Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 1619 Today
» 4397 Yesterday
» 19422 Week
» 72438 Month
» 191965 Year
» 3218818 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
British Railways 61406 on 20/05/1950

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 2108
Fittings (as built)
Engine Brakes Steam
To Service Sun 20/05/1950 to Lincoln (40A)
Withdrawal Sun 17/04/1966 off Doncaster (36A)
Service Life 15 yrs, 10 mths , 28 dys

Disposal
Scrapping During 05/1966 at Cohens (Kettering)

Notes
Notes Sold 5/66 for scrap to G Cohen, Kettering

Allocations
Code Subsequent Codes Name From Date
40A   Lincoln (New) on 20/05/1950
40B   Immingham on 21/05/1950
36A   Doncaster on 06/02/1966
     Withdrawn on 17/04/1966

SLS Allocations*
Type Code Name From Date
NEW 40A Lincoln on 20/05/1950
ALLOC 40B Immingham w/e 21/05/1950
ALLOC 36A Doncaster 2w/e 12/02/1966
WDN   on 17/04/1966

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
20/05/1950 Diagram 100A boiler fitted (number 5139)
15/09/1951 Diagram 100A boiler fitted (number 28342)
05/12/1952 Diagram 100A boiler fitted (number 28311)
04/09/1954 Diagram 100A boiler fitted (number 28179)
26/01/1957 Diagram 100A boiler fitted (number 28807)
31/01/1959 Diagram 100A boiler fitted (number 28563)
29/10/1960 Diagram 100A boiler fitted (number 28356)
09/08/1963 Diagram 100A boiler fitted (number 28269)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 23/05/1950 27/05/1950 5 days Unclassified    
Darlington Works 15/06/1950 16/06/1950 2 days Unclassified    
Gorton Works 08/07/1951 15/09/1951 70 days General Boiler number 28342 (Diagram 100A)
 
Doncaster Works 18/06/1952 18/06/1952 1 day Weighing    
Doncaster Works 11/11/1952 05/12/1952 25 days General Boiler number 28311 (Diagram 100A)
 
Doncaster Works 01/07/1953 08/07/1953 8 days Unclassified    
Gorton Works 28/08/1954 04/09/1954 8 days Heavy Casual Boiler number 28179 (Diagram 100A)
 
Darlington Works 14/03/1955 07/04/1955 25 days Heavy Intermediate    
Doncaster Works 29/12/1956 26/01/1957 29 days General Boiler number 28807 (Diagram 100A)
 
Doncaster Works 30/12/1958 31/01/1959 33 days General Boiler number 28563 (Diagram 100A)
 
Doncaster Works 03/10/1960 29/10/1960 27 days General Boiler number 28356 (Diagram 100A)
 
Doncaster Works 23/10/1961 23/10/1961 1 day Weighing    
Doncaster Works 30/05/1963 09/08/1963 72 days General Boiler number 28269 (Diagram 100A)
 

Mentions ...
Report Date Title Report Source
04/01/1959 Doncaster Works (Yard) Erecting Shop-60162 (64B), 60003 (34A), 60035 (64B), 60017 (34A), 60145 (52A), 60103 (34A), 62030 (52C), 73000 (41B), 73155 (41C), 61122 (36A), 61971 (32A), 61889 (31B), 61820 (30F), 61890 (31B), 68987 (34B), 61162 (36A), 61846 (53A), 61409 (40B), 60001 (52A), 61158 (36A), 60526/502 (50A), 60039 (34A), 60152 (64B), 60026 (34A), 60520 (34F). Paint Shop-D3321 (52B), D3148 (51L), D5308 (34B), D6101/2 (34B), 60117 (56C), 61925 (36A), 60160 (64B), 62032 (31B). Yard-70030 (32A), 68914 (56B), 73016 (41C), 63940 (34F), D3079 (53A), 60508 (34E), 11182 (40A), 63975 (36A), 60063 (34F), 60095 (12C), 61816 (31B), 61406 (40B). Diesel Shop-E5001/2 motors in, D2050/1 motors in, 11106 (51C), 13147/51 (51L). Withdrawn-64216/7, 61606/48/22, 69493, 67397, 69544, 64201/74/6, 69551, 69593, 64205/49, 64183. SLS/195902

Summary
Date Event Details Source See Also
20/05/1950 To Service To service as British Railways Number 61406
Built at Darlington Works, Works Number 2108
Allocated to Lincoln (40A)
Diagram 100A boiler fitted
   
21/05/1950 Allocation Reallocated to Immingham (40B)    
23/05/1950 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 23/05/1950. Dep: 27/05/1950.    
15/06/1950 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 15/06/1950. Dep: 16/06/1950.    
08/07/1951 Works Visit Works Visit - Gorton Works (General) - Arr: 08/07/1951. Dep: 15/09/1951.
Work undertaken:
Boiler number 28342 (Diagram 100A)
   
18/06/1952 Works Visit Works Visit - Doncaster Works (Weighing) - Arr: 18/06/1952. Dep: 18/06/1952.    
11/11/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/11/1952. Dep: 05/12/1952.
Work undertaken:
Boiler number 28311 (Diagram 100A)
   
01/07/1953 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 01/07/1953. Dep: 08/07/1953.    
28/08/1954 Works Visit Works Visit - Gorton Works (Heavy Casual) - Arr: 28/08/1954. Dep: 04/09/1954.
Work undertaken:
Boiler number 28179 (Diagram 100A)
   
14/03/1955 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 14/03/1955. Dep: 07/04/1955.    
29/12/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/12/1956. Dep: 26/01/1957.
Work undertaken:
Boiler number 28807 (Diagram 100A)
   
30/12/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 30/12/1958. Dep: 31/01/1959.
Work undertaken:
Boiler number 28563 (Diagram 100A)
   
03/10/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/10/1960. Dep: 29/10/1960.
Work undertaken:
Boiler number 28356 (Diagram 100A)
   
23/10/1961 Works Visit Works Visit - Doncaster Works (Weighing) - Arr: 23/10/1961. Dep: 23/10/1961.    
30/05/1963 Works Visit Works Visit - Doncaster Works (General) - Arr: 30/05/1963. Dep: 09/08/1963.
Work undertaken:
Boiler number 28269 (Diagram 100A)
   
06/02/1966 Allocation Reallocated to Doncaster (36A)    
17/04/1966 Withdrawn Condemned as 61406 from Doncaster (36A)    
05/1966 Scrapped Broken up by Cohens: Kettering    

prev prev