Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 14 Online
» 788 Today
» 4163 Yesterday
» 14194 Week
» 67210 Month
» 186737 Year
» 3213590 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2772 on 11/09/1929
London and North Eastern Railway (1946) 4798   31/10/1946
British Railways 64798   04/12/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1469
Fittings (as built)
Engine Brakes Steam Brake with Vacuum Ejector
To Service Sat 11/09/1929 to York (North) (YK)
Withdrawal w/e Sat 15/09/1962 off Annesley (16D)
Service Life 33 yrs , 4 dys

Disposal
Scrapping During 11/1962

Notes
Notes Cut up at Gorton

Allocations
Code Subsequent Codes Name From Date
YK   York (North) (New) on 11/09/1929
IPS   Ipswich on 18/09/1929
STR   Stratford on 09/05/1932
PKS   Parkeston Quay on 21/08/1938
STR   Stratford on 26/03/1939
MAR   March on 20/10/1939
STR   Stratford on 28/05/1943
NOR   Norwich Thorpe on 13/09/1944
YAR   Yarmouth South Town on 09/10/1946
NOR   Norwich Thorpe on 10/12/1946
YAR   Yarmouth South Town on 12/10/1947
NOR   Norwich Thorpe on 12/11/1947
38E   Woodford Halse on 16/04/1950
38A   Colwick on 08/10/1950
38B   Annesley on 03/11/1957
     Withdrawn w/e 15/09/1962

SLS Allocations*
Type Code Name From Date
ALLOC YAR Yarmouth South Town w/e 12/10/1946
ALLOC NOR Norwich Thorpe on 10/12/1946
ALLOC YAR Yarmouth South Town w/e 18/10/1947
ALLOC NOR Norwich Thorpe w/e 15/11/1947
ALLOC 38E Woodford Halse w/e 16/04/1950
ALLOC 38A Colwick w/e 08/10/1950
ALLOC 38B Annesley 4w/e 30/11/1957
LOAN 16D Annesley on 01/02/1958
ALLOC 16D Annesley on 23/02/1958
TOSTORE   4w/e 21/03/1959
WDN   w/e 15/09/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
11/09/1929 Diagram 97 boiler fitted (number 2273)
09/04/1932 Diagram 97 boiler fitted (number 2193)
18/10/1934 Diagram 97 boiler fitted (number 2203)
19/12/1936 Diagram 97 boiler fitted (number 8016)
11/02/1939 Diagram 97 boiler fitted (number 2184)
22/01/1944 Diagram 97 boiler fitted (number E1355)
28/08/1946 Diagram 97 boiler fitted (number 2317)
04/12/1948 Diagram 97 boiler fitted (number 8592)
10/11/1950 Diagram 97 boiler fitted (number 2309)
16/05/1953 Diagram 97 boiler fitted (number 27755)
22/11/1958 Diagram 97 boiler fitted (number 27837)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 14/03/1932 09/04/1932 27 days General Boiler number 2193 (Diagram 97)
 
Gorton Works 03/10/1934 18/10/1934 16 days General Boiler number 2203 (Diagram 97)
 
Gorton Works 26/11/1936 19/12/1936 24 days General Boiler number 8016 (Diagram 97)
 
Gorton Works 13/01/1939 11/02/1939 30 days General Boiler number 2184 (Diagram 97)
 
Gorton Works 07/01/1940 16/03/1940 70 days General    
Doncaster Works 08/06/1941 14/08/1941 68 days General    
Stratford Works 05/12/1943 22/01/1944 49 days General Boiler number E1355 (Diagram 97)
 
Stratford Works 13/07/1945 20/08/1945 39 days Light Repair    
Stratford Works 21/04/1946 28/08/1946 130 days General Boiler number 2317 (Diagram 97)
 
Stratford Works 01/06/1947 29/07/1947 59 days Light Repair    
Gorton Works 03/10/1948 04/12/1948 63 days General Boiler number 8592 (Diagram 97)
Renumbered to BR 64798
 
Gorton Works 04/02/1949 23/04/1949 79 days Heavy Casual    
Derby Works 29/08/1950 10/11/1950 74 days General Boiler number 2309 (Diagram 97)
 
Gorton Works 07/04/1953 16/05/1953 40 days General Boiler number 27755 (Diagram 97)
 
Gorton Works 15/02/1956 24/03/1956 39 days General Boiler number 27727 (Diagram 97)
 
Gorton Works 20/10/1958 22/11/1958 34 days General Boiler number 27837 (Diagram 97)
 

Mentions ...
Report Date Title Report Source
15/09/1950 Derby Works For works during first half of September: 40653 4B, 41050/9 14B, 41065 23C, 41118 8E, 42325 14B, 42533 33A, 43754 22B, 43959 18C, 43968 and M4010 21A, 44164 an 44402 17A, 44174 17D, 7588 5C, 7635 22B, 58137 16C, 64883 40A, 40410 35C, 41062 19B, 41068 20A, 1251 (58034) 22B, 42339 16A, 42344 5D, 42345 5C, 43246 an 43435 21A, 43344 22B, 3650 18A, 43819 18A, 43925 20D, 44180 17C, 44355 22A, 7481 87K, 22945 (58136) 20B, 58237 20C, 64757 38A, 64959 32A, 40001 11A, 40351 20A, 426 17A, 41001 22B, 41004 20E, 41006 15C, 41067 20E, 41095 15C, 41154 9E, 1429 (58090) 20C, 42364 5D, 42509 33C, 42512 33C, 3456 20A, 3914 18D, 44598 16A, 47548 19A, 58209 19B, 64798 38E.
New Construction: No. 42050 was ex Paint Shop on 6/9, and others up to 42057 were in various stages in the Erecting Shop. Diesels 12074/5 were completed and others up to 12079 in course of construction. No. 42146 was on trials on 6/9. Nos. 404, 40411/6 have gone into traffic ex store, but Nos. 407, 40513, 43342/64, 43482 are in store, near the station.
Withdrawn: still in works Yard: 40498, 40515, 41017, 43297, 43818, 22853 (58112), 3511 (58275), 1251 (58034) and 1406 (58079). No. 41748 is ex Works, with round-top firebox. No. 58080 (0-4-4T) has appeared fully lined, with emblem. Among those repainted black with emblem are 2108 (0-6-OPT), and J.39 Nos. 64762/5/84/97, 64903/62/9, while 64906/51 still retain BRITISH RAILWAYS (not repainted).
SLS/195012

Summary
Date Event Details Source See Also
11/09/1929 To Service To service as London and North Eastern Railway Number 2772
Built at Darlington Works, Works Number 1469
Allocated to York (North) (YK)
Diagram 97 boiler fitted
   
18/09/1929 Allocation Reallocated to Ipswich (IPS)    
14/03/1932 Works Visit Works Visit - Gorton Works (General) - Arr: 14/03/1932. Dep: 09/04/1932.
Work undertaken:
Boiler number 2193 (Diagram 97)
   
09/05/1932 Allocation Reallocated to Stratford (STR)    
03/10/1934 Works Visit Works Visit - Gorton Works (General) - Arr: 03/10/1934. Dep: 18/10/1934.
Work undertaken:
Boiler number 2203 (Diagram 97)
   
26/11/1936 Works Visit Works Visit - Gorton Works (General) - Arr: 26/11/1936. Dep: 19/12/1936.
Work undertaken:
Boiler number 8016 (Diagram 97)
   
21/08/1938 Allocation Reallocated to Parkeston Quay (PKS)    
13/01/1939 Works Visit Works Visit - Gorton Works (General) - Arr: 13/01/1939. Dep: 11/02/1939.
Work undertaken:
Boiler number 2184 (Diagram 97)
   
26/03/1939 Allocation Reallocated to Stratford (STR)    
20/10/1939 Allocation Reallocated to March (MAR)    
07/01/1940 Works Visit Works Visit - Gorton Works (General) - Arr: 07/01/1940. Dep: 16/03/1940.    
08/06/1941 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/06/1941. Dep: 14/08/1941.    
28/05/1943 Allocation Reallocated to Stratford (STR)    
05/12/1943 Works Visit Works Visit - Stratford Works (General) - Arr: 05/12/1943. Dep: 22/01/1944.
Work undertaken:
Boiler number E1355 (Diagram 97)
   
13/09/1944 Allocation Reallocated to Norwich Thorpe (NOR)    
13/07/1945 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 13/07/1945. Dep: 20/08/1945.    
21/04/1946 Works Visit Works Visit - Stratford Works (General) - Arr: 21/04/1946. Dep: 28/08/1946.
Work undertaken:
Boiler number 2317 (Diagram 97)
   
09/10/1946 Allocation Reallocated to Yarmouth South Town (YAR)    
31/10/1946 Renumbered Renumbered to 4798    
10/12/1946 Allocation Reallocated to Norwich Thorpe (NOR)    
01/06/1947 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 01/06/1947. Dep: 29/07/1947.    
12/10/1947 Allocation Reallocated to Yarmouth South Town (YAR)    
12/11/1947 Allocation Reallocated to Norwich Thorpe (NOR)    
03/10/1948 Works Visit Works Visit - Gorton Works (General) - Arr: 03/10/1948. Dep: 04/12/1948.
Work undertaken:
Boiler number 8592 (Diagram 97)
Renumbered to BR 64798
   
04/02/1949 Works Visit Works Visit - Gorton Works (Heavy Casual) - Arr: 04/02/1949. Dep: 23/04/1949.    
16/04/1950 Allocation Reallocated to Woodford Halse (38E)    
29/08/1950 Works Visit Works Visit - Derby Works (General) - Arr: 29/08/1950. Dep: 10/11/1950.
Work undertaken:
Boiler number 2309 (Diagram 97)
   
08/10/1950 Allocation Reallocated to Colwick (38A)    
07/04/1953 Works Visit Works Visit - Gorton Works (General) - Arr: 07/04/1953. Dep: 16/05/1953.
Work undertaken:
Boiler number 27755 (Diagram 97)
   
15/02/1956 Works Visit Works Visit - Gorton Works (General) - Arr: 15/02/1956. Dep: 24/03/1956.
Work undertaken:
Boiler number 27727 (Diagram 97)
   
03/11/1957 Allocation Reallocated to Annesley (38B)    
20/10/1958 Works Visit Works Visit - Gorton Works (General) - Arr: 20/10/1958. Dep: 22/11/1958.
Work undertaken:
Boiler number 27837 (Diagram 97)
   
15/09/1962 Withdrawn Condemned as 64798 from Annesley (16D)    
11/1962 Scrapped Scrapped    

prev prev