Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 384 Today
» 4469 Yesterday
» 14427 Week
» 79381 Month
» 282045 Year
» 3308898 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Northern Railway 293   05/1905
London and North Eastern Railway (1924 Tmp) 293N   11/08/1923
London and North Eastern Railway (1924) 3293   20/09/1924
London and North Eastern Railway (1946) 2821   29/11/1946

Locomotive Specifics
Designer H. Ivatt
Class C1
Company History GNR/LNER
Wheels 4-4-2
Builder Doncaster Works
Order Number 240
Works Number 1067
To Service During 05/1905
Withdrawal Fri 02/07/1948
Service Life 43 yrs, 2 mths , 2 dys

Disposal
Scrapping Locomotive Works (Doncaster)

Notes
Notes Carried out Stationery Boiler duties at Doncaster Carriage Works from 7/48 to 8/50

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 05/1905
NWE   New England on 11/06/1925
KX   Kings Cross on 05/05/1946
NWE   New England w/e 22/01/1947
KX   Kings Cross on 01/02/1947
     Withdrawn on 02/07/1948

SLS Allocations*
Type Code Name From Date
ALLOC NWE New England on 22/01/1947
ALLOC KX Kings Cross on 01/02/1947
WDN KX Kings Cross on 02/07/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced

Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 1910 08/1910   General    
Doncaster Works 1914 05/1914   General    
Doncaster Works 1919 10/1919   General Superheated boiler fitted
 
Doncaster Works 08/03/1922 01/07/1922 116 days General    
Doncaster Works 04/06/1923 11/08/1923 69 days General Renumbered to LNER (1924 Tmp) number 293N
 
Doncaster Works 06/06/1924 20/09/1924 107 days General Renumbered to LNER (1924) number 3293
 
Doncaster Works 04/01/1926 08/07/1926 186 days General    
Doncaster Works 14/03/1928 16/06/1928 95 days General    
Doncaster Works 03/05/1930 12/07/1930 71 days General    
Doncaster Works 10/12/1932 21/01/1933 43 days General    
Doncaster Works 08/12/1934 12/01/1935 36 days General    
Doncaster Works 11/01/1936 25/01/1936 15 days Light Repair    
Doncaster Works 13/02/1937 13/03/1937 29 days General    
Doncaster Works 29/04/1939 17/06/1939 50 days General    
Doncaster Works 28/06/1941 02/08/1941 36 days General    
Doncaster Works 06/11/1943 04/12/1943 29 days General    
Doncaster Works 17/11/1945 21/12/1945 35 days General    
Doncaster Works 23/02/1946 02/03/1946 8 days Light Repair ATC gear fitted
 
Doncaster Works 27/04/1948 27/04/1948 1 day No repairs    

Mentions ...
Report Date Title Report Source
26/06/1948 Doncaster Works Locomotives in Works on 26/6 included; Nos. 1, 29, 30/6/9, 65/7, 104, 518, 818/83, 1083, 1128, 1800/24, 2821, 60042/49/97, 60515, 60870, 61830. The first of the new 'A.1' 4-6-2's No. 60114, was nearing completion here in early July and was being proceeded with faster than No. 60539. SLS/194808
08/10/1948 Doncaster Works Locomotives noted ready to leave Works were Nos. 60007, painted garter blue; 60516, green; 61120, black and lined, while 60877, 60961, 61804 an 63479 were plain black. Locomotives awaiting Works included:-Nos. 48, 1121 an 1902 while those under heavy repair included Nos. 8, 18, 19. 37, 78, 98, 513/19, 932/62, 1092, 1107/24, 1869, 2116, 7350 an 9999. Condemned locomotives on the dump were:-Nos. 2126/98 an 4107. Withdrawn 'C.1' Class Nos. 3274 an 3285, fitted with tall chimneys, extra- coal space, etc., were noted supplying steam to the Crimpsall Erecting Shop; it also appeared that Nos. 2821 (3293) and 4419 might also be similarly fitted and soon put to a similar use where required. It is understood that sixteen of the new 'A.1's' are to be built at Doncaster and twenty-three at Darlington. SLS/194812

Summary
Date Event Details Source See Also
05/1905 To Service To service as Great Northern Railway Number 293
Built at Doncaster Works, Works Number 1067
   
1910 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1910. Dep: ?/08/1910.    
1914 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1914. Dep: ?/05/1914.    
1919 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1919. Dep: ?/10/1919.
Work undertaken:
Superheated boiler fitted
   
08/03/1922 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/03/1922. Dep: 01/07/1922.    
04/06/1923 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/06/1923. Dep: 11/08/1923.
Work undertaken:
Renumbered to LNER (1924 Tmp) number 293N
   
06/06/1924 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/06/1924. Dep: 20/09/1924.
Work undertaken:
Renumbered to LNER (1924) number 3293
   
11/06/1925 Allocation Reallocated to New England (NWE)    
04/01/1926 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/01/1926. Dep: 08/07/1926.    
14/03/1928 Works Visit Works Visit - Doncaster Works (General) - Arr: 14/03/1928. Dep: 16/06/1928.    
03/05/1930 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/05/1930. Dep: 12/07/1930.    
10/12/1932 Works Visit Works Visit - Doncaster Works (General) - Arr: 10/12/1932. Dep: 21/01/1933.    
08/12/1934 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/12/1934. Dep: 12/01/1935.    
11/01/1936 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 11/01/1936. Dep: 25/01/1936.    
13/02/1937 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/02/1937. Dep: 13/03/1937.    
29/04/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/04/1939. Dep: 17/06/1939.    
28/06/1941 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/06/1941. Dep: 02/08/1941.    
06/11/1943 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/11/1943. Dep: 04/12/1943.    
17/11/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/11/1945. Dep: 21/12/1945.    
23/02/1946 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 23/02/1946. Dep: 02/03/1946.
Work undertaken:
ATC gear fitted
   
05/05/1946 Allocation Reallocated to Kings Cross (KX)    
29/11/1946 Renumbered Renumbered to 2821    
22/01/1947 Allocation Reallocated to New England (NWE)    
01/02/1947 Allocation Reallocated to Kings Cross (KX)    
27/04/1948 Works Visit Works Visit - Doncaster Works (No repairs) - Arr: 27/04/1948. Dep: 27/04/1948.    
02/07/1948 Withdrawn Condemned as 2821    

prev prev