Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 33 Online
» 4458 Today
» 4689 Yesterday
» 20070 Week
» 118715 Month
» 321379 Year
» 3348232 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2294 m/e 11/1920
London and North Eastern Railway (1946) 3451   08/09/1946
British Railways 63451 w/e 14/08/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q611/1920
Wheels 0-8-0
Builder Armstrong Whitworth
Order Number E4
Works Number 42
Fittings (as built)
Engine Brakes Steam
To Service During 11/1920 to Borough Gardens (BOR)
Withdrawal Wed 01/01/1964 off West Hartlepool (51C)
Service Life 43 yrs, 2 mths , 1 dy

Disposal

Notes
Notes Into Darlington for cutting up 15/1/64

Allocations
Code Subsequent Codes Name From Date
BOR   Borough Gardens (New) m/e 11/1920
HLS   Hull Springhead on 16/02/1925
BOR   Borough Gardens on 01/02/1927
NPT   Newport (Teeside) on 09/05/1941
NEV   Neville Hill on 12/09/1944
SEL   Selby on 05/10/1947
51L   Thornaby on 14/06/1959
51C   West Hartlepool on 08/04/1962
     Withdrawn on 01/01/1964

SLS Allocations*
Type Code Name From Date
ALLOC 31L   4w/e 11/07/1959
ALLOC 51C West Hartlepool 5w/e 05/05/1962
WDN   on 01/01/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
11/1920 Diagram 50 boiler fitted (number E4/42)
15/09/1932 Diagram 50 boiler fitted (number E4/13)
29/02/1936 Diagram 50 boiler fitted (number AW24)
16/09/1938 Diagram 50 boiler fitted (number 2149)
26/02/1941 Diagram 50 boiler fitted (number 2429)
05/05/1943 Diagram 50 boiler fitted (number 2820)
25/01/1947 Diagram 50A boiler fitted (number 2992)
29/10/1949 Diagram 50 boiler fitted (number 2857)
31/05/1952 Diagram 50A boiler fitted (number 24227)
21/07/1955 Diagram 50 boiler fitted (number 24157)
21/12/1957 Diagram 50 boiler fitted (number 24159)
05/08/1960 Diagram 50A boiler fitted (number 24327)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 06/06/1924 30/08/1924 86 days General    
Darlington Works 30/03/1926 24/08/1926 148 days General    
Gateshead Works 04/09/1929 19/11/1929 77 days General    
Gateshead Works 30/07/1932 15/09/1932 48 days General Boiler number E4/13 (Diagram 50)
 
Darlington Works 20/01/1936 29/02/1936 41 days General Boiler number AW24 (Diagram 50)
 
Darlington Works 24/06/1938 16/09/1938 85 days General Boiler number 2149 (Diagram 50)
 
Darlington Works 25/01/1941 26/02/1941 33 days General Boiler number 2429 (Diagram 50)
 
Darlington Works 06/04/1943 05/05/1943 30 days General Boiler number 2820 (Diagram 50)
 
Darlington Works 29/05/1943 04/06/1943 7 days Unclassified    
Gateshead Works 17/04/1945 27/04/1945 11 days Light Repair    
Darlington Works 12/12/1946 25/01/1947 45 days General Boiler number 2992 (Diagram 50A)
 
Gateshead Works 13/07/1948 09/08/1948 28 days Light Repair Renumbered to BR 63451
 
Darlington Works 05/10/1949 29/10/1949 25 days General Boiler number 2857 (Diagram 50)
 
Darlington Works 31/10/1949 04/11/1949 5 days Unclassified    
Darlington Works 09/05/1952 31/05/1952 23 days General Boiler number 24227 (Diagram 50A)
 
Gateshead Works 21/01/1954 20/02/1954 31 days Light Casual    
Darlington Works 04/08/1954 12/08/1954 9 days Light Casual    
Darlington Works 07/02/1955 05/03/1955 27 days Unclassified    
Darlington Works 31/03/1955 15/04/1955 16 days Unclassified    
Darlington Works 24/06/1955 21/07/1955 28 days General Boiler number 24157 (Diagram 50)
 
Darlington Works 02/08/1955 08/08/1955 7 days Unclassified    
Darlington Works 03/12/1957 21/12/1957 19 days General Boiler number 24159 (Diagram 50)
 
Darlington Works 23/12/1957 27/12/1957 5 days Unclassified    
Darlington Works 16/06/1960 05/08/1960 51 days General Boiler number 24327 (Diagram 50A)
 
Darlington Works 19/08/1960 15/09/1960 28 days Unclassified    

Mentions ...
Report Date Title Report Source
18/01/1964 Darlington Works (Stripping Shop) Erecting Shop: 12122, D191, D2615, D3143, D3672, D5102/9, D5370/6, and 0-4-0 Depl. Diesel No. 56, D7583-89 under construction. Steam Locos under repair: 75037, 60004, 60145, 60923/70, 73092/142/162, 75046/53, 90120/709. Stripping Shop: 47482 for general, 63451, 72002, 75006, 90209/578/728. Yard Sidings: D16, D2700, D5112, 43119, 60132, 61013, 60954, 62060/65, 63468, 65033/99, 65804, 73144, 75006/40, 90026. Diesel Test House: D22, D5104 an D5169. Scrap Yard: 43131, 42770, 61468, 65810, 67652, 68008/38/39/41/42/59/61, 68736, 69006/21 an 72001. SLS/196402

Summary
Date Event Details Source See Also
11/1920 To Service To service as North Eastern Railway Number 2294
Built at Armstrong Whitworth, Works Number 42
Allocated to Borough Gardens (BOR)
Diagram 50 boiler fitted
   
06/06/1924 Works Visit Works Visit - Gateshead Works (General) - Arr: 06/06/1924. Dep: 30/08/1924.    
16/02/1925 Allocation Reallocated to Hull Springhead (HLS)    
30/03/1926 Works Visit Works Visit - Darlington Works (General) - Arr: 30/03/1926. Dep: 24/08/1926.    
01/02/1927 Allocation Reallocated to Borough Gardens (BOR)    
04/09/1929 Works Visit Works Visit - Gateshead Works (General) - Arr: 04/09/1929. Dep: 19/11/1929.    
30/07/1932 Works Visit Works Visit - Gateshead Works (General) - Arr: 30/07/1932. Dep: 15/09/1932.
Work undertaken:
Boiler number E4/13 (Diagram 50)
   
20/01/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 20/01/1936. Dep: 29/02/1936.
Work undertaken:
Boiler number AW24 (Diagram 50)
   
24/06/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 24/06/1938. Dep: 16/09/1938.
Work undertaken:
Boiler number 2149 (Diagram 50)
   
25/01/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 25/01/1941. Dep: 26/02/1941.
Work undertaken:
Boiler number 2429 (Diagram 50)
   
09/05/1941 Allocation Reallocated to Newport (Teeside) (NPT)    
06/04/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 06/04/1943. Dep: 05/05/1943.
Work undertaken:
Boiler number 2820 (Diagram 50)
   
29/05/1943 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 29/05/1943. Dep: 04/06/1943.    
12/09/1944 Allocation Reallocated to Neville Hill (NEV)    
17/04/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 17/04/1945. Dep: 27/04/1945.    
08/09/1946 Renumbered Renumbered to 3451    
12/12/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 12/12/1946. Dep: 25/01/1947.
Work undertaken:
Boiler number 2992 (Diagram 50A)
   
05/10/1947 Allocation Reallocated to Selby (SEL)    
13/07/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 13/07/1948. Dep: 09/08/1948.
Work undertaken:
Renumbered to BR 63451
   
05/10/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 05/10/1949. Dep: 29/10/1949.
Work undertaken:
Boiler number 2857 (Diagram 50)
   
31/10/1949 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 31/10/1949. Dep: 04/11/1949.    
09/05/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 09/05/1952. Dep: 31/05/1952.
Work undertaken:
Boiler number 24227 (Diagram 50A)
   
21/01/1954 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 21/01/1954. Dep: 20/02/1954.    
04/08/1954 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 04/08/1954. Dep: 12/08/1954.    
07/02/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 07/02/1955. Dep: 05/03/1955.    
31/03/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 31/03/1955. Dep: 15/04/1955.    
24/06/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 24/06/1955. Dep: 21/07/1955.
Work undertaken:
Boiler number 24157 (Diagram 50)
   
02/08/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 02/08/1955. Dep: 08/08/1955.    
03/12/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 03/12/1957. Dep: 21/12/1957.
Work undertaken:
Boiler number 24159 (Diagram 50)
   
23/12/1957 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 23/12/1957. Dep: 27/12/1957.    
14/06/1959 Allocation Reallocated to Thornaby (51L)    
16/06/1960 Works Visit Works Visit - Darlington Works (General) - Arr: 16/06/1960. Dep: 05/08/1960.
Work undertaken:
Boiler number 24327 (Diagram 50A)
   
19/08/1960 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 19/08/1960. Dep: 15/09/1960.    
08/04/1962 Allocation Reallocated to West Hartlepool (51C)    
01/01/1964 Withdrawn Condemned as 63451 from West Hartlepool (51C)    

prev prev