Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 1949 Today
» 4720 Yesterday
» 25580 Week
» 90534 Month
» 293198 Year
» 3320051 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 3667 on 22/09/1942
London and North Eastern Railway (1946 1st) 855 on Not applied
London and North Eastern Railway (1946 2nd) 955   21/07/1946
British Railways 60955   03/06/1949

Locomotive Specifics
Designer N. Gresley
Class V2
Company History LNER
Wheels 2-6-2
Builder Darlington Works
Works Number 1894
To Service Mon 22/09/1942 to Haymarket (HAY)
Withdrawal Mon 26/09/1966 off St Margarets (64A)
Service Life 24 yrs , 4 dys

Disposal
Scrapping During 11/1966 at Campbells (Airdrie)

Notes
Notes Sold 11/66 for scrap to G H Campbell, Airdrie

Allocations
Code Subsequent Codes Name From Date
HAY   Haymarket (New) on 22/09/1942
ABD   Aberdeen Ferryhill on 08/03/1948
ABD   Aberdeen Ferryhill w/e 13/03/1948
64A   St Margarets on 18/05/1964
     Withdrawn on 26/09/1966

SLS Allocations*
Type Code Name From Date
ALLOC ABD Aberdeen Ferryhill w/e 13/03/1948
ALLOC 64A St Margarets 5w/e 13/06/1964
WDN   on 26/09/1966

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/09/1942 Diagram 109 boiler fitted (number 3293)
10/06/1944 Diagram 109 boiler fitted (number 2942)
28/11/1947 Diagram 109 boiler fitted (number 3469)
03/06/1949 Diagram 109 boiler fitted (number 2963)
30/08/1952 Diagram 109 boiler fitted (number 29501)
28/11/1953 Diagram 109 boiler fitted (number 29443)
29/08/1957 Diagram 109 boiler fitted (number 29360)
11/02/1960 Automatic Train Control (ATC) fitted
11/02/1960 Diagram 109 boiler fitted (number 29470)
17/08/1962 Diagram 109 boiler fitted (number 29362)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 10/05/1944 10/06/1944 32 days General Boiler number 2942 (Diagram 109)
 
Cowlairs Works 21/03/1945 31/03/1945 11 days Light Repair    
Darlington Works 03/12/1945 19/01/1946 48 days General    
Darlington Works 25/01/1947 08/03/1947 43 days Light Repair    
Darlington Works 25/10/1947 28/11/1947 35 days General Boiler number 29473 (Diagram 109)
 
Darlington Works 16/12/1947 05/01/1948 21 days Unclassified    
Cowlairs Works 19/12/1948 21/12/1948 3 days Light Repair    
Darlington Works 23/04/1949 03/06/1949 42 days General Boiler number 29481 (Diagram 109)
Renumbered to BR 60955
 
Darlington Works 13/06/1949 15/06/1949 3 days Unclassified    
Darlington Works 07/04/1951 10/05/1951 34 days Heavy Intermediate    
Darlington Works 16/07/1952 30/08/1952 46 days General Boiler number 2918 (Diagram 109)
 
Darlington Works 01/09/1952 04/09/1952 4 days Unclassified    
Darlington Works 02/11/1953 28/11/1953 27 days General Boiler number 29443 (Diagram 109)
 
Darlington Works 05/09/1955 07/10/1955 33 days Heavy Intermediate    
Darlington Works 11/07/1957 29/08/1957 50 days General Boiler number 29360 (Diagram 109)
 
Darlington Works 28/02/1958 11/03/1958 12 days Light Casual    
Darlington Works 03/03/1959 13/03/1959 11 days Light Casual    
Darlington Works 30/12/1959 11/02/1960 44 days General Boiler number 29470 (Diagram 109)
Automatic Train Control (ATC) fitted
 
Darlington Works 14/06/1962 17/08/1962 65 days General Boiler number 29362 (Diagram 109)
 
Darlington Works 11/12/1962 09/01/1963 30 days Light Casual    
Darlington Works 27/05/1965 27/07/1965 62 days Light Intermediate    
Darlington Works 29/07/1965 30/07/1965 2 days Unclassified    

Mentions ...
Report Date Title Report Source
12/12/1942 N.E. Area engines in Dundee N.E. Area engines now visit Dundee fairly often, 'C.7's' 716 and 714 noted 12/12 and 19/12, and 'B.16' 931 on 25/12. 'V.2' 3667 worked 9.55 a.m, Edinburgh-Aberdeen on 25/12. SLS/194302
31/05/1949 Darlington Works New Work May: Class 'A.1' Nos. 60148 an 60149. No. 60150 was ex the Paint Shop on 14/6, painted green. Locomotives awaiting Works durine May included: Nos. 812, 61069. 1407/15, 61600/61. 62709, 2726/41/56, 5109, 5675, 5784/87, 67317, 7609/19/20, 67708, 67741 (light repair), 8159, 9377, 69824/34/36, Class '8' 79184 an 90001. To scrap yard: Nos. 2377 (frames only), 3275/77, 3300/05/07/34, 65107, 5114, 5602, 65629 an 5703. Locomotives ex Works during May included: Nos. 60955, 61035. 61100 (unlined), 61199, 61224, 62397, 62745/53, 63351/95, 63440, 65040/47/89/92, 65110, 65653/55/59, 65730, 65848, 67319/31, 68061, 69106/11, Class '8' 90662/74. Nos. 60083/86 an 60127 have been noted here painted in the new blue colours with the crest on the tender. SLS/194907
14/07/1962 Darlington Works (Erecting Shop) Erecting Shop: D15, D238, D347, D2232/42, D2701, D3075, D3237, D5112, D4190-2 undercoats, D4193-5 motors fitted to body shells, 43054, 60876, 60955/7, 61018, 63343, 63409/10/26, 68037, 90322, 90622/51, 92061/2. Stripping Shop: 65786, 90008, 90132. Outside Stripping Shop: 63423, 65757. Crossing: D24, D244/6/83, D2604. Diesel Shunter Test House: D4189 painted. Sidings: 60953/62/81, 61010, 63368, 63456, 65099, 65720, 65807, 67634, 67788, 68014, 69026, 90113, 92034. Scrap Yard: 61077 being cut up, 61063, 61265/98, 61415/9/43/50/1, 65693, 65751, 67666, 67753/95 partially dismantled, 61411-3/60, 65695, 65741, 67601/23/60, 67707/47/50/75, 68052, 68707, 69017/97 intact. SLS/196209
02/02/1963 Glasgow - Aberdeen Pacific workings The last regular workings of L.N.E.R Pacifics - during December and January, Ferryhill usually used 60009 an 60011 on the 7-10 a.m. to Glasgow (back with the 5-30 p.m.) but 60002/4/57/97/522/37 also appeared, whilst the standbies were 60527 or 60955 (rarely required). 60537 appeared on 25th January-one month after its 'withdrawal'! ' St. Rollox usually used 60027* on the 8-25 a.m. to Aberdeen (back with the 5-15 p.m.) with as standby 60031 or 60090, whilst 60012 was borrowed from Haymarket for most of November and December; other locomotives to appear were 60004/512/955/72 an 73153. * 60027 was in Grangemouth shed for repair on 11th February. SLS/196303
14/04/1963 St. Rollox MPD (in steam) in steam-60004/31/94, 60955 and 60525 under repair, and stored-42877, 45119, 45718/28/9/31; ex Works-44931, 45309 an 45478. SLS/196304

Summary
Date Event Details Source See Also
22/09/1942 To Service To service as London and North Eastern Railway Number 3667
Built at Darlington Works, Works Number 1894
Allocated to Haymarket (HAY)
Diagram 109 boiler fitted
   
10/05/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 10/05/1944. Dep: 10/06/1944.
Work undertaken:
Boiler number 2942 (Diagram 109)
   
21/03/1945 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 21/03/1945. Dep: 31/03/1945.    
03/12/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 03/12/1945. Dep: 19/01/1946.    
1946 Number Allocated Allocated number 855 but not taken up    
21/07/1946 Renumbered Renumbered to 955    
25/01/1947 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 25/01/1947. Dep: 08/03/1947.    
25/10/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 25/10/1947. Dep: 28/11/1947.
Work undertaken:
Boiler number 29473 (Diagram 109)
   
16/12/1947 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 16/12/1947. Dep: 05/01/1948.    
08/03/1948 Allocation Reallocated to Aberdeen Ferryhill (ABD)    
13/03/1948 Allocation Reallocated to Aberdeen Ferryhill (ABD)    
19/12/1948 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 19/12/1948. Dep: 21/12/1948.    
23/04/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 23/04/1949. Dep: 03/06/1949.
Work undertaken:
Boiler number 29481 (Diagram 109)
Renumbered to BR 60955
   
13/06/1949 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 13/06/1949. Dep: 15/06/1949.    
07/04/1951 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 07/04/1951. Dep: 10/05/1951.    
16/07/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 16/07/1952. Dep: 30/08/1952.
Work undertaken:
Boiler number 2918 (Diagram 109)
   
01/09/1952 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 01/09/1952. Dep: 04/09/1952.    
02/11/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 02/11/1953. Dep: 28/11/1953.
Work undertaken:
Boiler number 29443 (Diagram 109)
   
05/09/1955 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 05/09/1955. Dep: 07/10/1955.    
11/07/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 11/07/1957. Dep: 29/08/1957.
Work undertaken:
Boiler number 29360 (Diagram 109)
   
28/02/1958 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 28/02/1958. Dep: 11/03/1958.    
03/03/1959 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 03/03/1959. Dep: 13/03/1959.    
30/12/1959 Works Visit Works Visit - Darlington Works (General) - Arr: 30/12/1959. Dep: 11/02/1960.
Work undertaken:
Boiler number 29470 (Diagram 109)
Automatic Train Control (ATC) fitted
   
14/06/1962 Works Visit Works Visit - Darlington Works (General) - Arr: 14/06/1962. Dep: 17/08/1962.
Work undertaken:
Boiler number 29362 (Diagram 109)
   
11/12/1962 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 11/12/1962. Dep: 09/01/1963.    
18/05/1964 Allocation Reallocated to St Margarets (64A)    
27/05/1965 Works Visit Works Visit - Darlington Works (Light Intermediate) - Arr: 27/05/1965. Dep: 27/07/1965.    
29/07/1965 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 29/07/1965. Dep: 30/07/1965.    
26/09/1966 Withdrawn Condemned as 60955 from St Margarets (64A)    
11/1966 Scrapped Broken up by Campbells: Airdrie    

prev prev