Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 11 Online
» 29 Today
» 4397 Yesterday
» 17832 Week
» 70848 Month
» 190375 Year
» 3217228 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2120 m/e 10/1901
London and North Eastern Railway (1946) 3254   22/08/1946
British Railways 63254   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/110/1901
Wheels 0-8-0
Builder Gateshead Works
Order Number A137
Works Number 14 01
Fittings (as built)
Engine Brakes Steam
To Service During 10/1901 to Newport (Teeside) (NPT)
Withdrawal Fri 11/06/1948 off Borough Gardens (BOR)
Service Life 46 yrs, 8 mths , 12 dys
Information Piston valves

Disposal
Scrapping During 06/1948 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) m/e 10/1901
MID   Middlesbrough on 06/02/1937
NPT   Newport (Teeside) on 07/11/1938
BOR   Borough Gardens on 28/03/1943
     Withdrawn on 11/06/1948

SLS Allocations*
Type Code Name From Date
WDN BOR Borough Gardens on 11/06/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/1901 Diagram 56 boiler fitted (number G100)
04/1919 Diagram 56 boiler fitted (number D714)
30/11/1925 Diagram 56 boiler fitted (number D737)
05/08/1932 Diagram 56 boiler fitted (number 2227)
08/03/1935 Diagram 56 boiler fitted (number D1769)
02/07/1938 Diagram 56 boiler fitted (number D1004)
11/10/1940 Diagram 56 boiler fitted (number 2159)
31/12/1942 Diagram 56 boiler fitted (number 2271)
11/06/1945 Diagram 56B boiler fitted (number 2904)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1919 04/1919   General Boiler number D714 (Diagram 56)
 
Darlington Works 01/03/1923 25/05/1923 86 days General    
Darlington Works 17/09/1925 30/11/1925 75 days General Boiler number D737 (Diagram 56)
 
Darlington Works 02/11/1928 18/12/1928 47 days General    
Darlington Works 13/06/1932 05/08/1932 54 days General Boiler number 2227 (Diagram 56)
 
Darlington Works 06/02/1935 08/03/1935 31 days General Boiler number D1769 (Diagram 56)
 
Darlington Works 23/05/1938 02/07/1938 41 days General Boiler number D1004 (Diagram 56)
 
Darlington Works 11/09/1940 11/10/1940 31 days General Tender only
Boiler number 2159 (Diagram 56)
 
Darlington Works 26/11/1942 31/12/1942 36 days General Boiler number 2271 (Diagram 56)
 
Darlington Works 17/04/1945 11/06/1945 56 days General Boiler number 2904 (Diagram 56B)
 
Gateshead Works 06/08/1946 19/08/1946 14 days Light Repair    
Gateshead Works 26/06/1947 23/08/1947 59 days Light Repair    
Darlington Works 25/05/1948 25/05/1948 1 day No repairs    

Summary
Date Event Details Source See Also
10/1901 To Service To service as North Eastern Railway Number 2120
Built at Gateshead Works, Works Number 14 01
Allocated to Newport (Teeside) (NPT)
Diagram 56 boiler fitted
   
01/03/1923 Works Visit Works Visit - Darlington Works (General) - Arr: 01/03/1923. Dep: 25/05/1923.    
17/09/1925 Works Visit Works Visit - Darlington Works (General) - Arr: 17/09/1925. Dep: 30/11/1925.
Work undertaken:
Boiler number D737 (Diagram 56)
   
02/11/1928 Works Visit Works Visit - Darlington Works (General) - Arr: 02/11/1928. Dep: 18/12/1928.    
13/06/1932 Works Visit Works Visit - Darlington Works (General) - Arr: 13/06/1932. Dep: 05/08/1932.
Work undertaken:
Boiler number 2227 (Diagram 56)
   
06/02/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 06/02/1935. Dep: 08/03/1935.
Work undertaken:
Boiler number D1769 (Diagram 56)
   
06/02/1937 Allocation Reallocated to Middlesbrough (MID)    
23/05/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 23/05/1938. Dep: 02/07/1938.
Work undertaken:
Boiler number D1004 (Diagram 56)
   
07/11/1938 Allocation Reallocated to Newport (Teeside) (NPT)    
11/09/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 11/09/1940. Dep: 11/10/1940.
Work undertaken:
Tender only
Boiler number 2159 (Diagram 56)
   
26/11/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 26/11/1942. Dep: 31/12/1942.
Work undertaken:
Boiler number 2271 (Diagram 56)
   
28/03/1943 Allocation Reallocated to Borough Gardens (BOR)    
17/04/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 17/04/1945. Dep: 11/06/1945.
Work undertaken:
Boiler number 2904 (Diagram 56B)
   
06/08/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 06/08/1946. Dep: 19/08/1946.    
22/08/1946 Renumbered Renumbered to 3254    
26/06/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 26/06/1947. Dep: 23/08/1947.    
25/05/1948 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 25/05/1948. Dep: 25/05/1948.    
06/1948 Scrapped Broken up by Locomotive Works: Darlington    
11/06/1948 Withdrawn Condemned as 3254 from Borough Gardens (BOR)    
1949 Number Allocated Allocated number 63254 but not taken up    

prev prev