Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 31 Online
» 4133 Today
» 4868 Yesterday
» 23044 Week
» 87998 Month
» 290662 Year
» 3317515 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2560 on 17/04/1925
London and North Eastern Railway (1946 1st) 529 on Not applied
London and North Eastern Railway (1946 2nd) 61   18/11/1946
British Railways 60061   20/11/1948

Names Carried
Date From Name
17/04/1925 PRETTY POLLY

Liveries Carried
Colour Lining Date From
LNER Apple Green Black and White 17/04/1925
LNER Black Unlined 23/08/1942
LNER Apple Green Black and White 27/04/1947
BR Blue Black and White 02/11/1950
BR Green Orange and Black 26/08/1952

Locomotive Specifics
Designer N. Gresley
Class A3
Company History GNR/LNER
Rebuild History
ClassFrom
A117/04/1925
A3 (4-6-2)06/05/1944
Wheels 4-6-2
Builder Doncaster Works
Order Number 302
Works Number 1616
Fittings (as built)
Engine Brakes Vacuum
To Service Sun 17/04/1925 to Gorton (GOR)
Withdrawal Sun 08/09/1963 off Grantham (34F)
Service Life 38 yrs, 4 mths , 22 dys

Disposal
Scrapping Mon 16/09/1963

Tenders
Type Number From Company Water Coal
GNR 5,000g 5270 28/03/1925 GNR 5,000g 8t 0cwt
GNR 5,000g 5258 30/09/1931 GNR 5,000g 8t 0cwt
GNR 5,000g 5229 27/03/1932 GNR 5,000g 8t 0cwt
GNR 5,000g 5211 03/07/1937 GNR 5,000g 8t 0cwt
GNR 5,000g 5290 25/06/1938 GNR 5,000g 8t 0cwt

Notes
Notes Into Doncaster Works for cutting up 16/9/63

Allocations
Code Subsequent Codes Name From Date
GOR   Gorton (New) on 17/04/1925
KX   Kings Cross on 23/05/1925
GRA   Grantham on 25/11/1928
NWE   New England on 10/10/1942
LEI   Leicester (G.C.) on 06/02/1949
36A   Doncaster on 04/06/1950
37B   Copley Hill (Leeds) on 26/11/1950
34A   Kings Cross on 18/02/1951
34E   Neasden on 15/07/1951
35B   Grantham on 22/02/1953
34A   Kings Cross on 29/08/1954
35B   Grantham on 17/10/1954
36A   Doncaster on 08/02/1959
34A   Kings Cross on 05/04/1959
34E   New England on 13/09/1959
34A   Kings Cross on 08/11/1959
34F   Grantham on 16/06/1963
     Withdrawn on 08/09/1963

SLS Allocations*
Type Code Name From Date
ALLOC LEI Leicester (G.C.) w/e 12/02/1949
ALLOC 36A Doncaster m/e 30/06/1950
ALLOC 37B Copley Hill (Leeds) m/e 30/11/1950
ALLOC 34A Kings Cross w/e 18/02/1951
ALLOC 34E Neasden 3w/e 28/07/1951
ALLOC 35B Grantham 4w/e 21/03/1953
ALLOC 34A Kings Cross 4w/e 11/09/1954
ALLOC 35B Grantham 4w/e 06/11/1954
ALLOC 36A Doncaster 4w/e 21/02/1959
ALLOC 34A Kings Cross 4w/e 18/04/1959
ALLOC 34E New England 4w/e 03/10/1959
ALLOC 34A Kings Cross 4w/e 28/11/1959
ALLOC 34F Grantham 4w/e 29/06/1963
WDN   6w/e 05/10/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
17/04/1925 Diagram 94 boiler fitted (number 7778)
25/01/1930 Long Travel Valves fitted
29/01/1931 Diagram 94 boiler fitted (number 7879)
11/12/1931 Diagram 94 boiler fitted (number 7771)
10/10/1934 Diagram 94 boiler fitted (number 7764)
25/06/1938 Diagram 94 boiler fitted (number 7783)
06/05/1944 Diagram 94A boiler fitted (number 8781)
27/04/1947 To 75% Cut-off
20/11/1948 Diagram 94A boiler fitted (number 8779)
02/11/1950 Diagram 94HP boiler fitted (number 27008)
26/08/1952 Right Hand Drive to Left Hand Drive
26/08/1952 Diagram 94A boiler fitted (number 27024)
26/03/1954 Diagram 94A boiler fitted (number 27005)
01/03/1957 Diagram 94A boiler fitted (number 27015)
21/12/1957 Diagram 94A boiler fitted (number 27074)
23/10/1958 Double Chimney fitted
23/10/1958 Diagram 94A boiler fitted (number 27033)
24/03/1960 Diagram 94A boiler fitted (number 27012)
03/02/1962 Trough deflectors fitted
03/02/1962 Diagram 94A boiler fitted (number 27026)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 24/07/1925 01/08/1925 9 days Light Repair    
Doncaster Works 15/03/1927 27/05/1927 74 days General    
Doncaster Works 24/09/1928 05/12/1928 73 days General    
Doncaster Works 06/12/1929 25/01/1930 51 days General Long Travel Valves fitted
 
Doncaster Works 25/11/1930 29/01/1931 66 days General Boiler number 7879 (Diagram 94)
 
Doncaster Works 27/10/1931 11/12/1931 46 days General Boiler number 7771 (Diagram 94)
 
Doncaster Works 24/11/1932 21/01/1933 59 days General    
Doncaster Works 27/11/1933 25/01/1934 60 days General    
Doncaster Works 31/10/1934 06/11/1934 7 days Light Repair    
Doncaster Works 25/01/1935 31/01/1935 7 days Light Repair    
Doncaster Works 18/09/1935 07/11/1935 51 days General    
Doncaster Works 03/12/1935 10/12/1935 8 days Unclassified    
Doncaster Works 24/06/1936 01/08/1936 39 days General    
Doncaster Works 28/05/1937 03/07/1937 37 days General Tender number 5211 (GNR 5,000g) attached.
 
Doncaster Works 21/05/1938 25/06/1938 36 days General Boiler number 7783 (Diagram 94)
Tender number 5290 (GNR 5,000g) attached.
 
Doncaster Works 02/06/1939 15/07/1939 44 days General    
Doncaster Works 09/12/1939 20/12/1939 12 days Light Repair    
Doncaster Works 20/03/1940 13/04/1940 25 days Light Repair    
Doncaster Works 23/11/1940 28/12/1940 36 days General    
Doncaster Works 15/07/1942 23/08/1942 40 days General Painted Wartime unlined black
 
Doncaster Works 24/07/1943 19/08/1943 27 days Light Repair    
Doncaster Works 27/03/1944 06/05/1944 41 days Heavy Rebuilt to class A3
Boiler number 8781 (Diagram 94A)
 
Doncaster Works 01/07/1945 03/08/1945 34 days General    
Doncaster Works 15/10/1945 27/10/1945 13 days Light Repair    
Doncaster Works 10/12/1945 22/12/1945 13 days Light Repair    
Doncaster Works 29/12/1945 30/12/1945 2 days Unclassified    
Doncaster Works 17/03/1946 23/03/1946 7 days Light Repair    
Doncaster Works 17/03/1947 27/04/1947 42 days General To 75% Cut-off
Painted Apple green with white lined black boiler bands, black frames and cylinders with red lining
 
Doncaster Works 11/10/1948 20/11/1948 41 days General Boiler number 8779 (Diagram 94A)
Renumbered to BR 60061
 
Doncaster Works 25/09/1950 02/11/1950 39 days General Boiler number 27008 (Diagram 94HP)
Painted BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
 
Doncaster Works 20/07/1952 26/08/1952 38 days General Boiler number 27024 (Diagram 94A)
Right Hand Drive to Left Hand Drive
Painted Green with orange and black lining.
 
Doncaster Works 22/01/1953 30/01/1953 9 days Unclassified    
Doncaster Works 23/02/1954 26/03/1954 32 days General Boiler number 27005 (Diagram 94A)
 
Doncaster Works 09/01/1955 14/01/1955 6 days Unclassified    
Doncaster Works 22/05/1955 29/07/1955 69 days General    
Doncaster Works 03/08/1955 11/08/1955 9 days Unclassified    
Doncaster Works 07/01/1957 01/03/1957 54 days General Boiler number 27015 (Diagram 94A)
 
Doncaster Works 04/03/1957 09/03/1957 6 days Unclassified    
Doncaster Works 02/12/1957 21/12/1957 20 days Heavy Casual Boiler number 27074 (Diagram 94A)
 
Doncaster Works 02/09/1958 23/10/1958 52 days General Boiler number 27033 (Diagram 94A)
Double Chimney fitted
 
Doncaster Works 31/12/1958 03/01/1959 4 days Unclassified    
Doncaster Works 23/10/1959 07/11/1959 16 days Light Casual    
Doncaster Works 07/01/1960 23/01/1960 17 days Light Casual    
Doncaster Works 12/02/1960 24/03/1960 42 days General Boiler number 27012 (Diagram 94A)
 
Doncaster Works 24/08/1960 27/09/1960 35 days Light Casual    
Doncaster Works 03/01/1962 03/02/1962 32 days General Boiler number 27026 (Diagram 94A)
Trough deflectors fitted
 
Doncaster Works 07/05/1962 19/05/1962 13 days Light Casual    
Doncaster Works 17/09/1962 17/10/1962 31 days Light Casual    

Mentions ...
Report Date Title Report Source
13/01/1962 Doncaster Works (Erecting Shop) New Erecting Shop: D3453, E3088-94. Outside Erecting Shop: 60817, 61375, 61861/99, 63858, 68900, 70003/7. Erecting Shop: D2406, D3289, 13336, D3487, D5522/47/95, D5822. D8021, 08213, D9012, 12133, 43032, 60025/47/61/87, 60134, 60854, 61051, 61223/52, 61374, 62013, 63924/38, 70006, 76046. Stripping Road-dept. 10/1: 60938, 62034, 63571. Outside Crimpsal: D3482. 70018. Crimpsal: 60014/43/63/83/97. Outside Weighshop: 60138/57. Paint Shop: D374 (BE 3120 VF D670 of 1961), D5369 (BRCW DEL 212 of 1961), D5644, D5828 (Brush 364 of 1961), D5830 (Brush 366 of 1961), E3086/7, 60027/84 an 60125. SLS/196202
28/01/1962 Doncaster Works (Erecting Shop) New Erecting Shop: D5643, D8213, E3072-6. Stripping Road: D4055/63, 60129, 60853, 61285, 61315, 63630, 73036. Crimpsall: 60119, 63962. Outside Crimpsall: 60870, 60938, 61168, 62021/34. Scrap Road: 68900 intact, 61862, 61908 being cut up. Erecting Shop: D3482, D5525/95, D5642/57, 12126/33, 13288, 60043/61/78/83/97, 60107, 60817, 61252, 61374/5, 61899, 63571, 70003/7, 76021. Erecting Shop Yard: 60062, 60112. Boiler Park: 60014/47. Weigh House: D5547. Outside Weigh House: D3289, 61223, 63924, 68928, 70006. Paint Shop: D3336, D3487, D5371/2, D5822, E3070/1, 60087, 76046. Paint Shop Yard: Nil. Works Shunters: DEPT. 10/1. SLS/196203

Summary
Date Event Details Source See Also
28/03/1925 Tender Tender fitted: GNR 5,000g number 5270    
17/04/1925 To Service To service as London and North Eastern Railway Number 2560, name: PRETTY POLLY
Built at Doncaster Works, Works Number 1616
Allocated to Gorton (GOR)
Livery applied: Apple green with white lined black boiler bands, black frames and cylinders with red lining
Diagram 94 boiler fitted
   
23/05/1925 Allocation Reallocated to Kings Cross (KX)    
24/07/1925 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 24/07/1925. Dep: 01/08/1925.    
15/03/1927 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/03/1927. Dep: 27/05/1927.    
24/09/1928 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/09/1928. Dep: 05/12/1928.    
25/11/1928 Allocation Reallocated to Grantham (GRA)    
06/12/1929 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/12/1929. Dep: 25/01/1930.
Work undertaken:
Long Travel Valves fitted
   
25/11/1930 Works Visit Works Visit - Doncaster Works (General) - Arr: 25/11/1930. Dep: 29/01/1931.
Work undertaken:
Boiler number 7879 (Diagram 94)
   
30/09/1931 Tender Tender fitted: GNR 5,000g number 5258    
27/10/1931 Works Visit Works Visit - Doncaster Works (General) - Arr: 27/10/1931. Dep: 11/12/1931.
Work undertaken:
Boiler number 7771 (Diagram 94)
   
27/03/1932 Tender Tender fitted: GNR 5,000g number 5229    
24/11/1932 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/11/1932. Dep: 21/01/1933.    
27/11/1933 Works Visit Works Visit - Doncaster Works (General) - Arr: 27/11/1933. Dep: 25/01/1934.    
10/10/1934 Modification Diagram 94 number 7764 boiler fitted    
31/10/1934 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 31/10/1934. Dep: 06/11/1934.    
25/01/1935 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 25/01/1935. Dep: 31/01/1935.    
18/09/1935 Works Visit Works Visit - Doncaster Works (General) - Arr: 18/09/1935. Dep: 07/11/1935.    
03/12/1935 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 03/12/1935. Dep: 10/12/1935.    
24/06/1936 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/06/1936. Dep: 01/08/1936.    
28/05/1937 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/05/1937. Dep: 03/07/1937.
Work undertaken:
Tender number 5211 (GNR 5,000g) attached.
   
21/05/1938 Works Visit Works Visit - Doncaster Works (General) - Arr: 21/05/1938. Dep: 25/06/1938.
Work undertaken:
Boiler number 7783 (Diagram 94)
Tender number 5290 (GNR 5,000g) attached.
   
02/06/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/06/1939. Dep: 15/07/1939.    
09/12/1939 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 09/12/1939. Dep: 20/12/1939.    
20/03/1940 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 20/03/1940. Dep: 13/04/1940.    
23/11/1940 Works Visit Works Visit - Doncaster Works (General) - Arr: 23/11/1940. Dep: 28/12/1940.    
15/07/1942 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/07/1942. Dep: 23/08/1942.
Work undertaken:
Painted Wartime unlined black
   
23/08/1942 Livery Change of livery to Wartime unlined black    
10/10/1942 Allocation Reallocated to New England (NWE)    
24/07/1943 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 24/07/1943. Dep: 19/08/1943.    
27/03/1944 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 27/03/1944. Dep: 06/05/1944.
Work undertaken:
Rebuilt to class A3
Boiler number 8781 (Diagram 94A)
   
01/07/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 01/07/1945. Dep: 03/08/1945.    
15/10/1945 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 15/10/1945. Dep: 27/10/1945.    
10/12/1945 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 10/12/1945. Dep: 22/12/1945.    
29/12/1945 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 29/12/1945. Dep: 30/12/1945.    
1946 Number Allocated Allocated number 529 but not taken up    
17/03/1946 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 17/03/1946. Dep: 23/03/1946.    
18/11/1946 Renumbered Renumbered to 61    
17/03/1947 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/03/1947. Dep: 27/04/1947.
Work undertaken:
To 75% Cut-off
Painted Apple green with white lined black boiler bands, black frames and cylinders with red lining
   
27/04/1947 Livery Change of livery to Apple green with white lined black boiler bands, black frames and cylinders with red lining    
11/10/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/10/1948. Dep: 20/11/1948.
Work undertaken:
Boiler number 8779 (Diagram 94A)
Renumbered to BR 60061
   
06/02/1949 Allocation Reallocated to Leicester (G.C.) (LEI)    
04/06/1950 Allocation Reallocated to Doncaster (36A)    
25/09/1950 Works Visit Works Visit - Doncaster Works (General) - Arr: 25/09/1950. Dep: 02/11/1950.
Work undertaken:
Boiler number 27008 (Diagram 94HP)
Painted BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
   
26/11/1950 Allocation Reallocated to Copley Hill (Leeds) (37B)    
18/02/1951 Allocation Reallocated to Kings Cross (34A)    
15/07/1951 Allocation Reallocated to Neasden (34E)    
20/07/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/07/1952. Dep: 26/08/1952.
Work undertaken:
Boiler number 27024 (Diagram 94A)
Right Hand Drive to Left Hand Drive
Painted Green with orange and black lining.
   
26/08/1952 Livery Change of livery to Green with orange and black lining.    
22/01/1953 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 22/01/1953. Dep: 30/01/1953.    
22/02/1953 Allocation Reallocated to Grantham (35B)    
23/02/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 23/02/1954. Dep: 26/03/1954.
Work undertaken:
Boiler number 27005 (Diagram 94A)
   
29/08/1954 Allocation Reallocated to Kings Cross (34A)    
17/10/1954 Allocation Reallocated to Grantham (35B)    
09/01/1955 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 09/01/1955. Dep: 14/01/1955.    
22/05/1955 Works Visit Works Visit - Doncaster Works (General) - Arr: 22/05/1955. Dep: 29/07/1955.    
03/08/1955 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 03/08/1955. Dep: 11/08/1955.    
07/01/1957 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/01/1957. Dep: 01/03/1957.
Work undertaken:
Boiler number 27015 (Diagram 94A)
   
04/03/1957 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 04/03/1957. Dep: 09/03/1957.    
02/12/1957 Works Visit Works Visit - Doncaster Works (Heavy Casual) - Arr: 02/12/1957. Dep: 21/12/1957.
Work undertaken:
Boiler number 27074 (Diagram 94A)
   
02/09/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/09/1958. Dep: 23/10/1958.
Work undertaken:
Boiler number 27033 (Diagram 94A)
Double Chimney fitted
   
31/12/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 31/12/1958. Dep: 03/01/1959.    
08/02/1959 Allocation Reallocated to Doncaster (36A)    
05/04/1959 Allocation Reallocated to Kings Cross (34A)    
13/09/1959 Allocation Reallocated to New England (34E)    
23/10/1959 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 23/10/1959. Dep: 07/11/1959.    
08/11/1959 Allocation Reallocated to Kings Cross (34A)    
07/01/1960 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 07/01/1960. Dep: 23/01/1960.    
12/02/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 12/02/1960. Dep: 24/03/1960.
Work undertaken:
Boiler number 27012 (Diagram 94A)
   
24/08/1960 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 24/08/1960. Dep: 27/09/1960.    
03/01/1962 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/01/1962. Dep: 03/02/1962.
Work undertaken:
Boiler number 27026 (Diagram 94A)
Trough deflectors fitted
   
07/05/1962 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 07/05/1962. Dep: 19/05/1962.    
17/09/1962 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 17/09/1962. Dep: 17/10/1962.    
16/06/1963 Allocation Reallocated to Grantham (34F)    
08/09/1963 Withdrawn Condemned as 60061 from Grantham (34F)    

prev prev