Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 1657 Today
» 4163 Yesterday
» 15063 Week
» 68079 Month
» 187606 Year
» 3214459 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 162 m/e 06/1903
London and North Eastern Railway (1946) 3275   27/10/1946
British Railways 63275   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/106/1903
Wheels 0-8-0
Builder Gateshead Works
Order Number E105
Works Number 11 03
Fittings (as built)
Engine Brakes Steam
To Service During 06/1903 to Haverton Hill (HAV)
Withdrawal Mon 18/04/1949 off Haverton Hill (HAV)
Service Life 45 yrs, 10 mths , 18 dys
Information Piston valves

Disposal
Scrapping During 05/1949 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
HAV   Haverton Hill (New) m/e 06/1903
TDK   Tyne Dock on 28/03/1943
BOR   Borough Gardens on 13/04/1947
HAV   Haverton Hill on 15/02/1948
     Withdrawn on 18/04/1949

Modifications
Date Modified Modification
06/1903 Diagram 56 boiler fitted (number G287)
07/02/1911 Diagram 56 boiler fitted (number D2097)
30/03/1927 Diagram 56 boiler fitted (number D1769)
26/02/1932 Diagram 56 boiler fitted (number D1380)
02/11/1934 Diagram 56 boiler fitted (number D1441)
24/11/1938 Diagram 56 boiler fitted (number 2168)
15/07/1943 Diagram 56B boiler fitted (number 3126)
30/11/1946 Diagram 56B boiler fitted (number 2929)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1911 02/1911   General    
Darlington Works 21/08/1923 29/10/1923 70 days General    
Darlington Works 16/05/1924 10/06/1924 26 days Light Repair    
Darlington Works 14/01/1927 30/03/1927 76 days General Boiler number D1769 (Diagram 56)
 
Darlington Works 14/10/1929 29/11/1929 47 days General    
Darlington Works 11/02/1932 26/02/1932 16 days Heavy Boiler number D1380 (Diagram 56)
 
Darlington Works 05/10/1934 02/11/1934 29 days General Boiler number D1441 (Diagram 56)
 
Darlington Works 25/10/1938 24/11/1938 31 days General Boiler number 2168 (Diagram 56)
 
Darlington Works 10/03/1941 05/05/1941 57 days General    
Darlington Works 16/06/1943 15/07/1943 30 days General Boiler number 3126 (Diagram 56B)
 
Gateshead Works 27/06/1945 05/07/1945 9 days Light Repair    
Darlington Works 31/10/1946 30/11/1946 31 days General Boiler number 2929 (Diagram 56B)
 

Summary
Date Event Details Source See Also
06/1903 To Service To service as North Eastern Railway Number 162
Built at Gateshead Works, Works Number 11 03
Allocated to Haverton Hill (HAV)
Diagram 56 boiler fitted
   
07/02/1911 Modification Diagram 56 number D2097 boiler fitted    
21/08/1923 Works Visit Works Visit - Darlington Works (General) - Arr: 21/08/1923. Dep: 29/10/1923.    
16/05/1924 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 16/05/1924. Dep: 10/06/1924.    
14/01/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 14/01/1927. Dep: 30/03/1927.
Work undertaken:
Boiler number D1769 (Diagram 56)
   
14/10/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 14/10/1929. Dep: 29/11/1929.    
11/02/1932 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 11/02/1932. Dep: 26/02/1932.
Work undertaken:
Boiler number D1380 (Diagram 56)
   
05/10/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 05/10/1934. Dep: 02/11/1934.
Work undertaken:
Boiler number D1441 (Diagram 56)
   
25/10/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 25/10/1938. Dep: 24/11/1938.
Work undertaken:
Boiler number 2168 (Diagram 56)
   
10/03/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 10/03/1941. Dep: 05/05/1941.    
28/03/1943 Allocation Reallocated to Tyne Dock (TDK)    
16/06/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 16/06/1943. Dep: 15/07/1943.
Work undertaken:
Boiler number 3126 (Diagram 56B)
   
27/06/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 27/06/1945. Dep: 05/07/1945.    
27/10/1946 Renumbered Renumbered to 3275    
31/10/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 31/10/1946. Dep: 30/11/1946.
Work undertaken:
Boiler number 2929 (Diagram 56B)
   
13/04/1947 Allocation Reallocated to Borough Gardens (BOR)    
15/02/1948 Allocation Reallocated to Haverton Hill (HAV)    
1949 Number Allocated Allocated number 63275 but not taken up    
18/04/1949 Withdrawn Condemned as 3275 from Haverton Hill (HAV)    
05/1949 Scrapped Broken up by Locomotive Works: Darlington    

prev prev