Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

Counter

Ad Visitor Statistics
» 8 Online
» 754 Today
» 1015 Yesterday
» 4922 Week
» 20036 Month
» 323226 Year
» 1544791 Total
Record: 1668 (12/02/2017)
(Free MySQL Counter)

Advertising



In Touch

Bookmark and Share

Follow BRDatabase on Twitter
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 911 m/e 08/1920
London and North Eastern Railway (1946) 1413   14/11/1946
British Railways 61413   07/05/1948

Locomotive Specifics
Designer V. Raven
Class B16
Company History NER/LNER
Wheels 4-6-0
Builder Darlington Works
Fittings (as built)
Engine Brakes Westinghouse brake with Vacuum Ejector
To Service During 08/1920 to York (North) (YK)
Withdrawal Mon 25/09/1961 off Mirfield (56D)
Scrapping During 03/1963 at Locomotive Works (Darlington)
Service Life 41 yrs, 1 mth , 25 dys

Notes
Notes Into Darlington for cutting up 11/10/61

Allocations
Code Name From Date
YK York (North) (New) m/e 08/1920
GOR Gorton on 22/09/1924
YK York (North) on 06/03/1925
TWD Tweedmouth on 28/10/1931
YK York (North) on 16/10/1934
SKN Stockton on 06/05/1946
YK York (North) on 24/08/1947
NEV Neville Hill on 07/08/1949
52B Heaton on 25/09/1955
50A York (North) on 08/06/1958
56D Mirfield on 11/12/1960
   Withdrawn on 25/09/1961

SLS Allocations*
Type Code Name From Date
ALLOC YK York (North) on 24/08/1947
ALLOC NEV Neville Hill w/e 13/08/1949
ALLOC 52B Heaton 4w/e 08/10/1955
ALLOC 50A York (North) 4w/e 14/06/1958
ALLOC 56D Mirfield on 17/12/1960
WDN   on 25/09/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
08/1920 Diagram 49 boiler fitted (number D1117)
09/01/1928 Diagram 49 boiler fitted (number D980)
15/05/1931 Diagram 49 boiler fitted (number D1449)
21/08/1933 Diagram 49 boiler fitted (number D1592)
01/12/1937 Diagram 49 boiler fitted (number D1442)
03/05/1940 Diagram 49A boiler fitted (number 3051)
27/11/1942 Diagram 49A boiler fitted (number 3055)
12/07/1945 Diagram 49A boiler fitted (number 3027)
07/05/1948 Diagram 49A boiler fitted (number 3246)
26/01/1952 Diagram 49 boiler fitted (number 24045)
15/10/1954 Diagram 49A boiler fitted (number 24100)
25/05/1957 Diagram 49 boiler fitted (number 24008)
20/08/1960 Diagram 49 boiler fitted (number 24082)


Works Visits
Works Stopped Entry Departure Durn Level of Work Mileage
Darlington Works 04/07/1924 01/10/1924 90 days General  
Darlington Works 21/09/1927 09/01/1928 111 days General
Boiler number D980 (Diagram 49)
 
Darlington Works 18/08/1930 01/09/1930 15 days Unclassified  
Darlington Works 31/03/1931 15/05/1931 46 days General
Boiler number D1449 (Diagram 49)
 
Darlington Works 06/07/1933 21/08/1933 47 days General
Boiler number D1592 (Diagram 49)
 
Darlington Works 14/01/1935 28/02/1935 46 days General  
Darlington Works 21/12/1936 01/03/1937 71 days Light Repair  
Darlington Works 15/10/1937 01/12/1937 48 days General
Boiler number D1442 (Diagram 49)
 
Darlington Works 31/07/1939 18/09/1939 50 days Heavy  
Darlington Works 20/09/1939 22/09/1939 3 days Unclassified  
Darlington Works 06/04/1940 03/05/1940 28 days General
Boiler number 3051 (Diagram 49A)
 
Darlington Works 02/11/1942 27/11/1942 26 days General
Boiler number 24024 (Diagram 49A)
 
Darlington Works 12/06/1945 12/07/1945 31 days General
Boiler number 3027 (Diagram 49A)
 
Gateshead Works 24/10/1946 14/11/1946 22 days Light Repair
Renumbered to LNER (1946) number 1413
 
Darlington Works 03/04/1948 07/05/1948 35 days General
Boiler number 3246 (Diagram 49A)
Renumbered to BR 61413
 
Gateshead Works 25/11/1949 03/01/1950 40 days Light Casual  
Darlington Works 27/12/1951 26/01/1952 31 days General
Boiler number 24045 (Diagram 49)
 
Darlington Works 15/09/1954 15/10/1954 31 days General
Boiler number 24100 (Diagram 49A)
 
Darlington Works 11/01/1955 24/01/1955 14 days Light Casual
After collision
 
Darlington Works 30/05/1956 02/06/1956 4 days Special
Tender change
 
Darlington Works 13/06/1956 22/06/1956 10 days Unclassified  
Darlington Works 25/04/1957 25/05/1957 31 days General
Boiler number 24008 (Diagram 49)
 
Darlington Works 17/05/1960 20/08/1960 96 days General
Boiler number 24082 (Diagram 49)
 

Mentions ...
Report Date Title Report Source
08/10/1955 North Eastern Miscellany Class B16 engines have now appeared at sheds in the Newcastle-upon-Tyne area and the following have been noted working between Heaton and Berwick on various classes of trains: 61410/13/14/15/40/67/69. Class K2 2-6-0 locos noted en route between Newcastle and Cowlairs recently for overhaul and repainting have been Nos. 61720/27/62/65. Standard Class 5 4-6-0 73101 worked a Newcastle-Berwick passenger train on the 21st Sept. en route for the Scottish Region. Class J21 0-6-0 Nos. 65117 an 65070 were hauled dead by a Class J39 for the north on 4/10 and a class Dll 4-4-0 62684 hauled Class K1 62031 dead from Haymarket shed to Gateshead on October 5th. During mid-October, Class D49 4-4-0 Nos. 62752 an 62720 have been observed working a morning Sunderland-Newcastle slow passenger train as a running-in turn, both engines being recently ex-works. SLS/195512
17/12/1960 Mirfield MPD From 17th Dec., six B16s have been allocated for freight duties, viz.' 61411-4/6/47;, during 1959, several were on loan to this shed while the 4 Mirfield B1s were in shops. SLS/196102

Summary
Date Event Details Source See Also
08/1920 To Service To service as North Eastern Railway Number 911
Built at Darlington Works, Works Number
Allocated to York (North) (YK)
Diagram 49 boiler fitted
   
04/07/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 04/07/1924. Dep: 01/10/1924.    
22/09/1924 Allocation Reallocated to Gorton (GOR)    
06/03/1925 Allocation Reallocated to York (North) (YK)    
21/09/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 21/09/1927. Dep: 09/01/1928.
Work undertaken:
Boiler number D980 (Diagram 49)
   
18/08/1930 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 18/08/1930. Dep: 01/09/1930.    
31/03/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 31/03/1931. Dep: 15/05/1931.
Work undertaken:
Boiler number D1449 (Diagram 49)
   
28/10/1931 Allocation Reallocated to Tweedmouth (TWD)    
06/07/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 06/07/1933. Dep: 21/08/1933.
Work undertaken:
Boiler number D1592 (Diagram 49)
   
16/10/1934 Allocation Reallocated to York (North) (YK)    
14/01/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 14/01/1935. Dep: 28/02/1935.    
21/12/1936 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 21/12/1936. Dep: 01/03/1937.    
15/10/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 15/10/1937. Dep: 01/12/1937.
Work undertaken:
Boiler number D1442 (Diagram 49)
   
31/07/1939 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 31/07/1939. Dep: 18/09/1939.    
20/09/1939 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 20/09/1939. Dep: 22/09/1939.    
06/04/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 06/04/1940. Dep: 03/05/1940.
Work undertaken:
Boiler number 3051 (Diagram 49A)
   
02/11/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 02/11/1942. Dep: 27/11/1942.
Work undertaken:
Boiler number 24024 (Diagram 49A)
   
12/06/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 12/06/1945. Dep: 12/07/1945.
Work undertaken:
Boiler number 3027 (Diagram 49A)
   
06/05/1946 Allocation Reallocated to Stockton (SKN)    
24/10/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 24/10/1946. Dep: 14/11/1946.
Work undertaken:
Renumbered to LNER (1946) number 1413
   
24/08/1947 Allocation Reallocated to York (North) (YK)    
03/04/1948 Works Visit Works Visit - Darlington Works (General) - Arr: 03/04/1948. Dep: 07/05/1948.
Work undertaken:
Boiler number 3246 (Diagram 49A)
Renumbered to BR 61413
   
07/08/1949 Allocation Reallocated to Neville Hill (NEV)    
25/11/1949 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 25/11/1949. Dep: 03/01/1950.    
27/12/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 27/12/1951. Dep: 26/01/1952.
Work undertaken:
Boiler number 24045 (Diagram 49)
   
15/09/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 15/09/1954. Dep: 15/10/1954.
Work undertaken:
Boiler number 24100 (Diagram 49A)
   
11/01/1955 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 11/01/1955. Dep: 24/01/1955.
Work undertaken:
After collision
   
25/09/1955 Allocation Reallocated to Heaton (52B)    
30/05/1956 Works Visit Works Visit - Darlington Works (Special) - Arr: 30/05/1956. Dep: 02/06/1956.
Work undertaken:
Tender change
   
13/06/1956 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 13/06/1956. Dep: 22/06/1956.    
25/04/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 25/04/1957. Dep: 25/05/1957.
Work undertaken:
Boiler number 24008 (Diagram 49)
   
08/06/1958 Allocation Reallocated to York (North) (50A)    
17/05/1960 Works Visit Works Visit - Darlington Works (General) - Arr: 17/05/1960. Dep: 20/08/1960.
Work undertaken:
Boiler number 24082 (Diagram 49)
   
11/12/1960 Allocation Reallocated to Mirfield (56D)    
25/09/1961 Withdrawn Condemned as 61413 from Mirfield (56D)    

prev prev