Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 11 Online
» 4330 Today
» 4163 Yesterday
» 17736 Week
» 70752 Month
» 190279 Year
» 3217132 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1384 on 01/01/1924
London and North Eastern Railway (1946) 1467   09/12/1946
British Railways (Interim) E1467   11/02/1948
British Railways 61467   19/03/1949

Locomotive Specifics
Designer V. Raven
Class B16
Company History NER/LNER
Rebuild History
ClassFrom
B16/101/01/1924
B16/3 (4-6-0)27/10/1944
Wheels 4-6-0
Builder Darlington Works
Works Number 1220
Fittings (as built)
Engine Brakes Westinghouse brake with Vacuum Ejector
To Service Mon 01/01/1924 to Tweedmouth (TWD)
Withdrawal Mon 08/06/1964 off Hull Dairycoates (50B)
Service Life 40 yrs, 5 mths , 7 dys

Disposal
Scrapping Mon 26/10/1964 at Drapers (Hull)

Notes
Notes Sold for scrap to A. Draper, Hull, 9/64. Cut up 26/10/64

Allocations
Code Subsequent Codes Name From Date
TWD   Tweedmouth (New) on 01/01/1924
YK   York (North) on 08/05/1924
HLD   Hull Dairycoates on 07/07/1925
YK   York (North) on 28/03/1943
50B   Hull Dairycoates on 02/12/1962
     Withdrawn on 08/06/1964

SLS Allocations*
Type Code Name From Date
ALLOC 50B Hull Dairycoates w/e 08/12/1962
WDN   on 08/06/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
01/01/1924 Diagram 49 boiler fitted (number D1592)
10/12/1930 Diagram 49 boiler fitted (number D1048)
25/09/1933 Diagram 49 boiler fitted (number D1218)
02/05/1936 Diagram 49 boiler fitted (number D1573)
09/06/1939 Diagram 49 boiler fitted (number D1623)
06/07/1942 Diagram 49 boiler fitted (number 2268)
27/10/1944 Diagram 49A boiler fitted (number 3505)
25/01/1947 Diagram 49A boiler fitted (number 3491)
11/08/1949 Diagram 49A boiler fitted (number 3966)
01/03/1952 Diagram 49A boiler fitted (number 24050)
08/05/1954 Diagram 49A boiler fitted (number 24037)
14/08/1956 Diagram 49A boiler fitted (number 24029)
29/07/1958 Diagram 49A boiler fitted (number 24074)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 23/04/1927 29/07/1927 98 days General    
Darlington Works 14/10/1930 10/12/1930 58 days General Boiler number D1048 (Diagram 49)
 
Darlington Works 12/10/1932 03/11/1932 23 days Unclassified    
Darlington Works 18/08/1933 25/09/1933 39 days General Boiler number D1218 (Diagram 49)
 
Darlington Works 14/01/1936 02/05/1936 110 days General Boiler number D1573 (Diagram 49)
 
Darlington Works 27/04/1939 09/06/1939 44 days General Boiler number D1623 (Diagram 49)
 
Darlington Works 10/06/1939 22/06/1939 13 days Unclassified    
Darlington Works 06/06/1942 06/07/1942 31 days General Boiler number 2268 (Diagram 49)
 
Darlington Works 25/08/1944 27/10/1944 64 days General Rebuilt to class B16/3
Boiler number 24029 (Diagram 49A)
 
Gateshead Works 14/01/1946 29/01/1946 16 days Light Repair    
Darlington Works 20/12/1946 25/01/1947 37 days General Boiler number 3491 (Diagram 49A)
 
Gateshead Works 21/01/1948 11/02/1948 22 days Light Repair Renumbered to BR (Interim) number E1467
 
Darlington Works 24/02/1949 19/03/1949 24 days Light Repair Renumbered to BR 61467
 
Darlington Works 01/07/1949 11/08/1949 42 days General Boiler number 3966 (Diagram 49A)
 
Darlington Works 01/02/1952 01/03/1952 30 days General Boiler number 24050 (Diagram 49A)
 
Darlington Works 03/03/1952 05/03/1952 3 days Unclassified    
Darlington Works 07/04/1954 08/05/1954 32 days General Boiler number 24037 (Diagram 49A)
 
Darlington Works 10/05/1954 13/05/1954 4 days Unclassified    
Darlington Works 28/06/1956 14/08/1956 48 days General Boiler number 24029 (Diagram 49A)
 
Darlington Works 03/03/1958 24/03/1958 22 days Light Casual    
Darlington Works 06/06/1958 29/07/1958 54 days General Boiler number 24074 (Diagram 49A)
 
Darlington Works 19/09/1960 19/09/1960 1 day Weighing    
Darlington Works 28/09/1961 27/10/1961 30 days General Boiler number 24039 (Diagram 49A)
 

Mentions ...
Report Date Title Report Source
08/10/1955 North Eastern Miscellany Class B16 engines have now appeared at sheds in the Newcastle-upon-Tyne area and the following have been noted working between Heaton and Berwick on various classes of trains: 61410/13/14/15/40/67/69. Class K2 2-6-0 locos noted en route between Newcastle and Cowlairs recently for overhaul and repainting have been Nos. 61720/27/62/65. Standard Class 5 4-6-0 73101 worked a Newcastle-Berwick passenger train on the 21st Sept. en route for the Scottish Region. Class J21 0-6-0 Nos. 65117 an 65070 were hauled dead by a Class J39 for the north on 4/10 and a class Dll 4-4-0 62684 hauled Class K1 62031 dead from Haymarket shed to Gateshead on October 5th. During mid-October, Class D49 4-4-0 Nos. 62752 an 62720 have been observed working a morning Sunderland-Newcastle slow passenger train as a running-in turn, both engines being recently ex-works. SLS/195512
26/08/1961 York South York south shed is now used for storage only-on 26th August the following were noted-47239/48, 61418/9/44/67, 68677/87, 69003/8/16. SLS/196110

Summary
Date Event Details Source See Also
01/01/1924 To Service To service as London and North Eastern Railway Number 1384
Built at Darlington Works, Works Number 1220
Allocated to Tweedmouth (TWD)
Diagram 49 boiler fitted
   
08/05/1924 Allocation Reallocated to York (North) (YK)    
07/07/1925 Allocation Reallocated to Hull Dairycoates (HLD)    
23/04/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 23/04/1927. Dep: 29/07/1927.    
14/10/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 14/10/1930. Dep: 10/12/1930.
Work undertaken:
Boiler number D1048 (Diagram 49)
   
12/10/1932 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 12/10/1932. Dep: 03/11/1932.    
18/08/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 18/08/1933. Dep: 25/09/1933.
Work undertaken:
Boiler number D1218 (Diagram 49)
   
14/01/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 14/01/1936. Dep: 02/05/1936.
Work undertaken:
Boiler number D1573 (Diagram 49)
   
27/04/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 27/04/1939. Dep: 09/06/1939.
Work undertaken:
Boiler number D1623 (Diagram 49)
   
10/06/1939 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 10/06/1939. Dep: 22/06/1939.    
06/06/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 06/06/1942. Dep: 06/07/1942.
Work undertaken:
Boiler number 2268 (Diagram 49)
   
28/03/1943 Allocation Reallocated to York (North) (YK)    
25/08/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 25/08/1944. Dep: 27/10/1944.
Work undertaken:
Rebuilt to class B16/3
Boiler number 24029 (Diagram 49A)
   
14/01/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 14/01/1946. Dep: 29/01/1946.    
09/12/1946 Renumbered Renumbered to 1467    
20/12/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 20/12/1946. Dep: 25/01/1947.
Work undertaken:
Boiler number 3491 (Diagram 49A)
   
21/01/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 21/01/1948. Dep: 11/02/1948.
Work undertaken:
Renumbered to BR (Interim) number E1467
   
24/02/1949 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 24/02/1949. Dep: 19/03/1949.
Work undertaken:
Renumbered to BR 61467
   
01/07/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1949. Dep: 11/08/1949.
Work undertaken:
Boiler number 3966 (Diagram 49A)
   
01/02/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 01/02/1952. Dep: 01/03/1952.
Work undertaken:
Boiler number 24050 (Diagram 49A)
   
03/03/1952 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 03/03/1952. Dep: 05/03/1952.    
07/04/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 07/04/1954. Dep: 08/05/1954.
Work undertaken:
Boiler number 24037 (Diagram 49A)
   
10/05/1954 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 10/05/1954. Dep: 13/05/1954.    
28/06/1956 Works Visit Works Visit - Darlington Works (General) - Arr: 28/06/1956. Dep: 14/08/1956.
Work undertaken:
Boiler number 24029 (Diagram 49A)
   
03/03/1958 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 03/03/1958. Dep: 24/03/1958.    
06/06/1958 Works Visit Works Visit - Darlington Works (General) - Arr: 06/06/1958. Dep: 29/07/1958.
Work undertaken:
Boiler number 24074 (Diagram 49A)
   
19/09/1960 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 19/09/1960. Dep: 19/09/1960.    
28/09/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 28/09/1961. Dep: 27/10/1961.
Work undertaken:
Boiler number 24039 (Diagram 49A)
   
02/12/1962 Allocation Reallocated to Hull Dairycoates (50B)    
08/06/1964 Withdrawn Condemned as 61467 from Hull Dairycoates (50B)    
26/10/1964 Scrapped Broken up by Drapers: Hull    

prev prev