Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

Counter

Ad Visitor Statistics
» 19 Online
» 418 Today
» 937 Yesterday
» 1355 Week
» 8539 Month
» 316520 Year
» 1200901 Total
Record: 1668 (12/02/2017)
(Free MySQL Counter)

Advertising



In Touch

Bookmark and Share

Follow BRDatabase on Twitter
prev prev
Numbers Carried
Company Number Date From
LNER (1946) 1042   04/05/1946
BR 61042   02/07/1948

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder North British Locomotive Company, Glasgow
Order Number L958
Works Number 25799
Brakes (when built) Steam Brake
To Service Sun 04/05/1946 to Cambridge (CAM)
Withdrawal Sun 17/04/1966 off Doncaster (36A)
Scrapping During 05/1966 at Cohens (Kettering)
Service Life 19 yrs, 11 mths , 13 dys

Notes
Notes Sold 5/66 for scrap to G Cohen, Kettering

Allocations
Code Name From Date
CAM Cambridge (New) 04/05/1946
NOR Norwich Thorpe 22/07/1946
32D Yarmouth South Town 06/01/1957
32A Norwich Thorpe 24/02/1957
31B March 29/11/1959
40A Lincoln 21/02/1960
40B Immingham 22/09/1963
40E Colwick 26/09/1965
36A Doncaster 28/11/1965
   Withdrawn 17/04/1966

SLS Allocations*
Type Code Name From Date
ALLOC 32D Yarmouth South Town 4w/e 26/01/1957
ALLOC 32A Norwich Thorpe 4w/e 23/03/1957
ALLOC 31B March 4w/e 26/12/1959
ALLOC 40A Lincoln 4w/e 19/03/1960
ALLOC 40B Immingham 6w/e 05/10/1963
ALLOC 40E Colwick 5w/e 09/10/1965
ALLOC 36A Doncaster 2w/e 11/12/1965
WDN   17/04/1966

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
04/05/1946 Diagram 100A boiler fitted (number 5064)
28/06/1947 Diagram 100A boiler fitted (number 5104)
06/05/1950 Diagram 100A boiler fitted (number 5099)
09/02/1952 Diagram 100A boiler fitted (number 28575)
29/08/1953 Diagram 100A boiler fitted (number 28349)
11/06/1955 Diagram 100A boiler fitted (number 28588)
26/04/1957 Diagram 100A boiler fitted (number 28841)
13/03/1959 BTH speed indicator fitted
13/03/1959 Modified bogie springs fitted
13/03/1959 Mechanical elements of ATC fitted
13/03/1959 Diagram 100A boiler fitted (number 28505)
02/12/1961 Diagram 100A boiler fitted (number 28452)


Works Visits
Works Entry Departure Durn Level of Work Mileage
Stratford Works 17/06/1947 28/06/1947 12 days Heavy
Boiler number 5104 (Diagram 100A)
 
Stratford Works 03/05/1948 02/07/1948 61 days General
Renumbered to BR 61042
 
Stratford Works 08/01/1950 13/01/1950 6 days Unclassified  
Stratford Works 28/02/1950 06/05/1950 68 days General
Boiler number 5099 (Diagram 100A)
 
Stratford Works 06/09/1950 23/09/1950 18 days Light Casual  
Stratford Works 01/01/1952 09/02/1952 40 days General
Boiler number 28575 (Diagram 100A)
 
Stratford Works 13/01/1953 15/01/1953 3 days Unclassified  
Gorton Works 07/07/1953 29/08/1953 54 days General
Boiler number 28349 (Diagram 100A)
 
Stratford Works 10/05/1955 11/06/1955 33 days General
Boiler number 28588 (Diagram 100A)
 
Stratford Works 04/03/1957 26/04/1957 54 days General
Boiler number 28841 (Diagram 100A)
 
Stratford Works 21/10/1957 23/11/1957 34 days Light Casual  
Stratford Works 26/01/1959 13/03/1959 47 days General
Boiler number 3419 (Diagram 100A)
BTH speed indicator fitted
 
Doncaster Works 14/03/1960 26/03/1960 13 days Unclassified  
Doncaster Works 01/04/1960 21/04/1960 21 days Light Casual  
Doncaster Works 16/01/1961 26/01/1961 11 days Unclassified  
Doncaster Works 18/10/1961 02/12/1961 46 days General
Boiler number 28452 (Diagram 100A)
 

Summary
Date Event Details Source See Also
04/05/1946 To Service To service as LNER Number 1042
Built at North British Locomotive Company, Glasgow, Works Number 25799
Allocated to Cambridge (CAM)
Diagram 100A boiler fitted
   
22/07/1946 Allocation Reallocated to Norwich Thorpe (NOR)    
17/06/1947 Works Visit Works Visit - Stratford Works (Heavy) - Arr: 17/06/1947. Dep: 28/06/1947.
Work undertaken:
Boiler number 5104 (Diagram 100A)
   
03/05/1948 Works Visit Works Visit - Stratford Works (General) - Arr: 03/05/1948. Dep: 02/07/1948.
Work undertaken:
Renumbered to BR 61042
   
08/01/1950 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 08/01/1950. Dep: 13/01/1950.    
28/02/1950 Works Visit Works Visit - Stratford Works (General) - Arr: 28/02/1950. Dep: 06/05/1950.
Work undertaken:
Boiler number 5099 (Diagram 100A)
   
06/09/1950 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 06/09/1950. Dep: 23/09/1950.    
01/01/1952 Works Visit Works Visit - Stratford Works (General) - Arr: 01/01/1952. Dep: 09/02/1952.
Work undertaken:
Boiler number 28575 (Diagram 100A)
   
13/01/1953 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 13/01/1953. Dep: 15/01/1953.    
07/07/1953 Works Visit Works Visit - Gorton Works (General) - Arr: 07/07/1953. Dep: 29/08/1953.
Work undertaken:
Boiler number 28349 (Diagram 100A)
   
10/05/1955 Works Visit Works Visit - Stratford Works (General) - Arr: 10/05/1955. Dep: 11/06/1955.
Work undertaken:
Boiler number 28588 (Diagram 100A)
   
06/01/1957 Allocation Reallocated to Yarmouth South Town (32D)    
24/02/1957 Allocation Reallocated to Norwich Thorpe (32A)    
04/03/1957 Works Visit Works Visit - Stratford Works (General) - Arr: 04/03/1957. Dep: 26/04/1957.
Work undertaken:
Boiler number 28841 (Diagram 100A)
   
21/10/1957 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 21/10/1957. Dep: 23/11/1957.    
26/01/1959 Works Visit Works Visit - Stratford Works (General) - Arr: 26/01/1959. Dep: 13/03/1959.
Work undertaken:
Boiler number 3419 (Diagram 100A)
BTH speed indicator fitted
   
29/11/1959 Allocation Reallocated to March (31B)    
21/02/1960 Allocation Reallocated to Lincoln (40A)    
14/03/1960 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 14/03/1960. Dep: 26/03/1960.    
01/04/1960 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 01/04/1960. Dep: 21/04/1960.    
16/01/1961 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 16/01/1961. Dep: 26/01/1961.    
18/10/1961 Works Visit Works Visit - Doncaster Works (General) - Arr: 18/10/1961. Dep: 02/12/1961.
Work undertaken:
Boiler number 28452 (Diagram 100A)
   
02/12/1961 Sightings Doncaster Works visit: Around the Works - Outside weigh house. SLS 1/1962 Link
22/09/1963 Allocation Reallocated to Immingham (40B)    
26/09/1965 Allocation Reallocated to Colwick (40E)    
28/11/1965 Allocation Reallocated to Doncaster (36A)    
17/04/1966 Withdrawn Condemned as 61042 from Doncaster (36A)    
05/1966 Scrapped Broken up by Cohens: Kettering    

prev prev