Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 144 Today
» 4720 Yesterday
» 23775 Week
» 88729 Month
» 291393 Year
» 3318246 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 939 m/e 06/1907
London and North Eastern Railway (1946) 3302   17/11/1946

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/106/1907
Q5/2 (0-8-0)28/05/1934
Q5/1 (0-8-0)31/05/1943
Wheels 0-8-0
Builder Darlington Works
Order Number 351A
Works Number 518
Fittings (as built)
Engine Brakes Steam
To Service During 06/1907 to Shildon (SHI)
Withdrawal Thu 18/09/1947 off Blaydon (BLA)
Service Life 40 yrs, 3 mths , 18 dys
Information Slide valves

Disposal
Scrapping Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
SHI   Shildon (New) m/e 06/1907
NPT   Newport (Teeside) on 07/01/1935
BLA   Blaydon on 23/07/1945
     Withdrawn on 18/09/1947

SLS Allocations*
Type Code Name From Date
WDN BLA Blaydon on 20/09/1947

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1907 Diagram 56 boiler fitted (number D1916)
07/12/1915 Diagram 56 boiler fitted (number D14)
12/12/1930 Diagram 56 boiler fitted (number 2233)
28/05/1934 Diagram 56A boiler fitted (number D1704)
01/02/1937 Diagram 56A boiler fitted (number D1994)
13/04/1940 Diagram 56A boiler fitted (number D1815)
06/03/1942 Diagram 56A boiler fitted (number D1670)
31/05/1943 Diagram 56B boiler fitted (number 3371)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1915 12/1915   General    
  1922 11/1922   General    
Darlington Works 13/01/1927 20/04/1927 98 days General    
Darlington Works 04/11/1930 12/12/1930 39 days General Boiler number 2233 (Diagram 56)
 
Darlington Works 02/05/1934 28/05/1934 27 days General Rebuilt to class Q5/2
Boiler number D1704 (Diagram 56A)
 
Darlington Works 21/12/1936 01/02/1937 43 days General Boiler number D1994 (Diagram 56A)
 
Darlington Works 27/02/1940 13/04/1940 47 days General Boiler number D1815 (Diagram 56A)
 
Darlington Works 16/04/1940 20/04/1940 5 days Unclassified    
Darlington Works 12/02/1942 06/03/1942 23 days General Boiler number D1670 (Diagram 56A)
 
Darlington Works 27/04/1943 31/05/1943 35 days General Rebuilt to class Q5/1
Boiler number 3371 (Diagram 56B)
 
Gateshead Works 24/06/1945 09/07/1945 16 days Light Repair    
Darlington Works 20/08/1947 20/08/1947 1 day No repairs    

Summary
Date Event Details Source See Also
06/1907 To Service To service as North Eastern Railway Number 939
Built at Darlington Works, Works Number 518
Allocated to Shildon (SHI)
Diagram 56 boiler fitted
   
07/12/1915 Modification Diagram 56 number D14 boiler fitted    
13/01/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 13/01/1927. Dep: 20/04/1927.    
04/11/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 04/11/1930. Dep: 12/12/1930.
Work undertaken:
Boiler number 2233 (Diagram 56)
   
02/05/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 02/05/1934. Dep: 28/05/1934.
Work undertaken:
Rebuilt to class Q5/2
Boiler number D1704 (Diagram 56A)
   
07/01/1935 Allocation Reallocated to Newport (Teeside) (NPT)    
21/12/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 21/12/1936. Dep: 01/02/1937.
Work undertaken:
Boiler number D1994 (Diagram 56A)
   
27/02/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 27/02/1940. Dep: 13/04/1940.
Work undertaken:
Boiler number D1815 (Diagram 56A)
   
16/04/1940 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 16/04/1940. Dep: 20/04/1940.    
12/02/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 12/02/1942. Dep: 06/03/1942.
Work undertaken:
Boiler number D1670 (Diagram 56A)
   
27/04/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 27/04/1943. Dep: 31/05/1943.
Work undertaken:
Rebuilt to class Q5/1
Boiler number 3371 (Diagram 56B)
   
24/06/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 24/06/1945. Dep: 09/07/1945.    
23/07/1945 Allocation Reallocated to Blaydon (BLA)    
17/11/1946 Renumbered Renumbered to 3302    
20/08/1947 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 20/08/1947. Dep: 20/08/1947.    
18/09/1947 Withdrawn Condemned as 3302 from Blaydon (BLA)    

prev prev