Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 890 Today
» 4163 Yesterday
» 14296 Week
» 67312 Month
» 186839 Year
» 3213692 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 650 m/e 06/1903
London and North Eastern Railway (1946) 3280   17/11/1946
British Railways 63280   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/106/1903
Wheels 0-8-0
Builder Gateshead Works
Order Number E107
Works Number 12 03
Fittings (as built)
Engine Brakes Steam
To Service During 06/1903 to Newport (Teeside) (NPT)
Withdrawal Wed 25/10/1950 off Selby (50C)
Service Life 47 yrs, 4 mths , 24 dys
Information Piston valves

Disposal
Scrapping During 11/1950 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) m/e 06/1903
SEL   Selby on 12/06/1939
NEV   Neville Hill on 06/02/1949
NEV   Neville Hill w/e 12/02/1949
SEL   Selby on 10/07/1949
SEL   Selby w/e 16/07/1949
     Withdrawn on 25/10/1950

SLS Allocations*
Type Code Name From Date
ALLOC NEV Neville Hill w/e 12/02/1949
ALLOC SEL Selby w/e 16/07/1949
WDN 50C Selby on 25/10/1950

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1903 Diagram 56 boiler fitted (number G288)
04/1913 Diagram 56 boiler fitted (number G253)
07/12/1917 Diagram 56 boiler fitted (number D716)
06/11/1929 Diagram 56 boiler fitted (number D562)
03/06/1932 Diagram 56 boiler fitted (number D602)
29/03/1935 Diagram 56 boiler fitted (number 2227)
04/03/1938 Diagram 56B boiler fitted (number 2906)
18/01/1941 Diagram 56B boiler fitted (number 3127)
02/10/1943 Diagram 56B boiler fitted (number 3117)
23/02/1946 Diagram 56B boiler fitted (number 2806)
02/01/1948 Diagram 56 boiler fitted (number 2225)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1913 04/1913   General Boiler number G253 (Diagram 56)
 
  1917 12/1917   General    
Darlington Works 01/11/1923 11/01/1924 72 days General    
Darlington Works 25/07/1927 13/10/1927 81 days General    
Darlington Works 24/09/1929 06/11/1929 44 days General Boiler number D562 (Diagram 56)
 
Darlington Works 03/05/1932 03/06/1932 32 days General Boiler number D602 (Diagram 56)
 
Darlington Works 26/02/1935 29/03/1935 32 days General Boiler number 2227 (Diagram 56)
 
Darlington Works 02/02/1938 04/03/1938 31 days General Boiler number 2906 (Diagram 56B)
 
Darlington Works 11/01/1939 17/02/1939 38 days Light Repair    
Darlington Works 19/12/1940 18/01/1941 31 days General Boiler number 3127 (Diagram 56B)
 
Darlington Works 23/11/1942 12/12/1942 20 days Unclassified    
Darlington Works 08/09/1943 02/10/1943 25 days General Boiler number 3117 (Diagram 56B)
 
Gateshead Works 25/11/1944 09/12/1944 15 days Light Repair    
Darlington Works 30/01/1946 23/02/1946 25 days General Boiler number 2806 (Diagram 56B)
 
Darlington Works 02/12/1947 02/01/1948 32 days General Boiler number 2225 (Diagram 56)
 

Summary
Date Event Details Source See Also
06/1903 To Service To service as North Eastern Railway Number 650
Built at Gateshead Works, Works Number 12 03
Allocated to Newport (Teeside) (NPT)
Diagram 56 boiler fitted
   
07/12/1917 Modification Diagram 56 number D716 boiler fitted    
01/11/1923 Works Visit Works Visit - Darlington Works (General) - Arr: 01/11/1923. Dep: 11/01/1924.    
25/07/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 25/07/1927. Dep: 13/10/1927.    
24/09/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 24/09/1929. Dep: 06/11/1929.
Work undertaken:
Boiler number D562 (Diagram 56)
   
03/05/1932 Works Visit Works Visit - Darlington Works (General) - Arr: 03/05/1932. Dep: 03/06/1932.
Work undertaken:
Boiler number D602 (Diagram 56)
   
26/02/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 26/02/1935. Dep: 29/03/1935.
Work undertaken:
Boiler number 2227 (Diagram 56)
   
02/02/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 02/02/1938. Dep: 04/03/1938.
Work undertaken:
Boiler number 2906 (Diagram 56B)
   
11/01/1939 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 11/01/1939. Dep: 17/02/1939.    
12/06/1939 Allocation Reallocated to Selby (SEL)    
19/12/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 19/12/1940. Dep: 18/01/1941.
Work undertaken:
Boiler number 3127 (Diagram 56B)
   
23/11/1942 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 23/11/1942. Dep: 12/12/1942.    
08/09/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 08/09/1943. Dep: 02/10/1943.
Work undertaken:
Boiler number 3117 (Diagram 56B)
   
25/11/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 25/11/1944. Dep: 09/12/1944.    
30/01/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 30/01/1946. Dep: 23/02/1946.
Work undertaken:
Boiler number 2806 (Diagram 56B)
   
17/11/1946 Renumbered Renumbered to 3280    
02/12/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 02/12/1947. Dep: 02/01/1948.
Work undertaken:
Boiler number 2225 (Diagram 56)
   
1949 Number Allocated Allocated number 63280 but not taken up    
06/02/1949 Allocation Reallocated to Neville Hill (NEV)    
12/02/1949 Allocation Reallocated to Neville Hill (NEV)    
10/07/1949 Allocation Reallocated to Selby (SEL)    
16/07/1949 Allocation Reallocated to Selby (SEL)    
25/10/1950 Withdrawn Condemned as 3280 from Selby (50C)    
11/1950 Scrapped Broken up by Locomotive Works: Darlington    

prev prev