Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 1102 Today
» 4397 Yesterday
» 18905 Week
» 71921 Month
» 191448 Year
» 3218301 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 130 m/e 03/1902
London and North Eastern Railway (1946) 3260   01/05/1946
British Railways (BR Tmp) E3260   06/02/1948
British Railways 63260   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/103/1902
Wheels 0-8-0
Builder Gateshead Works
Order Number A139
Works Number 20 01
Fittings (as built)
Engine Brakes Steam
To Service During 03/1902 to Hull Dairycoates (HLD)
Withdrawal Wed 21/06/1950 off Middlesbrough (51D)
Service Life 48 yrs, 3 mths , 23 dys
Information Slide valves

Disposal
Scrapping During y/e 1950 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
HLD   Hull Dairycoates (New) m/e 03/1902
HAV   Haverton Hill on 18/06/1931
BLA   Blaydon on 23/07/1945
MID   Middlesbrough on 20/07/1947
     Withdrawn on 21/06/1950

SLS Allocations*
Type Code Name From Date
ALLOC MID Middlesbrough on 20/07/1947
WDN 51D Middlesbrough on 21/06/1950

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
03/1902 Diagram 56 boiler fitted (number G149)
07/04/1917 Diagram 56 boiler fitted (number G252)
11/1919 Diagram 56 boiler fitted (number D1006)
30/04/1925 Diagram 56 boiler fitted (number D1037)
16/06/1931 Diagram 56 boiler fitted (number D854)
22/01/1935 Diagram 56 boiler fitted (number D1454)
06/03/1939 Diagram 56 boiler fitted (number 2080)
28/04/1942 Diagram 56 boiler fitted (number 2225)
13/12/1944 Diagram 56 boiler fitted (number 2073)
06/02/1948 Diagram 56B boiler fitted (number 2806)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1917 04/1917   General    
  1919 11/1919   General Boiler number D1006 (Diagram 56)
 
  1922 11/1922   General    
Darlington Works 13/12/1924 30/04/1925 139 days General Boiler number D1037 (Diagram 56)
 
Darlington Works 19/03/1928 23/05/1928 66 days General    
Darlington Works 15/05/1931 16/06/1931 33 days General Boiler number D854 (Diagram 56)
 
Darlington Works 13/12/1934 22/01/1935 41 days General Boiler number D1454 (Diagram 56)
 
Darlington Works 08/06/1937 27/08/1937 81 days Light Repair    
Darlington Works 02/02/1939 06/03/1939 33 days General Boiler number 2080 (Diagram 56)
 
Darlington Works 31/03/1942 28/04/1942 29 days General Boiler number 2225 (Diagram 56)
 
Darlington Works 17/11/1944 13/12/1944 27 days General Boiler number 2073 (Diagram 56)
 
Gateshead Works 10/05/1946 23/05/1946 14 days Light Repair    
Darlington Works 06/12/1946 31/12/1946 26 days Light Repair    
Darlington Works 08/12/1947 06/02/1948 61 days General Boiler number 2806 (Diagram 56B)
Renumbered to BR (BR Tmp) number E3260
 
Gateshead Works 04/05/1949 20/05/1949 17 days Light Casual    

Mentions ...
Report Date Title Report Source
29/02/1948 Darlington Works New 'L.1's' are completed up to No. 9010. No. 9001 has returned to N.Rd with a damaged buffer beam. Nos. 9002-9006 are still working from Darlington and Nos. 9007-9010 have not yet been handed over to the shed. Nos. 9004/5 are Darlington 2023/4 of 1948, both bearing a January paint date. Locomotives for shops during February included Nos. 510, 804, 822, 2933, 2937, 2993, 3279, 3298, 3375, 3420, 4756, 5063, 5612, 5691, 5878, 7266, 7604, 7608, 8235, 8248, 8250, 8273, 8277, 8427, 8730, 9419, 9834, 9838 an 9875. Of these Nos. 3279, 5063 and 9419 are in the scrap yard, No. 9419 being cut up at the end of February. Locomotives ex shops during February included Nos. 937, 1069, 2354, 2382, 2386, 2982, 3260, 3370, 3373, 3374, 5645, 5646, 5663, 5716, 5769, 5805, 7243, 7334, 8230, 8272, 8310, 8402, 8433, 8727, 8729, 8748, 9097, 9118, 9376 an 9780. 'B.1' No. 1069 is painted green and lettered 'British Railways' as No. 1289 (NBL 26190/47) SLS/194804
30/04/1949 Darlington Works New work April: Nos. 60146 an 60147. Locomotives awaiting Works during April included: Nos. 888, 1035, 61199, 1224, 1405, 61625, 1668, 2726, 62753. 2760, 3044, 3260, 3275, 63286, 5044/68, 5109, 65633/50, 5653, 65684, 5858, 65868, 7278, 7675, 67729 (light re-pair), 67739 (damaged), 8156, 69842, Class '8' W.D. 77037, 77178 an 79206. Broken up: Nos. 63286, 3316, 65633/84.
Locomotives ex Works during April included: Nos. 60816, 61023, 61215/40/57, 61422, 61434 (rebuilt), 61648, 62700/03/64/67, 63348/80/92, 63411, 65110, 65739, 65821/44, 67722 (light repair), 68015/27, 68409/14/32, 68705, 69107, 69391, 69835/36/88, Class '8' W.D. 90382, 90449 (light repair) and 90460.
SLS/194906

Summary
Date Event Details Source See Also
03/1902 To Service To service as North Eastern Railway Number 130
Built at Gateshead Works, Works Number 20 01
Allocated to Hull Dairycoates (HLD)
Diagram 56 boiler fitted
   
07/04/1917 Modification Diagram 56 number G252 boiler fitted    
13/12/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 13/12/1924. Dep: 30/04/1925.
Work undertaken:
Boiler number D1037 (Diagram 56)
   
19/03/1928 Works Visit Works Visit - Darlington Works (General) - Arr: 19/03/1928. Dep: 23/05/1928.    
15/05/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 15/05/1931. Dep: 16/06/1931.
Work undertaken:
Boiler number D854 (Diagram 56)
   
18/06/1931 Allocation Reallocated to Haverton Hill (HAV)    
13/12/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 13/12/1934. Dep: 22/01/1935.
Work undertaken:
Boiler number D1454 (Diagram 56)
   
08/06/1937 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 08/06/1937. Dep: 27/08/1937.    
02/02/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 02/02/1939. Dep: 06/03/1939.
Work undertaken:
Boiler number 2080 (Diagram 56)
   
31/03/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 31/03/1942. Dep: 28/04/1942.
Work undertaken:
Boiler number 2225 (Diagram 56)
   
17/11/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 17/11/1944. Dep: 13/12/1944.
Work undertaken:
Boiler number 2073 (Diagram 56)
   
23/07/1945 Allocation Reallocated to Blaydon (BLA)    
01/05/1946 Renumbered Renumbered to 3260    
10/05/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 10/05/1946. Dep: 23/05/1946.    
06/12/1946 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 06/12/1946. Dep: 31/12/1946.    
20/07/1947 Allocation Reallocated to Middlesbrough (MID)    
08/12/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 08/12/1947. Dep: 06/02/1948.
Work undertaken:
Boiler number 2806 (Diagram 56B)
Renumbered to BR (BR Tmp) number E3260
   
1949 Number Allocated Allocated number 63260 but not taken up    
04/05/1949 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 04/05/1949. Dep: 20/05/1949.    
1950 Scrapped Broken up by Locomotive Works: Darlington    
21/06/1950 Withdrawn Condemned as 3260 from Middlesbrough (51D)    

prev prev