Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 926 Today
» 4397 Yesterday
» 18729 Week
» 71745 Month
» 191272 Year
» 3218125 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 781 m/e 10/1911
London and North Eastern Railway (1946) 3335   08/09/1946
British Railways 63335   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/110/1911
Wheels 0-8-0
Builder Darlington Works
Order Number 411A
Fittings (as built)
Engine Brakes Steam
To Service During 10/1911 to Shildon (SHI)
Withdrawal Mon 29/08/1949 off Darlington (DAR)
Service Life 37 yrs, 10 mths , 30 dys
Information Slide valves

Disposal
Scrapping During y/e 1949 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
SHI   Shildon (New) m/e 10/1911
DAR   Darlington on 20/03/1935
     Withdrawn on 29/08/1949

SLS Allocations*
Type Code Name From Date
WDN DAR Darlington on 29/08/1949

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/1911 Diagram 56 boiler fitted (number D26)
07/01/1915 Diagram 56 boiler fitted (number G295)
05/1917 Diagram 56 boiler fitted (number D17)
26/08/1930 Diagram 56 boiler fitted (number 2278)
19/05/1938 Diagram 56B boiler fitted (number 2914)
15/02/1941 Diagram 56B boiler fitted (number 2906)
21/01/1944 Diagram 56B boiler fitted (number 2916)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1915 01/1915   General    
  1917 05/1917   General Boiler number D17 (Diagram 56)
 
Gateshead Works 08/12/1924 19/02/1925 74 days General    
Gateshead Works 05/07/1928 17/09/1928 75 days General    
Darlington Works 28/07/1930 26/08/1930 30 days General Boiler number 2278 (Diagram 56)
 
Darlington Works 21/09/1931 23/10/1931 33 days General    
Darlington Works 27/11/1934 04/01/1935 39 days General    
Darlington Works 08/04/1936 02/06/1936 56 days Heavy    
Darlington Works 11/04/1938 19/05/1938 39 days General Boiler number 2914 (Diagram 56B)
 
Darlington Works 26/01/1939 14/02/1939 20 days Unclassified    
Darlington Works 30/12/1940 15/02/1941 48 days General Tender only
Boiler number 2906 (Diagram 56B)
 
Darlington Works 22/12/1943 21/01/1944 31 days General Boiler number 2916 (Diagram 56B)
 
Gateshead Works 11/10/1945 30/10/1945 20 days Light Repair    
Darlington Works 31/01/1947 29/03/1947 58 days General    

Summary
Date Event Details Source See Also
10/1911 To Service To service as North Eastern Railway Number 781
Built at Darlington Works, Works Number
Allocated to Shildon (SHI)
Diagram 56 boiler fitted
   
07/01/1915 Modification Diagram 56 number G295 boiler fitted    
08/12/1924 Works Visit Works Visit - Gateshead Works (General) - Arr: 08/12/1924. Dep: 19/02/1925.    
05/07/1928 Works Visit Works Visit - Gateshead Works (General) - Arr: 05/07/1928. Dep: 17/09/1928.    
28/07/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 28/07/1930. Dep: 26/08/1930.
Work undertaken:
Boiler number 2278 (Diagram 56)
   
21/09/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 21/09/1931. Dep: 23/10/1931.    
27/11/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 27/11/1934. Dep: 04/01/1935.    
20/03/1935 Allocation Reallocated to Darlington (DAR)    
08/04/1936 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 08/04/1936. Dep: 02/06/1936.    
11/04/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 11/04/1938. Dep: 19/05/1938.
Work undertaken:
Boiler number 2914 (Diagram 56B)
   
26/01/1939 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 26/01/1939. Dep: 14/02/1939.    
30/12/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 30/12/1940. Dep: 15/02/1941.
Work undertaken:
Tender only
Boiler number 2906 (Diagram 56B)
   
22/12/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 22/12/1943. Dep: 21/01/1944.
Work undertaken:
Boiler number 2916 (Diagram 56B)
   
11/10/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 11/10/1945. Dep: 30/10/1945.    
08/09/1946 Renumbered Renumbered to 3335    
31/01/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 31/01/1947. Dep: 29/03/1947.    
1949 Number Allocated Allocated number 63335 but not taken up    
1949 Scrapped Broken up by Locomotive Works: Darlington    
29/08/1949 Withdrawn Condemned as 3335 from Darlington (DAR)    

prev prev