Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 1828 Today
» 4720 Yesterday
» 25459 Week
» 90413 Month
» 293077 Year
» 3319930 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2544 on 26/07/1924
London and North Eastern Railway (1946 1st) 513 on Not applied
London and North Eastern Railway (1946 2nd) 45   03/11/1946
British Railways 60045   04/06/1948

Names Carried
Date From Name
26/07/1924 LEMBERG

Liveries Carried
Colour Lining Date From
LNER Apple Green Black and White 26/07/1924
LNER Black Unlined 20/05/1942
LNER Apple Green Black and White 18/06/1947
BR Purple Red and Cream 05/06/1948
BR Blue Black and White 08/11/1950
BR Green Orange and Black 18/04/1952

Locomotive Specifics
Designer N. Gresley
Class A3
Company History GNR/LNER
Rebuild History
ClassFrom
A126/07/1924
A3 (4-6-2)03/12/1927
Wheels 4-6-2
Builder Doncaster Works
Order Number 301
Works Number 1600
Fittings (as built)
Engine Brakes Vacuum
To Service Mon 26/07/1924 to Gorton (GOR)
Withdrawal Mon 23/11/1964 off Darlington (51A)
Service Life 40 yrs, 3 mths , 28 dys

Disposal
Scrapping During 01/1965

Tenders
Type Number From Company Water Coal
GNR 5,000g 5254 26/07/1924 GNR 5,000g 8t 0cwt
GNR 5,000g 5228 08/04/1929 GNR 5,000g 8t 0cwt

Notes
Notes Sold to A Draper, Hull for scrap 1/65

Allocations
Code Subsequent Codes Name From Date
GOR   Gorton (New) on 26/07/1924
DON   Doncaster on 27/08/1924
GHD   Gateshead on 06/01/1937
HTN   Heaton on 17/05/1938
GHD   Gateshead on 22/01/1940
51A   Darlington on 28/02/1954
52A   Gateshead on 07/03/1954
51A   Darlington on 21/03/1954
52A   Gateshead on 26/10/1954
51A   Darlington on 13/11/1955
52A   Gateshead on 27/05/1956
51A   Darlington on 04/05/1958
52A   Gateshead on 16/11/1958
52B   Heaton on 09/09/1962
51A   Darlington on 09/12/1962
52B   Heaton on 02/06/1963
52A   Gateshead on 16/06/1963
51A   Darlington on 15/12/1963
     Withdrawn on 23/11/1964

SLS Allocations*
Type Code Name From Date
ALLOC 51A Darlington 4w/e 27/03/1954
ALLOC 52A Gateshead 4w/e 06/11/1954
ALLOC 51A Darlington 4w/e 03/12/1955
ALLOC 52A Gateshead 4w/e 23/06/1956
ALLOC 51A Darlington 4w/e 17/05/1958
ALLOC 52A Gateshead 4w/e 29/11/1958
ALLOC 52B Heaton 4w/e 06/10/1962
ALLOC 51A Darlington 5w/e 12/01/1963
ALLOC 52B Heaton 4w/e 08/06/1963
ALLOC 52A Gateshead 4w/e 06/07/1963
ALLOC 51A Darlington 5w/e 11/01/1964
WDN   on 24/11/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
26/07/1924 Diagram 94 boiler fitted (number 7704)
03/12/1927 Long Travel Valves fitted
03/12/1927 Diagram 94HP boiler fitted (number 8028)
31/01/1931 Diagram 94HP boiler fitted (number 8027)
04/05/1933 Diagram 94HP boiler fitted (number 8224)
14/05/1936 Diagram 94HP boiler fitted (number 8029)
14/05/1937 Diagram 94HP boiler fitted (number 8226)
26/03/1938 Diagram 94HP boiler fitted (number 8248)
20/05/1942 Diagram 94HP boiler fitted (number 8031)
18/06/1947 Diagram 94HP boiler fitted (number 8250)
26/02/1949 Diagram 94A boiler fitted (number 9450)
08/11/1950 Diagram 94A boiler fitted (number 27007)
28/10/1953 Right Hand Drive to Left Hand Drive
28/10/1953 Diagram 94A boiler fitted (number 27063)
17/01/1958 To 75% Cut-off
17/01/1958 Diagram 94A boiler fitted (number 27028)
17/10/1959 Double Chimney fitted
03/06/1960 Diagram 94A boiler fitted (number 27024)
01/11/1962 Trough deflectors fitted
01/11/1962 Diagram 94A boiler fitted (number 27021)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 05/08/1925 15/08/1925 11 days Light Repair    
Doncaster Works 12/10/1925 31/12/1925 81 days General    
Doncaster Works 04/10/1926 09/10/1926 6 days Light Repair    
Doncaster Works 08/08/1927 17/08/1927 10 days Light Repair    
Doncaster Works 08/09/1927 03/12/1927 87 days Heavy Rebuilt to class A3
Boiler number 8028 (Diagram 94HP)
Long Travel Valves fitted
 
Doncaster Works 17/01/1928 19/01/1928 3 days Unclassified    
Doncaster Works 20/01/1928 24/01/1928 5 days Light Repair    
Doncaster Works 06/02/1928 09/02/1928 4 days Light Repair    
Doncaster Works 12/07/1928 16/08/1928 36 days Heavy    
Doncaster Works 21/12/1928 08/04/1929 109 days General Tender number 5228 (GNR 5,000g) attached.
 
Doncaster Works 03/09/1929 12/10/1929 40 days Heavy    
Doncaster Works 18/12/1930 31/01/1931 45 days General Boiler number 8027 (Diagram 94HP)
 
Doncaster Works 02/03/1931 05/03/1931 4 days Unclassified    
Doncaster Works 17/02/1932 16/04/1932 60 days General    
Doncaster Works 13/06/1932 17/06/1932 5 days Light Repair    
Doncaster Works 02/03/1933 04/05/1933 64 days Heavy Boiler number 8224 (Diagram 94HP)
 
Doncaster Works 05/12/1934 18/01/1935 45 days General    
Doncaster Works 08/08/1935 15/08/1935 8 days Light Repair    
Doncaster Works 13/11/1935 16/11/1935 4 days Light Repair    
Doncaster Works 28/03/1936 14/05/1936 48 days General Boiler number 8029 (Diagram 94HP)
 
Doncaster Works 08/04/1937 14/05/1937 37 days General Boiler number 8226 (Diagram 94HP)
 
Doncaster Works 22/02/1938 26/03/1938 33 days General Boiler number 8248 (Diagram 94HP)
 
Doncaster Works 10/05/1938 10/05/1938 1 day Light Repair    
Doncaster Works 01/05/1939 13/06/1939 44 days General    
Doncaster Works 20/03/1940 11/04/1940 23 days Light Repair    
Doncaster Works 16/09/1940 26/10/1940 41 days General    
Doncaster Works 23/06/1941 05/07/1941 13 days Light Repair    
Doncaster Works 08/04/1942 20/05/1942 43 days General Boiler number 8031 (Diagram 94HP)
Painted Wartime unlined black
 
Doncaster Works 26/05/1942 28/05/1942 3 days Unclassified    
Doncaster Works 30/07/1943 16/09/1943 49 days General    
Doncaster Works 14/02/1944 11/03/1944 27 days Light Repair    
Doncaster Works 21/08/1944 08/09/1944 19 days Light Repair    
Doncaster Works 16/10/1945 28/11/1945 44 days General    
Doncaster Works 31/08/1946 28/09/1946 29 days Light Repair    
Doncaster Works 16/05/1947 18/06/1947 34 days General Boiler number 8250 (Diagram 94HP)
Painted Apple green with white lined black boiler bands, black frames and cylinders with red lining
 
Doncaster Works 24/05/1948 05/06/1948 13 days Light Repair Painted Experimental Blue/Purple with Red and Cream lining
Renumbered to BR 60045
 
Doncaster Works 13/01/1949 26/02/1949 45 days General Boiler number 9450 (Diagram 94A)
 
Darlington Works 13/12/1949 19/01/1950 38 days Light Casual    
Doncaster Works 02/10/1950 08/11/1950 38 days General Boiler number 27007 (Diagram 94A)
Painted BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
 
Doncaster Works 17/03/1952 18/04/1952 33 days General Painted Green with orange and black lining.
 
Doncaster Works 09/10/1952 27/10/1952 19 days Light Repair    
Doncaster Works 22/09/1953 28/10/1953 37 days General Boiler number 10544 (Diagram 94A)
Right Hand Drive to Left Hand Drive
 
Doncaster Works 03/10/1955 03/11/1955 32 days General    
Doncaster Works 22/07/1957 02/08/1957 12 days Light Casual    
Doncaster Works 04/12/1957 17/01/1958 45 days General Boiler number 27028 (Diagram 94A)
To 75% Cut-off
 
Doncaster Works 14/04/1958 22/04/1958 9 days Unclassified    
Doncaster Works 28/09/1959 17/10/1959 20 days Light Casual Double Chimney fitted
 
Doncaster Works 04/12/1959 24/12/1959 21 days Light Casual    
Doncaster Works 13/02/1960 05/03/1960 22 days Light Casual    
Doncaster Works 02/04/1960 03/06/1960 63 days General Boiler number 27024 (Diagram 94A)
 
Doncaster Works 28/08/1962 01/11/1962 66 days General Boiler number 27021 (Diagram 94A)
Trough deflectors fitted
 

Mentions ...
Report Date Title Report Source
31/01/1949 Doncaster Works Locomotives in Works at the end of January, included Nos. 53, 88, 90, 95, 110, 800/59/84/93, 922/30/44/67, 3491, 3959/75/85, 4200/68, 5005/08/14 an 60045. 884, 930 and 3959 were in for light repairs. The following are ex Works painted green:-Nos. 60514 an 60524, while those painted black and fully lined are: Nos. 1904/14, 61139/44/93, 61805 an 61883. New 'A.1' No. 60123 was ready for trial, but the next batch of six were held up awaiting materials. SLS/194903
19/09/1964 Darlington MPD (Shed) On shed-diesel bays: D5170/2, dead line: 69020, 90444/9; Roundhouse: D3228, D2706/31/2, D2318/36/40, D3229, DEPT87, 68011/37/43/7/50/3/60. Shed: 60024 ex works, 60036/45/808/84/5, 62001, 62002 ex works, 62003/43/4/8/64; 61030, 62368, 68010/4/46,151/4, 90011/4/98, 90361/556 ex works, 90688, 42405/77, 43050/6/7, 43102/29/40 and 63460 awaiting move to Stratford. SLS/196410

Summary
Date Event Details Source See Also
26/07/1924 To Service To service as London and North Eastern Railway Number 2544, name: LEMBERG
Built at Doncaster Works, Works Number 1600
Allocated to Gorton (GOR)
Livery applied: Apple green with white lined black boiler bands, black frames and cylinders with red lining
Tender fitted: GNR 5,000g
Diagram 94 boiler fitted
   
27/08/1924 Allocation Reallocated to Doncaster (DON)    
05/08/1925 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 05/08/1925. Dep: 15/08/1925.    
12/10/1925 Works Visit Works Visit - Doncaster Works (General) - Arr: 12/10/1925. Dep: 31/12/1925.    
04/10/1926 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 04/10/1926. Dep: 09/10/1926.    
08/08/1927 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 08/08/1927. Dep: 17/08/1927.    
08/09/1927 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 08/09/1927. Dep: 03/12/1927.
Work undertaken:
Rebuilt to class A3
Boiler number 8028 (Diagram 94HP)
Long Travel Valves fitted
   
17/01/1928 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 17/01/1928. Dep: 19/01/1928.    
20/01/1928 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 20/01/1928. Dep: 24/01/1928.    
06/02/1928 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 06/02/1928. Dep: 09/02/1928.    
12/07/1928 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 12/07/1928. Dep: 16/08/1928.    
21/12/1928 Works Visit Works Visit - Doncaster Works (General) - Arr: 21/12/1928. Dep: 08/04/1929.
Work undertaken:
Tender number 5228 (GNR 5,000g) attached.
   
03/09/1929 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 03/09/1929. Dep: 12/10/1929.    
18/12/1930 Works Visit Works Visit - Doncaster Works (General) - Arr: 18/12/1930. Dep: 31/01/1931.
Work undertaken:
Boiler number 8027 (Diagram 94HP)
   
02/03/1931 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 02/03/1931. Dep: 05/03/1931.    
17/02/1932 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/02/1932. Dep: 16/04/1932.    
13/06/1932 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 13/06/1932. Dep: 17/06/1932.    
02/03/1933 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 02/03/1933. Dep: 04/05/1933.
Work undertaken:
Boiler number 8224 (Diagram 94HP)
   
05/12/1934 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/12/1934. Dep: 18/01/1935.    
08/08/1935 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 08/08/1935. Dep: 15/08/1935.    
13/11/1935 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 13/11/1935. Dep: 16/11/1935.    
28/03/1936 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/03/1936. Dep: 14/05/1936.
Work undertaken:
Boiler number 8029 (Diagram 94HP)
   
06/01/1937 Allocation Reallocated to Gateshead (GHD)    
08/04/1937 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/04/1937. Dep: 14/05/1937.
Work undertaken:
Boiler number 8226 (Diagram 94HP)
   
22/02/1938 Works Visit Works Visit - Doncaster Works (General) - Arr: 22/02/1938. Dep: 26/03/1938.
Work undertaken:
Boiler number 8248 (Diagram 94HP)
   
10/05/1938 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 10/05/1938. Dep: 10/05/1938.    
17/05/1938 Allocation Reallocated to Heaton (HTN)    
01/05/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 01/05/1939. Dep: 13/06/1939.    
22/01/1940 Allocation Reallocated to Gateshead (GHD)    
20/03/1940 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 20/03/1940. Dep: 11/04/1940.    
16/09/1940 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/09/1940. Dep: 26/10/1940.    
23/06/1941 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 23/06/1941. Dep: 05/07/1941.    
08/04/1942 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/04/1942. Dep: 20/05/1942.
Work undertaken:
Boiler number 8031 (Diagram 94HP)
Painted Wartime unlined black
   
20/05/1942 Livery Change of livery to Wartime unlined black    
26/05/1942 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 26/05/1942. Dep: 28/05/1942.    
30/07/1943 Works Visit Works Visit - Doncaster Works (General) - Arr: 30/07/1943. Dep: 16/09/1943.    
14/02/1944 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 14/02/1944. Dep: 11/03/1944.    
21/08/1944 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 21/08/1944. Dep: 08/09/1944.    
16/10/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/10/1945. Dep: 28/11/1945.    
1946 Number Allocated Allocated number 513 but not taken up    
31/08/1946 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 31/08/1946. Dep: 28/09/1946.    
03/11/1946 Renumbered Renumbered to 45    
16/05/1947 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/05/1947. Dep: 18/06/1947.
Work undertaken:
Boiler number 8250 (Diagram 94HP)
Painted Apple green with white lined black boiler bands, black frames and cylinders with red lining
   
24/05/1948 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 24/05/1948. Dep: 05/06/1948.
Work undertaken:
Painted Experimental Blue/Purple with Red and Cream lining
Renumbered to BR 60045
   
13/01/1949 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/01/1949. Dep: 26/02/1949.
Work undertaken:
Boiler number 9450 (Diagram 94A)
   
13/12/1949 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 13/12/1949. Dep: 19/01/1950.    
02/10/1950 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/10/1950. Dep: 08/11/1950.
Work undertaken:
Boiler number 27007 (Diagram 94A)
Painted BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
   
08/11/1950 Livery Change of livery to BR Blue for steam locomotives, with broad black, inlaid with thin white lining.    
17/03/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/03/1952. Dep: 18/04/1952.
Work undertaken:
Painted Green with orange and black lining.
   
09/10/1952 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 09/10/1952. Dep: 27/10/1952.    
22/09/1953 Works Visit Works Visit - Doncaster Works (General) - Arr: 22/09/1953. Dep: 28/10/1953.
Work undertaken:
Boiler number 10544 (Diagram 94A)
Right Hand Drive to Left Hand Drive
   
28/02/1954 Allocation Reallocated to Darlington (51A)    
07/03/1954 Allocation Reallocated to Gateshead (52A)    
21/03/1954 Allocation Reallocated to Darlington (51A)    
26/10/1954 Allocation Reallocated to Gateshead (52A)    
03/10/1955 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/10/1955. Dep: 03/11/1955.    
13/11/1955 Allocation Reallocated to Darlington (51A)    
27/05/1956 Allocation Reallocated to Gateshead (52A)    
22/07/1957 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 22/07/1957. Dep: 02/08/1957.    
04/12/1957 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/12/1957. Dep: 17/01/1958.
Work undertaken:
Boiler number 27028 (Diagram 94A)
To 75% Cut-off
   
14/04/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 14/04/1958. Dep: 22/04/1958.    
04/05/1958 Allocation Reallocated to Darlington (51A)    
16/11/1958 Allocation Reallocated to Gateshead (52A)    
28/09/1959 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 28/09/1959. Dep: 17/10/1959.
Work undertaken:
Double Chimney fitted
   
04/12/1959 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 04/12/1959. Dep: 24/12/1959.    
13/02/1960 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 13/02/1960. Dep: 05/03/1960.    
02/04/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/04/1960. Dep: 03/06/1960.
Work undertaken:
Boiler number 27024 (Diagram 94A)
   
28/08/1962 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/08/1962. Dep: 01/11/1962.
Work undertaken:
Boiler number 27021 (Diagram 94A)
Trough deflectors fitted
   
09/09/1962 Allocation Reallocated to Heaton (52B)    
09/12/1962 Allocation Reallocated to Darlington (51A)    
02/06/1963 Allocation Reallocated to Heaton (52B)    
16/06/1963 Allocation Reallocated to Gateshead (52A)    
15/12/1963 Allocation Reallocated to Darlington (51A)    
23/11/1964 Withdrawn Condemned as 60045 from Darlington (51A)    
01/1965 Scrapped Scrapped    

prev prev