Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 1470 Today
» 4397 Yesterday
» 19273 Week
» 72289 Month
» 191816 Year
» 3218669 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1025 on 22/04/1947
British Railways 61025   24/12/1948

Names Carried
Date From Name
22/04/1947 PALLAH

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 2005
Fittings (as built)
Engine Brakes Steam
To Service Sun 22/04/1947 to Tweedmouth (TWD)
Withdrawal Sun 02/12/1962 off Alnmouth (52d)
Service Life 15 yrs, 7 mths , 10 dys

Disposal
Scrapping During 03/1963 at Locomotive Works (Darlington)

Notes
Notes In 3/63 for cutting up at Darlington

Allocations
Code Subsequent Codes Name From Date
TWD   Tweedmouth (New) on 22/04/1947
HAY   Haymarket on 29/08/1948
HAY   Haymarket w/e 04/09/1948
TWD   Tweedmouth on 31/10/1948
TWD   Tweedmouth w/e 06/11/1948
52C   Blaydon on 12/06/1960
52d   Alnmouth on 04/11/1962
     Withdrawn on 02/12/1962

SLS Allocations*
Type Code Name From Date
NEW TWD Tweedmouth on 22/04/1947
ALLOC HAY Haymarket w/e 04/09/1948
ALLOC TWD Tweedmouth w/e 06/11/1948
ALLOC 52C Blaydon 3w/e 02/07/1960
ALLOC 52Da   5w/e 10/11/1962
WDN   on 03/12/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/04/1947 Diagram 100A boiler fitted (number 3773)
26/03/1953 Diagram 100A boiler fitted (number 28211)
07/09/1957 Diagram 100A boiler fitted (number 28126)
28/01/1960 Mechanical elements of ATC fitted
28/01/1960 Diagram 100A boiler fitted (number 28162)
21/10/1960 Electrical elements of ATC fitted


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 20/11/1948 25/12/1948 36 days General Renumbered to BR 61025
 
Cowlairs Works 20/10/1950 30/11/1950 42 days Heavy Intermediate    
Darlington Works 25/02/1953 26/03/1953 30 days General Boiler number 28211 (Diagram 100A)
 
Darlington Works 31/03/1953 02/04/1953 3 days Unclassified    
Darlington Works 25/05/1953 13/06/1953 20 days Light Casual    
Gateshead Works 03/01/1955 04/02/1955 33 days Heavy Casual    
Darlington Works 05/07/1955 30/07/1955 26 days General    
Darlington Works 02/08/1955 03/08/1955 2 days Unclassified    
Darlington Works 14/08/1957 07/09/1957 25 days General Boiler number 28126 (Diagram 100A)
 
Darlington Works 09/09/1957 11/09/1957 3 days Unclassified    
Darlington Works 11/02/1960 18/02/1960 8 days Unclassified    
Darlington Works 18/10/1960 21/10/1960 4 days Unclassified Electrical elements of ATC fitted
 
Darlington Works 22/11/1960 28/01/1960 -298 days General    
Darlington Works 26/04/1961 12/05/1961 17 days Light Casual    

Summary
Date Event Details Source See Also
22/04/1947 To Service To service as London and North Eastern Railway Number 1025, name: PALLAH
Built at Darlington Works, Works Number 2005
Allocated to Tweedmouth (TWD)
Diagram 100A boiler fitted
   
29/08/1948 Allocation Reallocated to Haymarket (HAY)    
04/09/1948 Allocation Reallocated to Haymarket (HAY)    
31/10/1948 Allocation Reallocated to Tweedmouth (TWD)    
06/11/1948 Allocation Reallocated to Tweedmouth (TWD)    
20/11/1948 Works Visit Works Visit - Gorton Works (General) - Arr: 20/11/1948. Dep: 25/12/1948.
Work undertaken:
Renumbered to BR 61025
   
20/10/1950 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 20/10/1950. Dep: 30/11/1950.    
25/02/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 25/02/1953. Dep: 26/03/1953.
Work undertaken:
Boiler number 28211 (Diagram 100A)
   
31/03/1953 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 31/03/1953. Dep: 02/04/1953.    
25/05/1953 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 25/05/1953. Dep: 13/06/1953.    
03/01/1955 Works Visit Works Visit - Gateshead Works (Heavy Casual) - Arr: 03/01/1955. Dep: 04/02/1955.    
05/07/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 05/07/1955. Dep: 30/07/1955.    
02/08/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 02/08/1955. Dep: 03/08/1955.    
14/08/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 14/08/1957. Dep: 07/09/1957.
Work undertaken:
Boiler number 28126 (Diagram 100A)
   
09/09/1957 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 09/09/1957. Dep: 11/09/1957.    
28/01/1960 Modification Diagram 100A number 28162 boiler fitted    
28/01/1960 Modification Modification: Mechanical elements of ATC fitted    
11/02/1960 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 11/02/1960. Dep: 18/02/1960.    
12/06/1960 Allocation Reallocated to Blaydon (52C)    
18/10/1960 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 18/10/1960. Dep: 21/10/1960.
Work undertaken:
Electrical elements of ATC fitted
   
22/11/1960 Works Visit Works Visit - Darlington Works (General) - Arr: 22/11/1960. Dep: 28/01/1960.    
26/04/1961 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 26/04/1961. Dep: 12/05/1961.    
04/11/1962 Allocation Reallocated to Alnmouth (52d)    
02/12/1962 Withdrawn Condemned as 61025 from Alnmouth (52D.1)    
03/1963 Scrapped Broken up by Locomotive Works: Darlington    

prev prev