Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 22 Online
» 2215 Today
» 4397 Yesterday
» 20018 Week
» 73034 Month
» 192561 Year
» 3219414 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2235 m/e 10/1918
London and North Eastern Railway (1946) 3392   22/06/1946
British Railways 63392 w/e 01/05/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q610/1918
Wheels 0-8-0
Builder Darlington Works
Order Number 131A
Fittings (as built)
Engine Brakes Steam
To Service During 10/1918 to Stockton (SKN)
Withdrawal Mon 18/11/1963 off West Hartlepool (51C)
Service Life 45 yrs, 1 mth , 19 dys

Disposal

Notes
Notes Into Darlington for cutting up 28/11/63

Allocations
Code Subsequent Codes Name From Date
SKN   Stockton (New) m/e 10/1918
NPT   Newport (Teeside) on 09/06/1930
WHL   West Hartlepool on 17/11/1936
SKN   Stockton on 16/10/1939
WHL   West Hartlepool on 01/04/1940
NPT   Newport (Teeside) on 03/09/1942
DAR   Darlington on 04/12/1943
HLD   Hull Dairycoates on 04/11/1944
WHL   West Hartlepool on 05/03/1945
     Withdrawn on 18/11/1963

SLS Allocations*
Type Code Name From Date
WDN   w/e 18/11/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/1918 Diagram 50 boiler fitted (number D817)
30/10/1928 Diagram 50 boiler fitted (number D190)
26/09/1929 Diagram 50 boiler fitted (number E4/45)
04/04/1934 Diagram 50 boiler fitted (number E4/21)
13/11/1936 Diagram 50 boiler fitted (number D1941)
24/02/1939 Diagram 50 boiler fitted (number HL105)
17/07/1942 Diagram 50A boiler fitted (number 3138)
09/05/1944 Diagram 50A boiler fitted (number 3013)
20/07/1946 Diagram 50 boiler fitted (number 2425)
01/04/1949 Diagram 50 boiler fitted (number 2569)
14/06/1952 Diagram 50A boiler fitted (number 24280)
06/03/1959 Diagram 50A boiler fitted (number 24294)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 28/06/1923 26/09/1923 91 days General    
Darlington Works 20/01/1926 22/04/1926 93 days General    
Stratford Works 23/09/1926 15/10/1926 23 days Light Repair Lifted for heating
 
Darlington Works 10/09/1928 30/10/1928 51 days General Boiler number D190 (Diagram 50)
 
Darlington Works 26/08/1929 26/09/1929 32 days General Boiler number E4/45 (Diagram 50)
 
Darlington Works 01/12/1931 22/01/1932 53 days General    
Darlington Works 08/03/1934 04/04/1934 28 days General Boiler number E4/21 (Diagram 50)
 
Darlington Works 23/09/1936 13/11/1936 52 days General Boiler number D1941 (Diagram 50)
 
Darlington Works 23/01/1939 24/02/1939 33 days General Boiler number HL105 (Diagram 50)
 
Darlington Works 08/08/1939 18/09/1939 42 days Heavy    
Darlington Works 21/09/1939 07/10/1939 17 days Unclassified    
Darlington Works 24/09/1940 21/10/1940 28 days Light Repair    
Darlington Works 19/06/1942 17/07/1942 29 days General Boiler number 3138 (Diagram 50A)
 
Darlington Works 17/04/1944 09/05/1944 23 days General Boiler number 3013 (Diagram 50A)
 
Gateshead Works 04/07/1945 01/08/1945 29 days Light Repair    
Darlington Works 28/05/1946 11/06/1946 15 days Special Exam
 
Darlington Works 24/06/1946 20/07/1946 27 days General Boiler number 2425 (Diagram 50)
 
Gateshead Works 24/11/1947 12/12/1947 19 days Light Repair    
Darlington Works 14/04/1948 30/04/1948 17 days Light Repair Renumbered to BR 63392
 
Darlington Works 10/03/1949 01/04/1949 23 days General Boiler number 2569 (Diagram 50)
 
Darlington Works 26/05/1952 14/06/1952 20 days General Boiler number 24280 (Diagram 50A)
 
Darlington Works 16/06/1952 17/06/1952 2 days Unclassified    
Darlington Works 15/06/1955 08/07/1955 24 days Heavy Intermediate    
Darlington Works 27/12/1956 24/01/1957 29 days Light Casual    
Darlington Works 16/01/1958 12/03/1958 56 days Light Casual    
Darlington Works 10/02/1959 06/03/1959 25 days General Boiler number 24294 (Diagram 50A)
 
Darlington Works 17/03/1959 24/03/1959 8 days Unclassified    
Darlington Works 06/10/1960 29/11/1960 55 days Heavy Casual    

Mentions ...
Report Date Title Report Source
31/03/1949 Darlington Works Locomotives awaiting Works during March included: Nos. 1173, 1240, 2343, 2703, 3005/44, 3139, 3273, 5028/36, 5091, 5668, 5715, 5821, 8180, 8705, 9107, 9374/75, 9880, 61023, 61434, 61619/43, 62730/52, 63099, 63315/80, 65119, 67709/22 (both light repairs), 69807/65, Class '8' 77499, 78578/85, 79206. To scrap yard: Nos, 3332, 5649/68, 5715, 9374. Locomotives ex Works during March included: Nos. 5629/33 (both fitted small snow ploughs at Gateshead Works), 60816, 61020 (name removed), 61216, 61422, 61618, 61644 (rebuilt 2 cyls.), 61645/47/48, 62700/21/64, 63392, 63411/17/30/65, 65094, 65656, 65800/76, 67244/68, 67344, 67615, 68265, 68409/25/32, 68708/13, 69401, 69773, W.D. 90008 (light repair), 90103, 90235, 90391, 90606. No. 5626 has been sold out of service to the Bolton Colliery, it is understood. Easingwold Rly. 0-6-OT No. 2 has been broken up in the scrap yard here by a private firm. SLS/194905
30/04/1949 Darlington Works New work April: Nos. 60146 an 60147. Locomotives awaiting Works during April included: Nos. 888, 1035, 61199, 1224, 1405, 61625, 1668, 2726, 62753. 2760, 3044, 3260, 3275, 63286, 5044/68, 5109, 65633/50, 5653, 65684, 5858, 65868, 7278, 7675, 67729 (light re-pair), 67739 (damaged), 8156, 69842, Class '8' W.D. 77037, 77178 an 79206. Broken up: Nos. 63286, 3316, 65633/84.
Locomotives ex Works during April included: Nos. 60816, 61023, 61215/40/57, 61422, 61434 (rebuilt), 61648, 62700/03/64/67, 63348/80/92, 63411, 65110, 65739, 65821/44, 67722 (light repair), 68015/27, 68409/14/32, 68705, 69107, 69391, 69835/36/88, Class '8' W.D. 90382, 90449 (light repair) and 90460.
SLS/194906

Summary
Date Event Details Source See Also
10/1918 To Service To service as North Eastern Railway Number 2235
Built at Darlington Works, Works Number
Allocated to Stockton (SKN)
Diagram 50 boiler fitted
   
28/06/1923 Works Visit Works Visit - Darlington Works (General) - Arr: 28/06/1923. Dep: 26/09/1923.    
20/01/1926 Works Visit Works Visit - Darlington Works (General) - Arr: 20/01/1926. Dep: 22/04/1926.    
23/09/1926 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 23/09/1926. Dep: 15/10/1926.
Work undertaken:
Lifted for heating
   
10/09/1928 Works Visit Works Visit - Darlington Works (General) - Arr: 10/09/1928. Dep: 30/10/1928.
Work undertaken:
Boiler number D190 (Diagram 50)
   
26/08/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 26/08/1929. Dep: 26/09/1929.
Work undertaken:
Boiler number E4/45 (Diagram 50)
   
09/06/1930 Allocation Reallocated to Newport (Teeside) (NPT)    
01/12/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 01/12/1931. Dep: 22/01/1932.    
08/03/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 08/03/1934. Dep: 04/04/1934.
Work undertaken:
Boiler number E4/21 (Diagram 50)
   
23/09/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 23/09/1936. Dep: 13/11/1936.
Work undertaken:
Boiler number D1941 (Diagram 50)
   
17/11/1936 Allocation Reallocated to West Hartlepool (WHL)    
23/01/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 23/01/1939. Dep: 24/02/1939.
Work undertaken:
Boiler number HL105 (Diagram 50)
   
08/08/1939 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 08/08/1939. Dep: 18/09/1939.    
21/09/1939 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 21/09/1939. Dep: 07/10/1939.    
16/10/1939 Allocation Reallocated to Stockton (SKN)    
01/04/1940 Allocation Reallocated to West Hartlepool (WHL)    
24/09/1940 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 24/09/1940. Dep: 21/10/1940.    
19/06/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 19/06/1942. Dep: 17/07/1942.
Work undertaken:
Boiler number 3138 (Diagram 50A)
   
03/09/1942 Allocation Reallocated to Newport (Teeside) (NPT)    
04/12/1943 Allocation Reallocated to Darlington (DAR)    
17/04/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 17/04/1944. Dep: 09/05/1944.
Work undertaken:
Boiler number 3013 (Diagram 50A)
   
04/11/1944 Allocation Reallocated to Hull Dairycoates (HLD)    
05/03/1945 Allocation Reallocated to West Hartlepool (WHL)    
04/07/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 04/07/1945. Dep: 01/08/1945.    
28/05/1946 Works Visit Works Visit - Darlington Works (Special) - Arr: 28/05/1946. Dep: 11/06/1946.
Work undertaken:
Exam
   
22/06/1946 Renumbered Renumbered to 3392    
24/06/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 24/06/1946. Dep: 20/07/1946.
Work undertaken:
Boiler number 2425 (Diagram 50)
   
24/11/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 24/11/1947. Dep: 12/12/1947.    
14/04/1948 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 14/04/1948. Dep: 30/04/1948.
Work undertaken:
Renumbered to BR 63392
   
10/03/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 10/03/1949. Dep: 01/04/1949.
Work undertaken:
Boiler number 2569 (Diagram 50)
   
26/05/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 26/05/1952. Dep: 14/06/1952.
Work undertaken:
Boiler number 24280 (Diagram 50A)
   
16/06/1952 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 16/06/1952. Dep: 17/06/1952.    
15/06/1955 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 15/06/1955. Dep: 08/07/1955.    
27/12/1956 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 27/12/1956. Dep: 24/01/1957.    
16/01/1958 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 16/01/1958. Dep: 12/03/1958.    
10/02/1959 Works Visit Works Visit - Darlington Works (General) - Arr: 10/02/1959. Dep: 06/03/1959.
Work undertaken:
Boiler number 24294 (Diagram 50A)
   
17/03/1959 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 17/03/1959. Dep: 24/03/1959.    
06/10/1960 Works Visit Works Visit - Darlington Works (Heavy Casual) - Arr: 06/10/1960. Dep: 29/11/1960.    
18/11/1963 Withdrawn Condemned as 63392 from West Hartlepool (51C)    

prev prev