Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 27 Online
» 1824 Today
» 4163 Yesterday
» 15230 Week
» 68246 Month
» 187773 Year
» 3214626 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2381 on 16/08/1923
London and North Eastern Railway (1946) 1452 on 17/02/1946
British Railways 61452   26/11/1949

Locomotive Specifics
Designer V. Raven
Class B16
Company History NER/LNER
Wheels 4-6-0
Builder Darlington Works
Works Number 1190
Fittings (as built)
Engine Brakes Westinghouse brake with Vacuum Ejector
To Service Mon 16/08/1923 to Gateshead (GHD)
Withdrawal Mon 25/09/1961 off York (North) (50A)
Service Life 38 yrs, 1 mth , 9 dys

Disposal
Scrapping During 02/1962 at Locomotive Works (Darlington)

Notes
Notes Into Darlington for cutting up 30/11/61

Allocations
Code Subsequent Codes Name From Date
GHD   Gateshead (New) on 16/08/1923
YK   York (North) on 29/06/1936
HLD   Hull Dairycoates on 11/09/1949
HLD   Hull Dairycoates w/e 17/09/1949
YK   York (North) on 04/12/1949
YK   York (North) w/e 10/12/1949
50B   Neville Hill on 06/05/1951
50B   Neville Hill w/e 12/05/1951
50A   York (North) on 15/11/1953
50B   Neville Hill on 14/03/1954
50A   York (North) on 18/07/1959
     Withdrawn on 25/09/1961

SLS Allocations*
Type Code Name From Date
ALLOC HLD Hull Dairycoates w/e 17/09/1949
ALLOC YK York (North) w/e 10/12/1949
ALLOC 50B Neville Hill w/e 12/05/1951
ALLOC 50A York (North) 4w/e 28/11/1953
ALLOC 50B Neville Hill 4w/e 27/03/1954
ALLOC 50A York (North) 4w/e 14/08/1954
WDN   on 25/09/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
16/08/1923 Diagram 49 boiler fitted (number D1529)
07/03/1929 Diagram 49 boiler fitted (number D983)
07/02/1933 Steam Brakes fitted
07/02/1933 Diagram 49 boiler fitted (number D1556)
15/05/1936 Diagram 49 boiler fitted (number 2773)
13/09/1939 Diagram 49A boiler fitted (number 3035)
14/01/1943 Diagram 49A boiler fitted (number 3051)
22/08/1946 Diagram 49A boiler fitted (number 3035)
19/04/1950 Diagram 49A boiler fitted (number 3439)
09/05/1953 Diagram 49A boiler fitted (number 24077)
17/09/1955 Diagram 49 boiler fitted (number 24048)
11/07/1958 Diagram 49 boiler fitted (number 24065)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 08/03/1926 05/01/1927 304 days General    
Darlington Works 22/10/1928 01/12/1928 41 days Unclassified    
Gateshead Works 10/01/1929 07/03/1929 57 days General Small numberplate fitted to driving splashers
Boiler number D983 (Diagram 49)
 
Darlington Works 05/01/1933 07/02/1933 34 days General Boiler number D1556 (Diagram 49)
Steam Brakes fitted
 
Darlington Works 02/03/1936 15/05/1936 75 days General Boiler number 24063 (Diagram 49)
 
Darlington Works 29/10/1938 11/11/1938 14 days Unclassified    
Darlington Works 02/08/1939 13/09/1939 43 days General Boiler number 3035 (Diagram 49A)
 
Darlington Works 25/04/1940 25/04/1940 1 day Weighing    
Darlington Works 15/12/1942 14/01/1943 31 days General Boiler number 3051 (Diagram 49A)
 
Darlington Works 04/03/1943 18/03/1943 15 days Unclassified    
Gateshead Works 16/12/1944 17/01/1945 33 days Light Repair    
Darlington Works 02/07/1946 22/08/1946 52 days General Boiler number 3035 (Diagram 49A)
 
Darlington Works 29/08/1946 04/09/1946 7 days Unclassified    
Gateshead Works 20/11/1947 11/12/1947 22 days Light Repair    
Darlington Works 21/11/1949 26/11/1949 6 days Light Casual Renumbered to BR 61452
 
Darlington Works 02/02/1950 19/04/1950 77 days General Boiler number 3439 (Diagram 49A)
 
Darlington Works 08/04/1953 09/05/1953 32 days General Boiler number 24077 (Diagram 49A)
 
Darlington Works 10/08/1955 17/09/1955 39 days General Boiler number 24048 (Diagram 49)
 
Darlington Works 19/09/1955 20/09/1955 2 days Unclassified    
Darlington Works 12/06/1958 11/07/1958 30 days General Boiler number 24065 (Diagram 49)
 

Mentions ...
Report Date Title Report Source
14/01/1962 Darlington Works (Scrap Road) Erecting Shop: D11, D256/71, D3316, D4083-8, D5107/8/49/72-5, 12119/20, 43053/7, 60812/98, 61275, 61388, 61454, 63381, 63467, 65768/72, 67638, 69005, 78026, 80118, 90397, 90620. Stripping Shop: 43071, 65892, 80117. Outside Stripping Shop: 60835, 61161, 92202. Works Yard: D18, D5096, 43055, 46450, 60809/22, 60963, 64897, 65099, 65862/9, 67681, 67718, 68017/43, 92064, 92199. Crossing: D17, D270/3, D2173, D2247/65, D3140, D4082, D5113. Scrap Road: 61411-3/5/9/36/43/50-2/9/60, 64979, 65741/69, 67707/13/22/39/50/72/5, 68688/9, 68729 all intact. SLS/196203

Summary
Date Event Details Source See Also
16/08/1923 To Service To service as London and North Eastern Railway Number 2381
Built at Darlington Works, Works Number 1190
Allocated to Gateshead (GHD)
Diagram 49 boiler fitted
   
08/03/1926 Works Visit Works Visit - Gateshead Works (General) - Arr: 08/03/1926. Dep: 05/01/1927.    
22/10/1928 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 22/10/1928. Dep: 01/12/1928.    
10/01/1929 Works Visit Works Visit - Gateshead Works (General) - Arr: 10/01/1929. Dep: 07/03/1929.
Work undertaken:
Small numberplate fitted to driving splashers
Boiler number D983 (Diagram 49)
   
05/01/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 05/01/1933. Dep: 07/02/1933.
Work undertaken:
Boiler number D1556 (Diagram 49)
Steam Brakes fitted
   
02/03/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 02/03/1936. Dep: 15/05/1936.
Work undertaken:
Boiler number 24063 (Diagram 49)
   
29/06/1936 Allocation Reallocated to York (North) (YK)    
29/10/1938 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 29/10/1938. Dep: 11/11/1938.    
02/08/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 02/08/1939. Dep: 13/09/1939.
Work undertaken:
Boiler number 3035 (Diagram 49A)
   
25/04/1940 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 25/04/1940. Dep: 25/04/1940.    
15/12/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 15/12/1942. Dep: 14/01/1943.
Work undertaken:
Boiler number 3051 (Diagram 49A)
   
04/03/1943 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 04/03/1943. Dep: 18/03/1943.    
16/12/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 16/12/1944. Dep: 17/01/1945.    
17/02/1946 Renumbered Renumbered to 1452    
02/07/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 02/07/1946. Dep: 22/08/1946.
Work undertaken:
Boiler number 3035 (Diagram 49A)
   
29/08/1946 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 29/08/1946. Dep: 04/09/1946.    
20/11/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 20/11/1947. Dep: 11/12/1947.    
11/09/1949 Allocation Reallocated to Hull Dairycoates (HLD)    
17/09/1949 Allocation Reallocated to Hull Dairycoates (HLD)    
21/11/1949 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 21/11/1949. Dep: 26/11/1949.
Work undertaken:
Renumbered to BR 61452
   
04/12/1949 Allocation Reallocated to York (North) (YK)    
10/12/1949 Allocation Reallocated to York (North) (YK)    
02/02/1950 Works Visit Works Visit - Darlington Works (General) - Arr: 02/02/1950. Dep: 19/04/1950.
Work undertaken:
Boiler number 3439 (Diagram 49A)
   
06/05/1951 Allocation Reallocated to Neville Hill (50B)    
12/05/1951 Allocation Reallocated to Neville Hill (50B)    
08/04/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 08/04/1953. Dep: 09/05/1953.
Work undertaken:
Boiler number 24077 (Diagram 49A)
   
15/11/1953 Allocation Reallocated to York (North) (50A)    
14/03/1954 Allocation Reallocated to Neville Hill (50B)    
10/08/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 10/08/1955. Dep: 17/09/1955.
Work undertaken:
Boiler number 24048 (Diagram 49)
   
19/09/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 19/09/1955. Dep: 20/09/1955.    
12/06/1958 Works Visit Works Visit - Darlington Works (General) - Arr: 12/06/1958. Dep: 11/07/1958.
Work undertaken:
Boiler number 24065 (Diagram 49)
   
18/07/1959 Allocation Reallocated to York (North) (50A)    
25/09/1961 Withdrawn Condemned as 61452 from York (North) (50A)    
02/1962 Scrapped Broken up by Locomotive Works: Darlington    

prev prev