Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 1458 Today
» 4397 Yesterday
» 19261 Week
» 72277 Month
» 191804 Year
» 3218657 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Eastern Railway 1809 m/e 11/1910
London and North Eastern Railway (1924) 8809 y/e 1924
London and North Eastern Railway (1942) 7679 y/e Not applied
London and North Eastern Railway (1946) 2600 m/e 09/1946
British Railways 62600 m/e Not applied

Locomotive Specifics
Designer J. Holden
Class D15
Company History GER/LNER
Rebuild History
ClassFrom
Claud Hamilton11/1910
D16/3 (4-4-0)06/1933
Wheels 4-4-0
Builder Stratford Works
Order Number P67
Fittings (as built)
Engine Brakes Westinghouse
To Service During 11/1910
Withdrawal Sat 12/06/1948 off Inverness (32A)
Service Life 37 yrs, 7 mths , 12 dys

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 11/1910
NOR   Norwich Thorpe on 01/01/1948 (Snapshot)
     Withdrawn on 12/06/1948

SLS Allocations*
Type Code Name From Date
ALLOC NOR Norwich Thorpe on 09/08/1947
ALLOC LOW Lowestoft w/e 18/10/1947
ALLOC NOR Norwich Thorpe w/e 22/11/1947
WDN NOR Norwich Thorpe on 12/06/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
07/1929 Vacuum Ejector fitted
07/1929 Diagram 27Sup boiler fitted (Belpaire firebox)
06/1933 8" Piston Valves fitted
06/1933 Decorative Valance over driving wheels removed
06/1933 Superheated LNER Diagram 28A (1933) boiler fitted
06/1933 Diagram 28A (1933) boiler fitted (Round Top firebox)


Summary
Date Event Details Source See Also
11/1910 To Service To service as Great Eastern Railway Number 1809
Built at Stratford Works
Diagram 28 boiler fitted
   
1924 Renumbered Renumbered to 8809    
07/1929 Modification Diagram 27Sup boiler fitted    
07/1929 Modification Modification: Vacuum Ejector fitted    
06/1933 Modification Diagram 28A (1933) boiler fitted    
06/1933 Modification Modification: 8" Piston Valves fitted    
06/1933 Modification Modification: Decorative Valance over driving wheels removed    
06/1933 Modification Modification: Superheated LNER Diagram 28A (1933) boiler fitted    
1942 Number Allocated Allocated number 7679 but not taken up    
09/1946 Renumbered Renumbered to 2600    
01/01/1948 Allocation Allocation Snapshot - Norwich Thorpe (NOR)    
12/06/1948 Withdrawn Condemned as 2600 from Inverness (32A)    
1949 Number Allocated Allocated number 62600 but not taken up    

prev prev