Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 7 Online
» 184 Today
» 4397 Yesterday
» 17987 Week
» 71003 Month
» 190530 Year
» 3217383 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2714 on 22/11/1928
London and North Eastern Railway (1946) 4767   13/11/1946
British Railways (BR Tmp) E4767   05/02/1948
British Railways 64767   31/07/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1428
Fittings (as built)
Engine Brakes Westinghouse brake with Vacuum Ejector
To Service Fri 22/11/1928 to York (North) (YK)
Withdrawal Fri 13/01/1961 off Stratford (30A)
Service Life 32 yrs, 1 mth , 22 dys

Disposal
Scrapping During 06/1961

Notes
Notes Cut up at Stratford

Allocations
Code Subsequent Codes Name From Date
STR   Stratford on 14/01/1905
YK   York (North) (New) on 22/11/1928
STR   Stratford on 03/12/1928
COL   Colchester on 25/09/1939
STR   Stratford on 03/12/1939
PKS   Parkeston Quay on 02/11/1941
STR   Stratford on 16/11/1941
ARD   Ardsley on 15/05/1949
ARD   Ardsley w/e 21/05/1949
STR   Stratford w/e 24/09/1949
STR   Stratford on 28/09/1949
32B   Ipswich on 15/10/1950
32B   Ipswich w/e 16/10/1950
30A   Stratford m/e 31/01/1951
     Withdrawn on 13/01/1961

SLS Allocations*
Type Code Name From Date
ALLOC ARD Ardsley w/e 21/05/1949
ALLOC STR Stratford w/e 24/09/1949
ALLOC 32B Ipswich w/e 16/10/1950
ALLOC 30A Stratford m/e 31/01/1951
WDN   on 13/01/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/11/1928 Diagram 97 boiler fitted (number 2132)
26/08/1933 Diagram 97 boiler fitted (number 2104)
27/11/1935 Diagram 97 boiler fitted (number RS120)
04/06/1938 Diagram 97 boiler fitted
15/12/1940 Diagram 97 boiler fitted (number 8023)
07/04/1944 Diagram 97 boiler fitted (number 826)
25/02/1952 Diagram 97 boiler fitted (number 27809)
11/03/1955 Diagram 97 boiler fitted (number 27707)
03/04/1958 Diagram 97 boiler fitted (number 27724)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 02/03/1931 04/04/1931 34 days General    
Gorton Works 01/08/1933 26/08/1933 26 days General Boiler number 2104 (Diagram 97)
 
Darlington Works 18/10/1935 27/11/1935 41 days General Boiler number 27730 (Diagram 97)
 
Gorton Works 10/05/1938 04/06/1938 26 days General Boiler number 1912 (Diagram 97)
 
Gorton Works 27/10/1940 15/12/1940 50 days General Boiler number 8023 (Diagram 97)
 
Stratford Works 03/03/1944 07/04/1944 36 days General Boiler number 826 (Diagram 97)
 
Stratford Works 21/10/1947 05/02/1948 108 days General Renumbered to BR (BR Tmp) number E4767
 
Stratford Works 15/05/1948 31/07/1948 78 days Light Repair Renumbered to BR 64767
 
Derby Works 10/01/1952 25/02/1952 47 days General Boiler number 27809 (Diagram 97)
 
Stratford Works 31/01/1955 11/03/1955 40 days General Boiler number 2186 (Diagram 97)
 
Stratford Works 03/02/1958 03/04/1958 60 days General Boiler number 27724 (Diagram 97)
 

Mentions ...
Report Date Title Report Source
18/03/1961 Stratford Works (Scrap Yard) Old Works: D2202/3/16, D2950, D3496, 11157, 12132. Scrap Yard: 64698, 64767, 67726, 69681, 69721. Works Yard: D2214, D5047/94, D8405, 62015, 69656, 69702. Diesel Erecting Shop: D200/48, D5036/59/60/6/95, D5630/6/66, D5901/4, D8206, D8403/6. Erecting Shop Yard: D2575, D5040/1, D5903, DEPT33/44/5. Works Shunters: D2209/17, D2958, 12111. SLS/196105

Summary
Date Event Details Source See Also
14/01/1905 Allocation Reallocated to Stratford (STR)    
22/11/1928 To Service To service as London and North Eastern Railway Number 2714
Built at Darlington Works, Works Number 1428
Allocated to York (North) (YK)
Diagram 97 boiler fitted
   
03/12/1928 Allocation Reallocated to Stratford (STR)    
02/03/1931 Works Visit Works Visit - Gorton Works (General) - Arr: 02/03/1931. Dep: 04/04/1931.    
01/08/1933 Works Visit Works Visit - Gorton Works (General) - Arr: 01/08/1933. Dep: 26/08/1933.
Work undertaken:
Boiler number 2104 (Diagram 97)
   
18/10/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 18/10/1935. Dep: 27/11/1935.
Work undertaken:
Boiler number 27730 (Diagram 97)
   
10/05/1938 Works Visit Works Visit - Gorton Works (General) - Arr: 10/05/1938. Dep: 04/06/1938.
Work undertaken:
Boiler number 1912 (Diagram 97)
   
25/09/1939 Allocation Reallocated to Colchester (COL)    
03/12/1939 Allocation Reallocated to Stratford (STR)    
27/10/1940 Works Visit Works Visit - Gorton Works (General) - Arr: 27/10/1940. Dep: 15/12/1940.
Work undertaken:
Boiler number 8023 (Diagram 97)
   
02/11/1941 Allocation Reallocated to Parkeston Quay (PKS)    
16/11/1941 Allocation Reallocated to Stratford (STR)    
03/03/1944 Works Visit Works Visit - Stratford Works (General) - Arr: 03/03/1944. Dep: 07/04/1944.
Work undertaken:
Boiler number 826 (Diagram 97)
   
13/11/1946 Renumbered Renumbered to 4767    
21/10/1947 Works Visit Works Visit - Stratford Works (General) - Arr: 21/10/1947. Dep: 05/02/1948.
Work undertaken:
Renumbered to BR (BR Tmp) number E4767
   
15/05/1948 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 15/05/1948. Dep: 31/07/1948.
Work undertaken:
Renumbered to BR 64767
   
15/05/1949 Allocation Reallocated to Ardsley (ARD)    
21/05/1949 Allocation Reallocated to Ardsley (ARD)    
24/09/1949 Allocation Reallocated to Stratford (STR)    
28/09/1949 Allocation Reallocated to Stratford (STR)    
15/10/1950 Allocation Reallocated to Ipswich (32B)    
16/10/1950 Allocation Reallocated to Ipswich (32B)    
31/01/1951 Allocation Reallocated to Stratford (30A)    
10/01/1952 Works Visit Works Visit - Derby Works (General) - Arr: 10/01/1952. Dep: 25/02/1952.
Work undertaken:
Boiler number 27809 (Diagram 97)
   
31/01/1955 Works Visit Works Visit - Stratford Works (General) - Arr: 31/01/1955. Dep: 11/03/1955.
Work undertaken:
Boiler number 2186 (Diagram 97)
   
03/02/1958 Works Visit Works Visit - Stratford Works (General) - Arr: 03/02/1958. Dep: 03/04/1958.
Work undertaken:
Boiler number 27724 (Diagram 97)
   
13/01/1961 Withdrawn Condemned as 64767 from Stratford (30A)    
06/1961 Scrapped Scrapped    

prev prev