Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 781 Today
» 4163 Yesterday
» 14187 Week
» 67203 Month
» 186730 Year
» 3213583 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 774 m/e 10/1911
London and North Eastern Railway (1946) 3334   14/07/1946
British Railways 63334   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/110/1911
Wheels 0-8-0
Builder Darlington Works
Order Number 411A
Fittings (as built)
Engine Brakes Steam
To Service During 10/1911 to Shildon (SHI)
Withdrawal Mon 16/05/1949 off Darlington (DAR)
Service Life 37 yrs, 7 mths , 16 dys
Information Slide valves

Disposal
Scrapping During 05/1949 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
SHI   Shildon (New) m/e 10/1911
DAR   Darlington on 07/01/1935
     Withdrawn on 16/05/1949

SLS Allocations*
Type Code Name From Date
WDN DAR Darlington on 16/05/1949

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/1911 Diagram 56 boiler fitted (number D24)
10/1922 Diagram 56 boiler fitted (number D1921)
30/09/1925 Diagram 56 boiler fitted (number D1485)
23/03/1933 Diagram 56 boiler fitted (number D1006)
10/11/1937 Diagram 56 boiler fitted (number 2233)
10/11/1942 Diagram 56 boiler fitted (number D1365)
17/08/1946 Diagram 56 boiler fitted (number 2150)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1922 10/1922   General Boiler number D1921 (Diagram 56)
 
Darlington Works 08/07/1925 30/09/1925 85 days General Boiler number D1485 (Diagram 56)
 
Darlington Works 01/07/1929 16/08/1929 47 days General    
Darlington Works 31/08/1931 28/09/1931 29 days Heavy    
Darlington Works 09/02/1933 23/03/1933 43 days General Boiler number D1006 (Diagram 56)
 
Darlington Works 22/05/1936 01/07/1936 41 days General    
Darlington Works 06/07/1936 27/07/1936 22 days Unclassified    
Darlington Works 11/10/1937 10/11/1937 31 days Heavy Boiler number 2233 (Diagram 56)
 
Darlington Works 06/11/1939 18/12/1939 43 days General    
Darlington Works 06/09/1940 13/09/1940 8 days Unclassified    
Darlington Works 19/09/1942 10/11/1942 53 days General Boiler number D1365 (Diagram 56)
 
Darlington Works 29/08/1944 18/09/1944 21 days Light Repair    
Gateshead Works 01/10/1944 22/10/1944 22 days Light Repair    
Gateshead Works 13/01/1948 05/02/1948 24 days Light Repair    

Mentions ...
Report Date Title Report Source
31/05/1949 Darlington Works (scrap yard) New Work May: Class 'A.1' Nos. 60148 an 60149. No. 60150 was ex the Paint Shop on 14/6, painted green. Locomotives awaiting Works durine May included: Nos. 812, 61069. 1407/15, 61600/61. 62709, 2726/41/56, 5109, 5675, 5784/87, 67317, 7609/19/20, 67708, 67741 (light repair), 8159, 9377, 69824/34/36, Class '8' 79184 an 90001. To scrap yard: Nos. 2377 (frames only), 3275/77, 3300/05/07/34, 65107, 5114, 5602, 65629 an 5703. Locomotives ex Works during May included: Nos. 60955, 61035. 61100 (unlined), 61199, 61224, 62397, 62745/53, 63351/95, 63440, 65040/47/89/92, 65110, 65653/55/59, 65730, 65848, 67319/31, 68061, 69106/11, Class '8' 90662/74. Nos. 60083/86 an 60127 have been noted here painted in the new blue colours with the crest on the tender. SLS/194907

Summary
Date Event Details Source See Also
10/1911 To Service To service as North Eastern Railway Number 774
Built at Darlington Works, Works Number
Allocated to Shildon (SHI)
Diagram 56 boiler fitted
   
08/07/1925 Works Visit Works Visit - Darlington Works (General) - Arr: 08/07/1925. Dep: 30/09/1925.
Work undertaken:
Boiler number D1485 (Diagram 56)
   
01/07/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1929. Dep: 16/08/1929.    
31/08/1931 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 31/08/1931. Dep: 28/09/1931.    
09/02/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 09/02/1933. Dep: 23/03/1933.
Work undertaken:
Boiler number D1006 (Diagram 56)
   
07/01/1935 Allocation Reallocated to Darlington (DAR)    
22/05/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 22/05/1936. Dep: 01/07/1936.    
06/07/1936 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 06/07/1936. Dep: 27/07/1936.    
11/10/1937 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 11/10/1937. Dep: 10/11/1937.
Work undertaken:
Boiler number 2233 (Diagram 56)
   
06/11/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 06/11/1939. Dep: 18/12/1939.    
06/09/1940 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 06/09/1940. Dep: 13/09/1940.    
19/09/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 19/09/1942. Dep: 10/11/1942.
Work undertaken:
Boiler number D1365 (Diagram 56)
   
29/08/1944 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 29/08/1944. Dep: 18/09/1944.    
01/10/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 01/10/1944. Dep: 22/10/1944.    
14/07/1946 Renumbered Renumbered to 3334    
17/08/1946 Modification Diagram 56 number 2150 boiler fitted    
13/01/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 13/01/1948. Dep: 05/02/1948.    
1949 Number Allocated Allocated number 63334 but not taken up    
05/1949 Scrapped Broken up by Locomotive Works: Darlington    
16/05/1949 Withdrawn Condemned as 3334 from Darlington (DAR)    

prev prev