Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 1370 Today
» 4397 Yesterday
» 19173 Week
» 72189 Month
» 191716 Year
» 3218569 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1054 m/e 09/1907
London and North Eastern Railway (1946) 3305 on 20/01/1946
British Railways 63305 on Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/109/1907
Q5/2 (0-8-0)28/04/1934
Wheels 0-8-0
Builder Darlington Works
Order Number 351A
Works Number 521
Fittings (as built)
Engine Brakes Steam
To Service During 09/1907 to Blyth (North) (NBH)
Withdrawal Mon 16/05/1949 off Middlesbrough (MID)
Service Life 41 yrs, 8 mths , 15 dys
Information Slide valves

Disposal
Scrapping During 06/1949 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NBH   Blyth (North) (New) m/e 09/1907
SHI   Shildon on 05/06/1929
NPT   Newport (Teeside) on 07/01/1935
MID   Middlesbrough on 08/01/1944
     Withdrawn on 16/05/1949

SLS Allocations*
Type Code Name From Date
WDN MID Middlesbrough on 16/05/1949

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
09/1907 Diagram 56 boiler fitted (number D1919)
10/1912 Diagram 56 boiler fitted (number D1927)
07/05/1917 Diagram 56 boiler fitted (number D1915)
03/04/1925 Diagram 56 boiler fitted (number D1457)
28/04/1934 Diagram 56A boiler fitted (number D1674)
15/07/1937 Diagram 56A boiler fitted (number D1805)
13/07/1940 Diagram 56A boiler fitted (number D1994)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1912 10/1912   General Boiler number D1927 (Diagram 56)
 
  1917 05/1917   General    
  1922 22/12/1922   General    
Gateshead Works 24/01/1925 03/04/1925 70 days General Boiler number D1457 (Diagram 56)
 
Darlington Works 10/03/1930 29/04/1930 51 days General    
Darlington Works 04/04/1934 28/04/1934 25 days General Rebuilt to class Q5/2
Boiler number D1674 (Diagram 56A)
 
Darlington Works 01/06/1937 15/07/1937 45 days General Boiler number D1805 (Diagram 56A)
 
Darlington Works 26/07/1938 23/08/1938 29 days Heavy    
Darlington Works 23/12/1938 31/12/1938 9 days Unclassified    
Darlington Works 17/06/1940 13/07/1940 27 days General Boiler number D1994 (Diagram 56A)
 
Darlington Works 23/11/1942 29/12/1942 37 days General    
Darlington Works 03/01/1945 14/02/1945 43 days General    
Gateshead Works 23/04/1946 06/05/1946 14 days Light Repair    
Darlington Works 23/11/1946 18/12/1946 26 days Light Repair    
Darlington Works 25/01/1947 15/03/1947 50 days General    
Darlington Works 27/03/1947 01/04/1947 6 days Unclassified    

Mentions ...
Report Date Title Report Source
31/05/1949 Darlington Works (scrap yard) New Work May: Class 'A.1' Nos. 60148 an 60149. No. 60150 was ex the Paint Shop on 14/6, painted green. Locomotives awaiting Works durine May included: Nos. 812, 61069. 1407/15, 61600/61. 62709, 2726/41/56, 5109, 5675, 5784/87, 67317, 7609/19/20, 67708, 67741 (light repair), 8159, 9377, 69824/34/36, Class '8' 79184 an 90001. To scrap yard: Nos. 2377 (frames only), 3275/77, 3300/05/07/34, 65107, 5114, 5602, 65629 an 5703. Locomotives ex Works during May included: Nos. 60955, 61035. 61100 (unlined), 61199, 61224, 62397, 62745/53, 63351/95, 63440, 65040/47/89/92, 65110, 65653/55/59, 65730, 65848, 67319/31, 68061, 69106/11, Class '8' 90662/74. Nos. 60083/86 an 60127 have been noted here painted in the new blue colours with the crest on the tender. SLS/194907

Summary
Date Event Details Source See Also
09/1907 To Service To service as North Eastern Railway Number 1054
Built at Darlington Works, Works Number 521
Allocated to Blyth (North) (NBH)
Diagram 56 boiler fitted
   
07/05/1917 Modification Diagram 56 number D1915 boiler fitted    
24/01/1925 Works Visit Works Visit - Gateshead Works (General) - Arr: 24/01/1925. Dep: 03/04/1925.
Work undertaken:
Boiler number D1457 (Diagram 56)
   
05/06/1929 Allocation Reallocated to Shildon (SHI)    
10/03/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 10/03/1930. Dep: 29/04/1930.    
04/04/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 04/04/1934. Dep: 28/04/1934.
Work undertaken:
Rebuilt to class Q5/2
Boiler number D1674 (Diagram 56A)
   
07/01/1935 Allocation Reallocated to Newport (Teeside) (NPT)    
01/06/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 01/06/1937. Dep: 15/07/1937.
Work undertaken:
Boiler number D1805 (Diagram 56A)
   
26/07/1938 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 26/07/1938. Dep: 23/08/1938.    
23/12/1938 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 23/12/1938. Dep: 31/12/1938.    
17/06/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 17/06/1940. Dep: 13/07/1940.
Work undertaken:
Boiler number D1994 (Diagram 56A)
   
23/11/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 23/11/1942. Dep: 29/12/1942.    
08/01/1944 Allocation Reallocated to Middlesbrough (MID)    
03/01/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 03/01/1945. Dep: 14/02/1945.    
20/01/1946 Renumbered Renumbered to 3305    
23/04/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 23/04/1946. Dep: 06/05/1946.    
23/11/1946 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 23/11/1946. Dep: 18/12/1946.    
25/01/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 25/01/1947. Dep: 15/03/1947.    
27/03/1947 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 27/03/1947. Dep: 01/04/1947.    
1949 Number Allocated Allocated number 63305 but not taken up    
16/05/1949 Withdrawn Condemned as 3305 from Middlesbrough (MID)    
06/1949 Scrapped Broken up by Locomotive Works: Darlington    

prev prev