Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 31 Online
» 4251 Today
» 4868 Yesterday
» 23162 Week
» 88116 Month
» 290780 Year
» 3317633 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1173 m/e 05/1904
London and North Eastern Railway (1946) 3299 on 20/01/1946
British Railways 63299 on Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/105/1904
Wheels 0-8-0
Builder Gateshead Works
Order Number E109
Works Number 10
Fittings (as built)
Engine Brakes Steam
To Service During 05/1904 to Hull Dairycoates (HLD)
Withdrawal Sat 12/02/1949 off Haverton Hill (HAV)
Service Life 44 yrs, 9 mths , 13 dys
Information Piston valves

Disposal
Scrapping During 02/1949 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
HLD   Hull Dairycoates (New) m/e 05/1904
SKN   Stockton on 07/02/1925
HAV   Haverton Hill on 25/06/1930
     Withdrawn on 12/02/1949

SLS Allocations*
Type Code Name From Date
WDN HAV Haverton Hill on 07/02/1949

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
05/1904 Diagram 56 boiler fitted (number G333)
04/1920 Diagram 56 boiler fitted (number D1052)
10/05/1934 Diagram 56 boiler fitted (number D1457)
07/10/1937 Diagram 56 boiler fitted (number 2271)
26/07/1940 Diagram 56 boiler fitted (number D1745)
04/03/1943 Diagram 56 boiler fitted (number 2150)
11/05/1946 Diagram 56 boiler fitted (number 2272)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1920 04/1920   General Boiler number D1052 (Diagram 56)
 
Gateshead Works 06/06/1923 17/08/1923 73 days General    
Darlington Works 20/06/1927 12/10/1927 115 days General    
Darlington Works 24/03/1930 06/05/1930 44 days General    
Darlington Works 06/12/1932 05/01/1933 31 days Heavy    
Darlington Works 12/04/1934 10/05/1934 29 days General Boiler number D1457 (Diagram 56)
 
Darlington Works 02/09/1937 07/10/1937 36 days General Boiler number 2271 (Diagram 56)
 
Darlington Works 02/07/1940 26/07/1940 25 days General Boiler number D1745 (Diagram 56)
 
Darlington Works 02/02/1943 04/03/1943 31 days General Boiler number 2150 (Diagram 56)
 
Gateshead Works 27/09/1944 17/10/1944 21 days Light Repair    
Darlington Works 10/04/1946 11/05/1946 32 days General Boiler number 2272 (Diagram 56)
 
Gateshead Works 16/08/1947 05/09/1947 21 days Light Repair    
Darlington Works 04/01/1949 04/01/1949 1 day No repairs    

Mentions ...
Report Date Title Report Source
28/02/1949 Darlington Works (To scrap yard) Locomotives awaiting Works during February included:-Nos. 1274, 1605/11/18/31/45, 2745/67, 3199, 3411, 5096, 5606/28, 5800, 7262, 8708, 9105, 60816, 60133, (adjustment), 61015 (damaged), 63140, 65057 (damaged in the Crook derailment), 65712, 67705/54, 69827 (NEA), Class '8' W.D. 77320 an 79239.To scrap yard: Nos. 3291/97/99, 3301/08/17/32, 63322 (badly damaged at Old Town Jct., Middlesboro').Locomotives ex Works during February included:-Nos. 60141, 60142 (Darlington 2061/1949-the first 1949 locomotive), 60143, 60509 (light repair), 60923, 60931 (light repair), 61022 (unlined black), 61161 (lined out), 61162 (unlined black), 61181/86, 61237/58, 61400, 61635/41, 61659 (light repair), 61660, 62353/59/78, 62718/32/64, 63341/49, 65098, 65601, 65633 (repaired at Gateshead-buffer beam snow plough fitted), 65712/49, 65827/60, 67255, 67386, 67623, 67714 (light repair), 68010/39, 68160, 68260, 69933, Class '8' W.D. 90252 (ex 77352), 90344 (ex 70877), 90613 (ex 77469). SLS/194904

Summary
Date Event Details Source See Also
05/1904 To Service To service as North Eastern Railway Number 1173
Built at Gateshead Works, Works Number 10
Allocated to Hull Dairycoates (HLD)
Diagram 56 boiler fitted
   
06/06/1923 Works Visit Works Visit - Gateshead Works (General) - Arr: 06/06/1923. Dep: 17/08/1923.    
07/02/1925 Allocation Reallocated to Stockton (SKN)    
20/06/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 20/06/1927. Dep: 12/10/1927.    
24/03/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 24/03/1930. Dep: 06/05/1930.    
25/06/1930 Allocation Reallocated to Haverton Hill (HAV)    
06/12/1932 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 06/12/1932. Dep: 05/01/1933.    
12/04/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 12/04/1934. Dep: 10/05/1934.
Work undertaken:
Boiler number D1457 (Diagram 56)
   
02/09/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 02/09/1937. Dep: 07/10/1937.
Work undertaken:
Boiler number 2271 (Diagram 56)
   
02/07/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 02/07/1940. Dep: 26/07/1940.
Work undertaken:
Boiler number D1745 (Diagram 56)
   
02/02/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 02/02/1943. Dep: 04/03/1943.
Work undertaken:
Boiler number 2150 (Diagram 56)
   
27/09/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 27/09/1944. Dep: 17/10/1944.    
20/01/1946 Renumbered Renumbered to 3299    
10/04/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 10/04/1946. Dep: 11/05/1946.
Work undertaken:
Boiler number 2272 (Diagram 56)
   
16/08/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 16/08/1947. Dep: 05/09/1947.    
1949 Number Allocated Allocated number 63299 but not taken up    
04/01/1949 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 04/01/1949. Dep: 04/01/1949.    
02/1949 Scrapped Broken up by Locomotive Works: Darlington    
12/02/1949 Withdrawn Condemned as 3299 from Haverton Hill (HAV)    

prev prev