Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 23 Online
» 3752 Today
» 4163 Yesterday
» 17158 Week
» 70174 Month
» 189701 Year
» 3216554 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2245 m/e 05/1919
London and North Eastern Railway (1946) 3402   15/09/1946
British Railways 63402 w/e 05/06/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q605/1919
Wheels 0-8-0
Builder Darlington Works
Order Number 141A
Fittings (as built)
Engine Brakes Steam
To Service During 05/1919 to Tyne Dock (TDK)
Withdrawal Wed 16/09/1964 off Blyth (North) (52F)
Service Life 45 yrs, 4 mths , 17 dys

Disposal

Notes
Notes Sold for scrap to G Cohen, Cargo Fleet, 1/65

Allocations
Code Subsequent Codes Name From Date
TDK   Tyne Dock (New) m/e 05/1919
SKN   Stockton m/e 1925
SEL   Selby on 03/07/1930
NPT   Newport (Teeside) on 19/06/1939
TDK   Tyne Dock on 14/01/1946
BOR   Borough Gardens on 13/04/1947
52C   Blaydon on 14/06/1959
52F   Blyth (North) on 24/02/1963
     Withdrawn on 16/09/1964

SLS Allocations*
Type Code Name From Date
ALLOC BOR Borough Gardens on 13/04/1947
ALLOC 52C Blaydon on 14/06/1959
ALLOC 52FN   3w/e 02/03/1963
WDN   on 16/09/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
05/1919 Diagram 50 boiler fitted (number D916)
07/08/1928 Diagram 50 boiler fitted (number D806)
05/08/1930 Diagram 50 boiler fitted (number E4/49)
28/06/1933 Diagram 50 boiler fitted (number 2440)
13/11/1935 Diagram 50 boiler fitted (number 2437)
02/12/1937 Diagram 50 boiler fitted (number D1944)
29/08/1942 Diagram 50A boiler fitted (number 3297)
27/01/1945 Diagram 50 boiler fitted (number 2392)
04/01/1947 Diagram 50A boiler fitted (number 3145)
21/03/1952 Diagram 50A boiler fitted (number 24221)
30/10/1954 Diagram 50A boiler fitted (number 24220)
16/11/1957 Diagram 50A boiler fitted (number 24309)
30/03/1961 Diagram 50A boiler fitted (number 24261)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 22/08/1923 27/10/1923 67 days General    
Gateshead Works 16/04/1926 16/07/1926 92 days General    
Darlington Works 13/06/1928 07/08/1928 56 days General Boiler number D806 (Diagram 50)
 
Darlington Works 19/05/1930 05/08/1930 79 days General Boiler number E4/49 (Diagram 50)
 
Darlington Works 29/05/1933 28/06/1933 31 days General Boiler number 2440 (Diagram 50)
 
Darlington Works 07/10/1935 13/11/1935 38 days General Boiler number 2437 (Diagram 50)
 
Darlington Works 15/02/1937 18/03/1937 32 days Heavy    
Darlington Works 22/10/1937 02/12/1937 42 days General Boiler number D1944 (Diagram 50)
 
Darlington Works 20/02/1940 19/03/1940 29 days General    
Darlington Works 11/07/1942 29/08/1942 50 days General Boiler number 3297 (Diagram 50A)
 
Darlington Works 29/12/1944 27/01/1945 30 days General Boiler number 2392 (Diagram 50)
 
Darlington Works 08/02/1945 15/02/1945 8 days Unclassified    
Gateshead Works 01/04/1946 18/04/1946 18 days Light Repair    
Darlington Works 26/11/1946 04/01/1947 40 days General Boiler number 3145 (Diagram 50A)
 
Darlington Works 18/01/1947 28/01/1947 11 days Unclassified    
Gateshead Works 09/05/1948 31/05/1948 23 days Light Repair Renumbered to BR 63402
 
Darlington Works 09/03/1950 13/04/1950 36 days Light Intermediate    
Darlington Works 27/02/1952 21/03/1952 24 days General Boiler number 24221 (Diagram 50A)
 
Darlington Works 09/10/1954 30/10/1954 22 days General Boiler number 24220 (Diagram 50A)
 
Darlington Works 18/10/1957 16/11/1957 30 days General Boiler number 24309 (Diagram 50A)
 
Darlington Works 07/11/1958 17/12/1958 41 days Light Casual After derailment
 
Darlington Works 21/02/1961 30/03/1961 38 days General Boiler number 24261 (Diagram 50A)
 
Darlington Works 04/04/1961 07/04/1961 4 days Unclassified    

Summary
Date Event Details Source See Also
05/1919 To Service To service as North Eastern Railway Number 2245
Built at Darlington Works, Works Number
Allocated to Tyne Dock (TDK)
Diagram 50 boiler fitted
   
22/08/1923 Works Visit Works Visit - Darlington Works (General) - Arr: 22/08/1923. Dep: 27/10/1923.    
1925 Allocation Reallocated to Stockton (SKN)    
16/04/1926 Works Visit Works Visit - Gateshead Works (General) - Arr: 16/04/1926. Dep: 16/07/1926.    
13/06/1928 Works Visit Works Visit - Darlington Works (General) - Arr: 13/06/1928. Dep: 07/08/1928.
Work undertaken:
Boiler number D806 (Diagram 50)
   
19/05/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 19/05/1930. Dep: 05/08/1930.
Work undertaken:
Boiler number E4/49 (Diagram 50)
   
03/07/1930 Allocation Reallocated to Selby (SEL)    
29/05/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 29/05/1933. Dep: 28/06/1933.
Work undertaken:
Boiler number 2440 (Diagram 50)
   
07/10/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 07/10/1935. Dep: 13/11/1935.
Work undertaken:
Boiler number 2437 (Diagram 50)
   
15/02/1937 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 15/02/1937. Dep: 18/03/1937.    
22/10/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 22/10/1937. Dep: 02/12/1937.
Work undertaken:
Boiler number D1944 (Diagram 50)
   
19/06/1939 Allocation Reallocated to Newport (Teeside) (NPT)    
20/02/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 20/02/1940. Dep: 19/03/1940.    
11/07/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 11/07/1942. Dep: 29/08/1942.
Work undertaken:
Boiler number 3297 (Diagram 50A)
   
29/12/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 29/12/1944. Dep: 27/01/1945.
Work undertaken:
Boiler number 2392 (Diagram 50)
   
08/02/1945 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 08/02/1945. Dep: 15/02/1945.    
14/01/1946 Allocation Reallocated to Tyne Dock (TDK)    
01/04/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 01/04/1946. Dep: 18/04/1946.    
15/09/1946 Renumbered Renumbered to 3402    
26/11/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 26/11/1946. Dep: 04/01/1947.
Work undertaken:
Boiler number 3145 (Diagram 50A)
   
18/01/1947 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 18/01/1947. Dep: 28/01/1947.    
13/04/1947 Allocation Reallocated to Borough Gardens (BOR)    
09/05/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 09/05/1948. Dep: 31/05/1948.
Work undertaken:
Renumbered to BR 63402
   
09/03/1950 Works Visit Works Visit - Darlington Works (Light Intermediate) - Arr: 09/03/1950. Dep: 13/04/1950.    
27/02/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 27/02/1952. Dep: 21/03/1952.
Work undertaken:
Boiler number 24221 (Diagram 50A)
   
09/10/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 09/10/1954. Dep: 30/10/1954.
Work undertaken:
Boiler number 24220 (Diagram 50A)
   
18/10/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 18/10/1957. Dep: 16/11/1957.
Work undertaken:
Boiler number 24309 (Diagram 50A)
   
07/11/1958 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 07/11/1958. Dep: 17/12/1958.
Work undertaken:
After derailment
   
14/06/1959 Allocation Reallocated to Blaydon (52C)    
21/02/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 21/02/1961. Dep: 30/03/1961.
Work undertaken:
Boiler number 24261 (Diagram 50A)
   
04/04/1961 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 04/04/1961. Dep: 07/04/1961.    
24/02/1963 Allocation Reallocated to Blyth (North) (52F)    
16/09/1964 Withdrawn Condemned as 63402 from Blyth (North) (52F)    

prev prev