Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 34 Online
» 4270 Today
» 4689 Yesterday
» 19882 Week
» 118527 Month
» 321191 Year
» 3348044 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2582 on 06/12/1924
London and North Eastern Railway (1946 1st) 551 on Not applied
London and North Eastern Railway (1946 2nd) 83   20/10/1946
British Railways 60083   27/05/1949

Names Carried
Date From Name
19/11/1925 SIR HUGO

Liveries Carried
Colour Lining Date From
LNER Apple Green Black and White 06/12/1924
LNER Black Unlined 17/12/1941
LNER Apple Green Black and White 17/08/1946
BR Blue Black and White 28/05/1949
BR Green Orange and Black 02/09/1952

Locomotive Specifics
Designer N. Gresley
Class A3
Company History GNR/LNER
Rebuild History
ClassFrom
A106/12/1924
A3 (4-6-2)17/12/1941
Wheels 4-6-2
Builder North British Locomotive Company, Glasgow
Order Number L787
Works Number 23120
Fittings (as built)
Engine Brakes Vacuum and Westinghouse Brake
To Service Mon 06/12/1924 to Heaton (HTN)
Withdrawal Mon 18/05/1964 off Gateshead (52A)
Service Life 39 yrs, 5 mths , 12 dys

Disposal
Scrapping During 08/1964

Tenders
Type Number From Company Water Coal
GNR 5,000g 5292 06/12/1924 GNR 5,000g 8t 0cwt
GNR 5,000g 5282 09/12/1936 GNR 5,000g 8t 0cwt

Notes
Notes Sold for scrap to Hughes Bolckow, North Blyth 8/64

Allocations
Code Subsequent Codes Name From Date
HTN   Heaton (New) on 06/12/1924
GHD   Gateshead on 17/06/1940
HTN   Heaton on 26/10/1940
52A   Gateshead on 16/06/1963
     Withdrawn on 18/05/1964

SLS Allocations*
Type Code Name From Date
ALLOC 52A Gateshead 4w/e 06/07/1963
WDN   on 18/05/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/12/1924 Diagram 94 boiler fitted (number 7804)
20/06/1928 Diagram 94 boiler fitted (number 7799)
19/02/1930 Long Travel Valves fitted
19/02/1930 Diagram 94 boiler fitted (number 7803)
17/07/1931 Diagram 94 boiler fitted (number 7696)
03/06/1933 Westinghouse Pump removed
04/12/1935 Diagram 94 boiler fitted (number 7704)
17/12/1941 Diagram 94HP boiler fitted (number 8027)
17/08/1946 Diagram 94A boiler fitted (number 9513)
15/03/1951 Diagram 94A boiler fitted (number 27034)
02/09/1952 Right Hand Drive to Left Hand Drive
12/03/1954 Diagram 94A boiler fitted (number 27016)
08/07/1955 Diagram 94A boiler fitted (number 27035)
12/12/1956 To 75% Cut-off
12/12/1956 Diagram 94A boiler fitted (number 27033)
17/06/1958 Diagram 94HP boiler fitted (number 27062)
02/09/1959 Double Chimney fitted
12/02/1960 Diagram 94A boiler fitted (number 27030)
08/02/1962 Trough deflectors fitted


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 06/01/1925 12/01/1925 7 days Light Repair    
Gateshead Works 17/11/1925 19/11/1925 3 days Light Repair For naming
Named SIR HUGO
 
Darlington Works 11/01/1927 30/06/1927 171 days General    
Gateshead Works 26/01/1928 01/02/1928 7 days Light Repair Valves re-set
 
Darlington Works 18/04/1928 20/06/1928 64 days Heavy Boiler number 7799 (Diagram 94)
 
Gateshead Works 26/11/1928 29/11/1928 4 days Intermediate Valves re-set
 
Darlington Works 10/01/1929 11/04/1929 92 days General    
Darlington Works 30/12/1929 19/02/1930 52 days General Boiler number 7803 (Diagram 94)
Long Travel Valves fitted
 
Doncaster Works 06/06/1931 17/07/1931 42 days General Boiler number 7696 (Diagram 94)
 
Doncaster Works 11/07/1932 20/08/1932 41 days General    
Darlington Works 10/02/1933 17/02/1933 8 days Heavy New tyres
 
Doncaster Works 20/04/1933 03/06/1933 45 days General Westinghouse Pump removed
 
Doncaster Works 21/09/1934 19/10/1934 29 days General    
Doncaster Works 10/10/1935 04/12/1935 56 days General Boiler number 7704 (Diagram 94)
 
Doncaster Works 06/11/1936 09/12/1936 34 days General Tender number 5282 (GNR 5,000g) attached.
 
Doncaster Works 26/02/1937 06/03/1937 9 days Light Repair    
Doncaster Works 26/04/1937 01/05/1937 6 days Light Repair    
Darlington Works 05/08/1937 05/08/1937 1 day Weighing    
Darlington Works 21/10/1937 08/11/1937 19 days Unclassified    
Doncaster Works 03/01/1938 11/02/1938 40 days General    
Darlington Works 30/04/1938 12/05/1938 13 days Unclassified Right Driving box hot
 
Darlington Works 27/01/1939 27/01/1939 1 day Weighing    
Doncaster Works 06/03/1939 20/04/1939 46 days General    
Doncaster Works 05/04/1940 10/05/1940 36 days General    
Doncaster Works 04/11/1941 17/12/1941 44 days Heavy Rebuilt to class A3
Boiler number 8027 (Diagram 94HP)
Painted Wartime unlined black
 
Doncaster Works 06/09/1943 01/10/1943 26 days General    
Doncaster Works 07/02/1945 17/03/1945 39 days General    
Doncaster Works 15/06/1946 17/08/1946 64 days General Boiler number 9513 (Diagram 94A)
Painted Apple green with white lined black boiler bands, black frames and cylinders with red lining
 
Doncaster Works 15/09/1947 25/10/1947 41 days General    
Doncaster Works 20/04/1949 28/05/1949 39 days General Painted BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
Renumbered to BR 60083
 
Doncaster Works 02/02/1951 15/03/1951 42 days General Boiler number 27034 (Diagram 94A)
 
Doncaster Works 29/07/1952 02/09/1952 36 days General Right Hand Drive to Left Hand Drive
Painted Green with orange and black lining.
 
Doncaster Works 10/02/1954 12/03/1954 31 days General Boiler number 27016 (Diagram 94A)
 
Doncaster Works 26/05/1955 08/07/1955 44 days General Boiler number 27035 (Diagram 94A)
 
Doncaster Works 08/11/1956 12/12/1956 35 days General Boiler number 27033 (Diagram 94A)
To 75% Cut-off
 
Doncaster Works 28/03/1957 10/04/1957 14 days Light Casual    
Doncaster Works 07/05/1958 17/06/1958 42 days General Boiler number 27062 (Diagram 94HP)
 
Doncaster Works 18/08/1959 02/09/1959 16 days Light Casual Double Chimney fitted
 
Doncaster Works 05/01/1960 12/02/1960 39 days General Boiler number 27030 (Diagram 94A)
 
Doncaster Works 21/04/1961 11/05/1961 21 days Unclassified    
Doncaster Works 05/01/1962 08/02/1962 35 days General Trough deflectors fitted
 

Mentions ...
Report Date Title Report Source
31/05/1949 Darlington Works New Work May: Class 'A.1' Nos. 60148 an 60149. No. 60150 was ex the Paint Shop on 14/6, painted green. Locomotives awaiting Works durine May included: Nos. 812, 61069. 1407/15, 61600/61. 62709, 2726/41/56, 5109, 5675, 5784/87, 67317, 7609/19/20, 67708, 67741 (light repair), 8159, 9377, 69824/34/36, Class '8' 79184 an 90001. To scrap yard: Nos. 2377 (frames only), 3275/77, 3300/05/07/34, 65107, 5114, 5602, 65629 an 5703. Locomotives ex Works during May included: Nos. 60955, 61035. 61100 (unlined), 61199, 61224, 62397, 62745/53, 63351/95, 63440, 65040/47/89/92, 65110, 65653/55/59, 65730, 65848, 67319/31, 68061, 69106/11, Class '8' 90662/74. Nos. 60083/86 an 60127 have been noted here painted in the new blue colours with the crest on the tender. SLS/194907
23/04/1961 Doncaster Works (Stripping Road) New Erecting Shop: D2390/1, D3452, E3056/61-5. Stripping Road: D2402, D3152, D3487, 60033/8/9/64/83/8/95/8, 61814/49, 62049, 68945/90, 70010/35. Scrap Road: 64208/23/36, 64804/74/82, 68903/16/27/70/81, Crimpsall: 43149, 61384, 70001. Outside Crimpsall: DEPT7, 60143, 70053, 73012. Erecting Shop: D3445/89, D5573, D8217, 13252, 13326, 43126/44, 60020/40/63/8/75/90, 60126, 60520/8, 61162, 61205/11, 61363, 61897, 62025/42/60, 63985. Outside Erecting Shop: 60015, 61927, 62011. Paint Shop: D341, D2389, D5695, E3059/60, 60047/67, 60141, 60536, 61094, 73065. Works Shunters: DEPT10, DEPT11. SLS/196106
13/01/1962 Doncaster Works (Crimpsal) New Erecting Shop: D3453, E3088-94. Outside Erecting Shop: 60817, 61375, 61861/99, 63858, 68900, 70003/7. Erecting Shop: D2406, D3289, 13336, D3487, D5522/47/95, D5822. D8021, 08213, D9012, 12133, 43032, 60025/47/61/87, 60134, 60854, 61051, 61223/52, 61374, 62013, 63924/38, 70006, 76046. Stripping Road-dept. 10/1: 60938, 62034, 63571. Outside Crimpsal: D3482. 70018. Crimpsal: 60014/43/63/83/97. Outside Weighshop: 60138/57. Paint Shop: D374 (BE 3120 VF D670 of 1961), D5369 (BRCW DEL 212 of 1961), D5644, D5828 (Brush 364 of 1961), D5830 (Brush 366 of 1961), E3086/7, 60027/84 an 60125. SLS/196202
28/01/1962 Doncaster Works (Erecting Shop) New Erecting Shop: D5643, D8213, E3072-6. Stripping Road: D4055/63, 60129, 60853, 61285, 61315, 63630, 73036. Crimpsall: 60119, 63962. Outside Crimpsall: 60870, 60938, 61168, 62021/34. Scrap Road: 68900 intact, 61862, 61908 being cut up. Erecting Shop: D3482, D5525/95, D5642/57, 12126/33, 13288, 60043/61/78/83/97, 60107, 60817, 61252, 61374/5, 61899, 63571, 70003/7, 76021. Erecting Shop Yard: 60062, 60112. Boiler Park: 60014/47. Weigh House: D5547. Outside Weigh House: D3289, 61223, 63924, 68928, 70006. Paint Shop: D3336, D3487, D5371/2, D5822, E3070/1, 60087, 76046. Paint Shop Yard: Nil. Works Shunters: DEPT. 10/1. SLS/196203

Summary
Date Event Details Source See Also
06/12/1924 To Service To service as London and North Eastern Railway Number 2582
Built at North British Locomotive Company, Glasgow, Works Number 23120
Allocated to Heaton (HTN)
Livery applied: Apple green with white lined black boiler bands, black frames and cylinders with red lining
Tender fitted: GNR 5,000g
Diagram 94 boiler fitted
   
06/01/1925 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 06/01/1925. Dep: 12/01/1925.    
17/11/1925 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 17/11/1925. Dep: 19/11/1925.
Work undertaken:
For naming
Named SIR HUGO
   
11/01/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 11/01/1927. Dep: 30/06/1927.    
26/01/1928 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 26/01/1928. Dep: 01/02/1928.
Work undertaken:
Valves re-set
   
18/04/1928 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 18/04/1928. Dep: 20/06/1928.
Work undertaken:
Boiler number 7799 (Diagram 94)
   
26/11/1928 Works Visit Works Visit - Gateshead Works (Intermediate) - Arr: 26/11/1928. Dep: 29/11/1928.
Work undertaken:
Valves re-set
   
10/01/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 10/01/1929. Dep: 11/04/1929.    
30/12/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 30/12/1929. Dep: 19/02/1930.
Work undertaken:
Boiler number 7803 (Diagram 94)
Long Travel Valves fitted
   
06/06/1931 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/06/1931. Dep: 17/07/1931.
Work undertaken:
Boiler number 7696 (Diagram 94)
   
11/07/1932 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/07/1932. Dep: 20/08/1932.    
10/02/1933 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 10/02/1933. Dep: 17/02/1933.
Work undertaken:
New tyres
   
20/04/1933 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/04/1933. Dep: 03/06/1933.
Work undertaken:
Westinghouse Pump removed
   
21/09/1934 Works Visit Works Visit - Doncaster Works (General) - Arr: 21/09/1934. Dep: 19/10/1934.    
10/10/1935 Works Visit Works Visit - Doncaster Works (General) - Arr: 10/10/1935. Dep: 04/12/1935.
Work undertaken:
Boiler number 7704 (Diagram 94)
   
06/11/1936 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/11/1936. Dep: 09/12/1936.
Work undertaken:
Tender number 5282 (GNR 5,000g) attached.
   
26/02/1937 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 26/02/1937. Dep: 06/03/1937.    
26/04/1937 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 26/04/1937. Dep: 01/05/1937.    
05/08/1937 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 05/08/1937. Dep: 05/08/1937.    
21/10/1937 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 21/10/1937. Dep: 08/11/1937.    
03/01/1938 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/01/1938. Dep: 11/02/1938.    
30/04/1938 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 30/04/1938. Dep: 12/05/1938.
Work undertaken:
Right Driving box hot
   
27/01/1939 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 27/01/1939. Dep: 27/01/1939.    
06/03/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/03/1939. Dep: 20/04/1939.    
05/04/1940 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/04/1940. Dep: 10/05/1940.    
17/06/1940 Allocation Reallocated to Gateshead (GHD)    
26/10/1940 Allocation Reallocated to Heaton (HTN)    
04/11/1941 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 04/11/1941. Dep: 17/12/1941.
Work undertaken:
Rebuilt to class A3
Boiler number 8027 (Diagram 94HP)
Painted Wartime unlined black
   
06/09/1943 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/09/1943. Dep: 01/10/1943.    
07/02/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/02/1945. Dep: 17/03/1945.    
1946 Number Allocated Allocated number 551 but not taken up    
15/06/1946 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/06/1946. Dep: 17/08/1946.
Work undertaken:
Boiler number 9513 (Diagram 94A)
Painted Apple green with white lined black boiler bands, black frames and cylinders with red lining
   
17/08/1946 Livery Change of livery to Apple green with white lined black boiler bands, black frames and cylinders with red lining    
20/10/1946 Renumbered Renumbered to 83    
15/09/1947 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/09/1947. Dep: 25/10/1947.    
20/04/1949 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/04/1949. Dep: 28/05/1949.
Work undertaken:
Painted BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
Renumbered to BR 60083
   
28/05/1949 Livery Change of livery to BR Blue for steam locomotives, with broad black, inlaid with thin white lining.    
02/02/1951 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/02/1951. Dep: 15/03/1951.
Work undertaken:
Boiler number 27034 (Diagram 94A)
   
29/07/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/07/1952. Dep: 02/09/1952.
Work undertaken:
Right Hand Drive to Left Hand Drive
Painted Green with orange and black lining.
   
02/09/1952 Livery Change of livery to Green with orange and black lining.    
10/02/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 10/02/1954. Dep: 12/03/1954.
Work undertaken:
Boiler number 27016 (Diagram 94A)
   
26/05/1955 Works Visit Works Visit - Doncaster Works (General) - Arr: 26/05/1955. Dep: 08/07/1955.
Work undertaken:
Boiler number 27035 (Diagram 94A)
   
08/11/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/11/1956. Dep: 12/12/1956.
Work undertaken:
Boiler number 27033 (Diagram 94A)
To 75% Cut-off
   
28/03/1957 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 28/03/1957. Dep: 10/04/1957.    
07/05/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/05/1958. Dep: 17/06/1958.
Work undertaken:
Boiler number 27062 (Diagram 94HP)
   
18/08/1959 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 18/08/1959. Dep: 02/09/1959.
Work undertaken:
Double Chimney fitted
   
05/01/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/01/1960. Dep: 12/02/1960.
Work undertaken:
Boiler number 27030 (Diagram 94A)
   
21/04/1961 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 21/04/1961. Dep: 11/05/1961.    
05/01/1962 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/01/1962. Dep: 08/02/1962.
Work undertaken:
Trough deflectors fitted
   
16/06/1963 Allocation Reallocated to Gateshead (52A)    
18/05/1964 Withdrawn Condemned as 60083 from Gateshead (52A)    
08/1964 Scrapped Scrapped    

prev