Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 2475 Today
» 4163 Yesterday
» 15881 Week
» 68897 Month
» 188424 Year
» 3215277 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2006 on 05/09/1936
London and North Eastern Railway (1946 1st) 995 on Not applied
London and North Eastern Railway (1946 2nd) 506   30/06/1946
British Railways 60506   18/12/1948

Names Carried
Date From Name
05/09/1936 WOLF OF BADENOCH

Locomotive Specifics
Designer E. Thompson
Class A2
Company History LNER
Rebuild History
ClassFrom
P2/205/09/1936
A2/2 (4-6-2)15/04/1944
Wheels 4-6-2
Builder Doncaster Works
Order Number 612
Works Number 1842
To Service Tue 05/09/1936 to Haymarket (HAY)
Withdrawal Tue 04/04/1961 off New England (34E)
Service Life 24 yrs, 6 mths , 30 dys

Disposal
Scrapping Locomotive Works (Doncaster)

Notes
Notes Cut-up Doncaster Works

Allocations
Code Subsequent Codes Name From Date
HAY   Haymarket (New) on 05/09/1936
ABD   Aberdeen Ferryhill on 16/11/1936
HAY   Haymarket on 23/10/1942
61B   Aberdeen Ferryhill on 08/04/1949
64B   Haymarket on 15/05/1949
NWE   New England on 20/11/1949
     Withdrawn on 04/04/1961

SLS Allocations*
Type Code Name From Date
ALLOC ABD Aberdeen Ferryhill w/e 09/04/1949
ALLOC HAY Haymarket w/e 21/05/1949
ALLOC NWE New England w/e 26/11/1949
WDN   on 04/04/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
05/09/1936 Diagram 108 boiler fitted (number 8934)
15/04/1944 Diagram 106A boiler fitted (number 8796)
09/06/1952 Diagram 118 boiler fitted (number 29867)
05/01/1957 Diagram 118 boiler fitted (number 29847)
27/02/1959 Diagram 118 boiler fitted (number 29840)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Cowlairs Works 27/07/1937 03/08/1937 8 days Light Repair    
Doncaster Works 07/10/1937 19/11/1937 44 days Light Repair    
Doncaster Works 08/03/1938 01/04/1938 25 days Light Repair    
Doncaster Works 02/05/1939 03/07/1939 63 days General    
Doncaster Works 15/04/1940 14/05/1940 30 days Heavy    
Doncaster Works 29/10/1940 14/12/1940 47 days Heavy    
Doncaster Works 23/09/1941 13/00/1941   General    
Doncaster Works 18/03/1942 02/05/1942 46 days Heavy    
Cowlairs Works 04/01/1943 15/01/1943 12 days Light Repair    
Cowlairs Works 24/04/1943 04/06/1943 42 days Light Repair    
Doncaster Works 28/01/1944 15/04/1944 79 days Heavy Rebuilt to class A2/2
Boiler number 8796 (Diagram 106A)
 
Cowlairs Works 19/06/1944 21/06/1944 3 days Light Repair    
Cowlairs Works 15/07/1944 16/08/1944 33 days Light Repair    
Cowlairs Works 17/10/1944 21/10/1944 5 days Light Repair    
Cowlairs Works 27/11/1944 28/11/1944 2 days Unclassified    
Cowlairs Works 11/03/1945 20/03/1945 10 days Light Repair    
Inverurie Works 17/04/1945 18/04/1945 2 days Unclassified    
Cowlairs Works 10/05/1945 10/05/1945 1 day Unclassified    
Inverurie Works 25/06/1945 25/06/1945 1 day Unclassified    
Cowlairs Works 20/08/1945 12/09/1945 24 days Heavy    
Cowlairs Works 25/09/1945 25/09/1945 1 day Unclassified    
Inverurie Works 19/10/1945 19/10/1945 1 day Weighing After derailment at Craigentinny
 
Cowlairs Works 08/01/1946 17/01/1946 10 days Light Repair    
Cowlairs Works 04/09/1946 18/09/1946 15 days Light Repair    
Cowlairs Works 03/01/1947 18/10/1947 289 days General    
Cowlairs Works 14/12/1948 18/12/1948 5 days Light Repair Renumbered to BR 60506
 
Cowlairs Works 19/05/1949 17/06/1949 30 days Heavy Intermediate    
Cowlairs Works 14/07/1949 14/07/1949 1 day Unclassified    
Doncaster Works 04/06/1950 28/07/1950 55 days General    
Doncaster Works 29/04/1952 09/06/1952 42 days General Boiler number 29867 (Diagram 118)
 
Doncaster Works 30/09/1952 29/10/1952 30 days Unclassified    
Doncaster Works 02/01/1953 21/01/1953 20 days Light Casual    
Doncaster Works 11/11/1953 09/12/1953 29 days Unclassified    
Doncaster Works 25/02/1954 03/03/1954 7 days Unclassified    
Doncaster Works 26/05/1954 09/07/1954 45 days Heavy Intermediate    
Doncaster Works 17/01/1955 14/02/1955 29 days Light Casual    
Doncaster Works 03/11/1955 03/12/1955 31 days Light Casual    
Doncaster Works 18/01/1956 07/02/1956 21 days Light Casual    
Doncaster Works 24/02/1956 27/03/1956 33 days Light Casual    
Doncaster Works 04/07/1956 19/07/1956 16 days Light Casual    
Doncaster Works 10/09/1956 03/10/1956 24 days Light Casual    
Doncaster Works 13/11/1956 05/01/1957 54 days General Boiler number 29847 (Diagram 118)
 
Doncaster Works 24/05/1957 11/06/1957 19 days Light Casual    
Doncaster Works 23/09/1957 22/10/1957 30 days Heavy Casual    
Doncaster Works 02/01/1958 10/01/1958 9 days Unclassified    
Doncaster Works 06/06/1958 17/06/1958 12 days Unclassified    
Doncaster Works 07/08/1958 21/08/1958 15 days Light Casual    
Doncaster Works 22/09/1958 02/10/1958 11 days Unclassified    
Doncaster Works 15/11/1958 21/11/1958 7 days Unclassified    
Doncaster Works 05/01/1959 27/02/1959 54 days General Boiler number 29840 (Diagram 118)
 
Doncaster Works 18/09/1959 25/09/1959 8 days Unclassified    
Doncaster Works 04/04/1961 04/04/1961 1 day No repairs    

Mentions ...
Report Date Title Report Source
05/06/1949 Cowlairs Works Locomotives entering Works 9/5 to 5/6: These included Nos. 60503/06, 61002, 1260/1/2, 1742/66/93, 61998, 2402/40/60, 4594, 4617/26, 4818/58, 65933, 7480/91, 67631, 8104, 9209, 69500/10, 9553, 69565, Class '8' 73799, 77031, 77431/42/76, ex L.M.S. Nos. 44994, 16156. SLS/194907
04/01/1959 Doncaster MPD (On shed, waiting Works) On shed, waiting Works-60101 (64B), 60506 (34E), 60118 (56C), 60078 (52A), 61159 (40B). Ex Wks.-60517 (52B), 60137 (52A), 61978 (34E), 70000 (30A), 61894 (40A), 61956 (40B), 60094 (64B), 61212 (36E). Stored-63939/41/2/3/54/6/7/63/4/7/9/77/81/3/4, 64876/981 all in open. Others-60031 (64B), D3646/7 (36C), 92035 (36C), D3621/2, D3481/2, 92172/3/95/2201, 69586 (34C), 48269 (2E), 62017/55/70 (31B), 43060 (40F). SLS/195902
29/01/1961 New England 60506/8 were in steam on SLS Visit on 29/1/61- 60504 was withdrawn 17/1/61. K2 61742 (from Boston) has replaced 61763 as stationary boiler. In store are L1s 67717/8/21/32/8 for LMR Gorton, and 67778/95/6/8 ex LMR Gorton. SLS/196103

Summary
Date Event Details Source See Also
05/09/1936 To Service To service as London and North Eastern Railway Number 2006, name: WOLF OF BADENOCH
Built at Doncaster Works, Works Number 1842
Allocated to Haymarket (HAY)
Diagram 108 boiler fitted
   
16/11/1936 Allocation Reallocated to Aberdeen Ferryhill (ABD)    
27/07/1937 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 27/07/1937. Dep: 03/08/1937.    
07/10/1937 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 07/10/1937. Dep: 19/11/1937.    
08/03/1938 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 08/03/1938. Dep: 01/04/1938.    
02/05/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/05/1939. Dep: 03/07/1939.    
15/04/1940 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 15/04/1940. Dep: 14/05/1940.    
29/10/1940 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 29/10/1940. Dep: 14/12/1940.    
23/09/1941 Works Visit Works Visit - Doncaster Works (General) - Arr: 23/09/1941. Dep: 13/00/1941.    
18/03/1942 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 18/03/1942. Dep: 02/05/1942.    
23/10/1942 Allocation Reallocated to Haymarket (HAY)    
04/01/1943 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 04/01/1943. Dep: 15/01/1943.    
24/04/1943 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 24/04/1943. Dep: 04/06/1943.    
28/01/1944 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 28/01/1944. Dep: 15/04/1944.
Work undertaken:
Rebuilt to class A2/2
Boiler number 8796 (Diagram 106A)
   
19/06/1944 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 19/06/1944. Dep: 21/06/1944.    
15/07/1944 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 15/07/1944. Dep: 16/08/1944.    
17/10/1944 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 17/10/1944. Dep: 21/10/1944.    
27/11/1944 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 27/11/1944. Dep: 28/11/1944.    
11/03/1945 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 11/03/1945. Dep: 20/03/1945.    
17/04/1945 Works Visit Works Visit - Inverurie Works (Unclassified) - Arr: 17/04/1945. Dep: 18/04/1945.    
10/05/1945 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 10/05/1945. Dep: 10/05/1945.    
25/06/1945 Works Visit Works Visit - Inverurie Works (Unclassified) - Arr: 25/06/1945. Dep: 25/06/1945.    
20/08/1945 Works Visit Works Visit - Cowlairs Works (Heavy) - Arr: 20/08/1945. Dep: 12/09/1945.    
25/09/1945 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 25/09/1945. Dep: 25/09/1945.    
19/10/1945 Works Visit Works Visit - Inverurie Works (Weighing) - Arr: 19/10/1945. Dep: 19/10/1945.
Work undertaken:
After derailment at Craigentinny
   
1946 Number Allocated Allocated number 995 but not taken up    
08/01/1946 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 08/01/1946. Dep: 17/01/1946.    
30/06/1946 Renumbered Renumbered to 506    
04/09/1946 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 04/09/1946. Dep: 18/09/1946.    
03/01/1947 Works Visit Works Visit - Cowlairs Works (General) - Arr: 03/01/1947. Dep: 18/10/1947.    
14/12/1948 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 14/12/1948. Dep: 18/12/1948.
Work undertaken:
Renumbered to BR 60506
   
08/04/1949 Allocation Reallocated to Aberdeen Ferryhill (61B)    
15/05/1949 Allocation Reallocated to Haymarket (64B)    
19/05/1949 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 19/05/1949. Dep: 17/06/1949.    
14/07/1949 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 14/07/1949. Dep: 14/07/1949.    
20/11/1949 Allocation Reallocated to New England (NWE)    
04/06/1950 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/06/1950. Dep: 28/07/1950.    
29/04/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/04/1952. Dep: 09/06/1952.
Work undertaken:
Boiler number 29867 (Diagram 118)
   
30/09/1952 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 30/09/1952. Dep: 29/10/1952.    
02/01/1953 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 02/01/1953. Dep: 21/01/1953.    
11/11/1953 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 11/11/1953. Dep: 09/12/1953.    
25/02/1954 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 25/02/1954. Dep: 03/03/1954.    
26/05/1954 Works Visit Works Visit - Doncaster Works (Heavy Intermediate) - Arr: 26/05/1954. Dep: 09/07/1954.    
17/01/1955 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 17/01/1955. Dep: 14/02/1955.    
03/11/1955 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 03/11/1955. Dep: 03/12/1955.    
18/01/1956 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 18/01/1956. Dep: 07/02/1956.    
24/02/1956 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 24/02/1956. Dep: 27/03/1956.    
04/07/1956 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 04/07/1956. Dep: 19/07/1956.    
10/09/1956 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 10/09/1956. Dep: 03/10/1956.    
13/11/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/11/1956. Dep: 05/01/1957.
Work undertaken:
Boiler number 29847 (Diagram 118)
   
24/05/1957 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 24/05/1957. Dep: 11/06/1957.    
23/09/1957 Works Visit Works Visit - Doncaster Works (Heavy Casual) - Arr: 23/09/1957. Dep: 22/10/1957.    
02/01/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 02/01/1958. Dep: 10/01/1958.    
06/06/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 06/06/1958. Dep: 17/06/1958.    
07/08/1958 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 07/08/1958. Dep: 21/08/1958.    
22/09/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 22/09/1958. Dep: 02/10/1958.    
15/11/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 15/11/1958. Dep: 21/11/1958.    
05/01/1959 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/01/1959. Dep: 27/02/1959.
Work undertaken:
Boiler number 29840 (Diagram 118)
   
18/09/1959 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 18/09/1959. Dep: 25/09/1959.    
04/04/1961 Withdrawn Condemned as 60506 from New England (34E)    
04/04/1961 Works Visit Works Visit - Doncaster Works (No repairs) - Arr: 04/04/1961. Dep: 04/04/1961.    

prev