 31/05/1930 LNER 5,000g 8t 0cwt
LNER Non-Corridor 5571 06/07/1937 LNER 5,000g 8t 0cwt

Notes
Notes Sold for scrap to Arnott Young, Carmyle 6/64

Allocations
Code Subsequent Codes Name From Date
HAY   Haymarket (New) on 04/06/1930
DEE   Dundee Tay Bridge on 15/02/1937
EFD   Eastfield on 20/11/1938
STM   St Margarets on 02/02/1940
HAY   Haymarket on 09/10/1940
64A   St Margarets on 06/01/1963
     Withdrawn on 11/04/1963

SLS Allocations*
Type Code Name From Date
ALLOC 64A St Margarets 2w/e 12/01/1963
WDN   on 11/04/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
04/06/1930 Diagram 94HP boiler fitted (number 8248)
22/03/1934 Diagram 94HP boiler fitted (number 8082)
25/05/1935 Diagram 94HP boiler fitted (number 8223)
27/01/1943 Diagram 94A boiler fitted (number 8776)
22/05/1947 Diagram 94HP boiler fitted (number 8248)
02/12/1949 Diagram 94HP boiler fitted (number 8080)
20/09/1951 Diagram 94A boiler fitted (number 27057)
16/11/1954 Diagram 107 boiler fitted (number 29281)
01/1957 To 75% Cut-off
29/08/1957 Diagram 94A boiler fitted (number 27029)
07/1958 Double Chimney fitted
20/02/1959 Diagram 94A boiler fitted (number 27083)
18/08/1960 Diagram 94A boiler fitted (number 27011)
07/1961 Trough deflectors fitted


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 16/09/1931 31/10/1931 46 days General    
Doncaster Works 22/11/1932 04/01/1933 44 days General    
Doncaster Works 24/01/1934 22/03/1934 58 days General Boiler number 8082 (Diagram 94HP)
 
Doncaster Works 18/04/1935 25/05/1935 38 days General Boiler number 8223 (Diagram 94HP)
 
Doncaster Works 29/04/1936 17/06/1936 50 days General    
Doncaster Works 24/05/1937 06/07/1937 44 days General Tender number 5571 (LNER Non-Corridor) attached.
 
Doncaster Works 10/10/1938 18/11/1938 40 days General    
Doncaster Works 11/05/1939 15/05/1939 5 days Light Repair Damaged
 
Doncaster Works 03/11/1939 16/12/1939 44 days General    
Doncaster Works 27/06/1941 08/08/1941 43 days General Hudd ATC fitted
 
Doncaster Works 21/08/1941 28/08/1941 8 days Light Repair    
Doncaster Works 02/09/1942 23/09/1942 22 days Light Repair    
Cowlairs Works 01/10/1942 03/10/1942 3 days Light Repair    
Doncaster Works 24/12/1942 27/01/1943 35 days General Boiler number 8776 (Diagram 94A)
 
Doncaster Works 24/05/1944 25/06/1944 33 days General    
Doncaster Works 06/09/1945 21/10/1945 46 days General    
Doncaster Works 06/03/1946 15/03/1946 10 days Light Repair    
Doncaster Works 18/09/1946 28/09/1946 11 days Light Repair    
Doncaster Works 16/04/1947 22/05/1947 37 days General Boiler number 8248 (Diagram 94HP)
 
Doncaster Works 09/07/1948 20/08/1948 43 days General Renumbered to BR 60101
 
Doncaster Works 31/10/1949 02/12/1949 33 days General Boiler number 8080 (Diagram 94HP)
 
Doncaster Works 13/08/1951 20/09/1951 39 days General Boiler number 27057 (Diagram 94A)
 
Doncaster Works 16/04/1953 21/05/1953 36 days General    
R & W Hawthorn 30/12/1953 22/01/1954 24 days Light Casual    
R & W Hawthorn 22/07/1954 11/08/1954 21 days Light Casual    
Doncaster Works 08/10/1954 16/11/1954 40 days General Boiler number 29281 (Diagram 107)
 
Doncaster Works 05/11/1955 06/01/1956 63 days Heavy Intermediate    
Doncaster Works 17/07/1957 29/08/1957 44 days General Boiler number 27029 (Diagram 94A)
 
Doncaster Works 05/01/1959 20/02/1959 47 days General Boiler number 27083 (Diagram 94A)
 
Doncaster Works 28/06/1960 18/08/1960 52 days General Boiler number 27011 (Diagram 94A)
 

Mentions ...
Report Date Title Report Source
10/05/1947 Doncaster Works Locos. ex Plant, end April-May were: Nos. 16, 41, 51, 63, 86, 90, 101, 102, 113, 521, 863, 878, 890, 942, 1808, 1832, 1919, 1961, 2169, 3031, 3505, 3950, 3986, 5021, 7391, 8786 and 9492. Further locos. ex Plant include Nos. 29 (4/6) and 1949, 8784, 9464 (5/6). SLS/194708
04/01/1959 Doncaster MPD (On shed, waiting Works) On shed, waiting Works-60101 (64B), 60506 (34E), 60118 (56C), 60078 (52A), 61159 (40B). Ex Wks.-60517 (52B), 60137 (52A), 61978 (34E), 70000 (30A), 61894 (40A), 61956 (40B), 60094 (64B), 61212 (36E). Stored-63939/41/2/3/54/6/7/63/4/7/9/77/81/3/4, 64876/981 all in open. Others-60031 (64B), D3646/7 (36C), 92035 (36C), D3621/2, D3481/2, 92172/3/95/2201, 69586 (34C), 48269 (2E), 62017/55/70 (31B), 43060 (40F). SLS/195902

Summary
Date Event Details Source See Also
31/05/1930 Tender Tender fitted: LNER Non-Corridor number 5481    
04/06/1930 To Service To service as London and North Eastern Railway Number 2797, name: CICERO
Built at Doncaster Works, Works Number 1742
Allocated to Haymarket (HAY)
Livery applied: Apple green with white lined black boiler bands, black frames and cylinders with red lining
Diagram 94HP boiler fitted
   
16/09/1931 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/09/1931. Dep: 31/10/1931.    
22/11/1932 Works Visit Works Visit - Doncaster Works (General) - Arr: 22/11/1932. Dep: 04/01/1933.    
24/01/1934 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/01/1934. Dep: 22/03/1934.
Work undertaken:
Boiler number 8082 (Diagram 94HP)
   
18/04/1935 Works Visit Works Visit - Doncaster Works (General) - Arr: 18/04/1935. Dep: 25/05/1935.
Work undertaken:
Boiler number 8223 (Diagram 94HP)
   
29/04/1936 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/04/1936. Dep: 17/06/1936.    
15/02/1937 Allocation Reallocated to Dundee Tay Bridge (DEE)    
24/05/1937 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/05/1937. Dep: 06/07/1937.
Work undertaken:
Tender number 5571 (LNER Non-Corridor) attached.
   
10/10/1938 Works Visit Works Visit - Doncaster Works (General) - Arr: 10/10/1938. Dep: 18/11/1938.    
20/11/1938 Allocation Reallocated to Eastfield (EFD)    
11/05/1939 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 11/05/1939. Dep: 15/05/1939.
Work undertaken:
Damaged
   
03/11/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/11/1939. Dep: 16/12/1939.    
02/02/1940 Allocation Reallocated to St Margarets (STM)    
09/10/1940 Allocation Reallocated to Haymarket (HAY)    
27/06/1941 Works Visit Works Visit - Doncaster Works (General) - Arr: 27/06/1941. Dep: 08/08/1941.
Work undertaken:
Hudd ATC fitted
   
21/08/1941 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 21/08/1941. Dep: 28/08/1941.    
02/09/1942 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 02/09/1942. Dep: 23/09/1942.    
01/10/1942 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 01/10/1942. Dep: 03/10/1942.    
24/12/1942 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/12/1942. Dep: 27/01/1943.
Work undertaken:
Boiler number 8776 (Diagram 94A)
   
24/05/1944 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/05/1944. Dep: 25/06/1944.    
06/09/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/09/1945. Dep: 21/10/1945.    
1946 Number Allocated Allocated number 569 but not taken up    
06/03/1946 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 06/03/1946. Dep: 15/03/1946.    
14/07/1946 Renumbered Renumbered to 101    
18/09/1946 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 18/09/1946. Dep: 28/09/1946.    
16/04/1947 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/04/1947. Dep: 22/05/1947.
Work undertaken:
Boiler number 8248 (Diagram 94HP)
   
09/07/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 09/07/1948. Dep: 20/08/1948.
Work undertaken:
Renumbered to BR 60101
   
31/10/1949 Works Visit Works Visit - Doncaster Works (General) - Arr: 31/10/1949. Dep: 02/12/1949.
Work undertaken:
Boiler number 8080 (Diagram 94HP)
   
13/08/1951 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/08/1951. Dep: 20/09/1951.
Work undertaken:
Boiler number 27057 (Diagram 94A)
   
07/1952 Livery Change of livery to Green with orange and black lining.    
16/04/1953 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/04/1953. Dep: 21/05/1953.    
30/12/1953 Works Visit Works Visit - R & W Hawthorn (Light Casual) - Arr: 30/12/1953. Dep: 22/01/1954.    
22/07/1954 Works Visit Works Visit - R & W Hawthorn (Light Casual) - Arr: 22/07/1954. Dep: 11/08/1954.    
08/10/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/10/1954. Dep: 16/11/1954.
Work undertaken:
Boiler number 29281 (Diagram 107)
   
05/11/1955 Works Visit Works Visit - Doncaster Works (Heavy Intermediate) - Arr: 05/11/1955. Dep: 06/01/1956.    
01/1957 Modification Modification: To 75% Cut-off    
17/07/1957 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/07/1957. Dep: 29/08/1957.
Work undertaken:
Boiler number 27029 (Diagram 94A)
   
07/1958 Modification Modification: Double Chimney fitted    
05/01/1959 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/01/1959. Dep: 20/02/1959.
Work undertaken:
Boiler number 27083 (Diagram 94A)
   
28/06/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/06/1960. Dep: 18/08/1960.
Work undertaken:
Boiler number 27011 (Diagram 94A)
   
07/1961 Modification Modification: Trough deflectors fitted    
06/01/1963 Allocation Reallocated to St Margarets (64A)    
11/04/1963 Withdrawn Condemned as 60101 from St Margarets (64A)    
06/1964 Scrapped Broken up by Arnott Young: Carmyle    

prev prev