Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 2735 Today
» 4163 Yesterday
» 16141 Week
» 69157 Month
» 188684 Year
» 3215537 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1412 on 15/03/1934
London and North Eastern Railway (1946) 4848   31/05/1946
British Railways 64848   23/10/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1577
Fittings (as built)
Engine Brakes Steam Brake with Vacuum Ejector
To Service Mon 15/03/1934 to Newport (Teeside) (NPT)
Withdrawal Mon 03/12/1962 off West Auckland (51F)
Service Life 28 yrs, 8 mths , 18 dys

Disposal
Scrapping During 01/1963

Notes
Notes Cut up at Darlington

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) on 15/03/1934
DAR   Darlington on 28/03/1943
SBK   Starbeck on 08/07/1943
DAR   Darlington on 14/01/1946
AUK   West Auckland on 04/01/1948
AUK   West Auckland w/e 10/01/1948
51D   Middlesbrough on 29/08/1954
51F   West Auckland on 06/03/1955
51D   Middlesbrough on 03/04/1955
51F   West Auckland on 26/06/1955
     Withdrawn on 03/12/1962

SLS Allocations*
Type Code Name From Date
ALLOC AUK West Auckland w/e 10/01/1948
ALLOC 51D Middlesbrough 4w/e 11/09/1954
ALLOC 51F West Auckland 4w/e 26/03/1955
ALLOC 51D Middlesbrough 4w/e 23/04/1955
ALLOC 51F West Auckland 4w/e 16/07/1955
WDN   on 03/12/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
15/03/1934 Diagram 17Sat boiler fitted (number 3077/20D)
01/10/1937 Diagram 97 boiler fitted (number RS119)
13/10/1939 Diagram 97 boiler fitted (number 1919)
01/06/1946 Diagram 97 boiler fitted (number 1907)
23/10/1948 Diagram 97 boiler fitted (number 4909)
31/10/1953 Diagram 97 boiler fitted (number 27524)
03/12/1960 Diagram 97 boiler fitted (number 27428)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Cowlairs Works 1 day l/53    
Darlington Works 11/04/1934 14/04/1934 4 days Unclassified Water scoop fitted
 
Darlington Works 18/10/1935 27/11/1935 41 days General    
Darlington Works 20/08/1937 01/10/1937 43 days General Boiler number RS119 (Diagram 97)
 
Darlington Works 12/09/1939 13/10/1939 32 days General Boiler number 1919 (Diagram 97)
 
Darlington Works 06/10/1941 22/11/1941 48 days General Boiler number 27485 (Diagram 97)
 
Cowlairs Works 26/05/1944 24/06/1944 30 days General    
Cowlairs Works 11/05/1946 01/06/1946 22 days General Boiler number 1907 (Diagram 97)
Renumbered to LNER (1946) number 4848
 
Gateshead Works 09/12/1947 08/01/1948 31 days Light Repair    
Cowlairs Works 23/09/1948 23/10/1948 31 days General Boiler number 27546 (Diagram 97)
Renumbered to BR 64848
 
Cowlairs Works 13/06/1951 07/07/1951 25 days Light Intermediate    
Cowlairs Works 02/10/1953 31/10/1953 30 days General Boiler number 27524 (Diagram 97)
 
Cowlairs Works 11/02/1954 20/02/1954 10 days Unclassified    
Cowlairs Works 23/08/1956 22/09/1956 31 days Heavy Intermediate    
Darlington Works 01/01/1957 11/02/1957 42 days Light Casual    
Cowlairs Works 03/01/1960 03/12/1960 336 days General Boiler number 27428 (Diagram 97)
 
Darlington Works 31/10/1961 1 day Light Casual    
Cowlairs Works 04/01/1962 09/02/1962 37 days Light Casual    

Mentions ...
Report Date Title Report Source
14/07/1962 Darlington MPD (Awaiting Works) Stored: 43070 (51L), 43101 (51L), 65768, 65772, 65773, 69002 (51A), 78015 (51J). Ex Works: 43014 (50A), 43125 (50B), 60834 (62B), 60944 (52B), 60973 (63A), 62004 (51A), 63389 (51L), 68043 (51A), 90011 (51A), 90273 (51L), 90430 (51A), 92098 (52H). Awaiting Works: 42639 (50F), 43134 (66D), 46494 (31A), 60818 (64A), 64706 (52G), 64713, 64730 (51L), 64757 (51L), 64758 (51L), 64821 (51L), 64835 (51F), 64848 (51F), 64982 (51F), 65670, 65761, 65776. Visitors : D12 (55H), 42553 (50A), 60040 (52A). SLS/196209

Summary
Date Event Details Source See Also
0000 Works Visit      
15/03/1934 To Service To service as London and North Eastern Railway Number 1412
Built at Darlington Works, Works Number 1577
Allocated to Newport (Teeside) (NPT)
Diagram 17Sat boiler fitted
   
11/04/1934 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 11/04/1934. Dep: 14/04/1934.
Work undertaken:
Water scoop fitted
   
18/10/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 18/10/1935. Dep: 27/11/1935.    
20/08/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 20/08/1937. Dep: 01/10/1937.
Work undertaken:
Boiler number RS119 (Diagram 97)
   
12/09/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 12/09/1939. Dep: 13/10/1939.
Work undertaken:
Boiler number 1919 (Diagram 97)
   
06/10/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 06/10/1941. Dep: 22/11/1941.
Work undertaken:
Boiler number 27485 (Diagram 97)
   
28/03/1943 Allocation Reallocated to Darlington (DAR)    
08/07/1943 Allocation Reallocated to Starbeck (SBK)    
26/05/1944 Works Visit Works Visit - Cowlairs Works (General) - Arr: 26/05/1944. Dep: 24/06/1944.    
14/01/1946 Allocation Reallocated to Darlington (DAR)    
11/05/1946 Works Visit Works Visit - Cowlairs Works (General) - Arr: 11/05/1946. Dep: 01/06/1946.
Work undertaken:
Boiler number 1907 (Diagram 97)
Renumbered to LNER (1946) number 4848
   
09/12/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 09/12/1947. Dep: 08/01/1948.    
04/01/1948 Allocation Reallocated to West Auckland (AUK)    
10/01/1948 Allocation Reallocated to West Auckland (AUK)    
23/09/1948 Works Visit Works Visit - Cowlairs Works (General) - Arr: 23/09/1948. Dep: 23/10/1948.
Work undertaken:
Boiler number 27546 (Diagram 97)
Renumbered to BR 64848
   
13/06/1951 Works Visit Works Visit - Cowlairs Works (Light Intermediate) - Arr: 13/06/1951. Dep: 07/07/1951.    
02/10/1953 Works Visit Works Visit - Cowlairs Works (General) - Arr: 02/10/1953. Dep: 31/10/1953.
Work undertaken:
Boiler number 27524 (Diagram 97)
   
11/02/1954 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 11/02/1954. Dep: 20/02/1954.    
29/08/1954 Allocation Reallocated to Middlesbrough (51D)    
06/03/1955 Allocation Reallocated to West Auckland (51F)    
03/04/1955 Allocation Reallocated to Middlesbrough (51D)    
26/06/1955 Allocation Reallocated to West Auckland (51F)    
23/08/1956 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 23/08/1956. Dep: 22/09/1956.    
01/01/1957 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 01/01/1957. Dep: 11/02/1957.    
03/01/1960 Works Visit Works Visit - Cowlairs Works (General) - Arr: 03/01/1960. Dep: 03/12/1960.
Work undertaken:
Boiler number 27428 (Diagram 97)
   
31/10/1961 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 31/10/1961.    
04/01/1962 Works Visit Works Visit - Cowlairs Works (Light Casual) - Arr: 04/01/1962. Dep: 09/02/1962.    
03/12/1962 Withdrawn Condemned as 64848 from West Auckland (51F)    
01/1963 Scrapped Scrapped    

prev prev