Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 22 Online
» 1718 Today
» 4397 Yesterday
» 19521 Week
» 72537 Month
» 192064 Year
» 3218917 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D6782 29/11/1962  
TOPS (37/0) 37082 02/1974  
TOPS (37/5) 37502 1985  
TOPS (37/6) 37602 1995  

Locomotive Specifics
Class as Built 37
Subclass/Rebuild History
ClassFrom
3729/11/1962
37/51985
37/61995
Wheels Co-Co
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Clayton RO2500/03
Multiple Fitting Blue Star
Other Details Split Headcode Boxes
Nose end Gangway
To Service 29/11/1962 to Hull Dairycoates (50B)
Status In Service

Liveries Carried - WIP
Code Colour Date From
GSYP Green bodywork with small yellow warning panel 29/11/1962
GFYE Green with full yellow cab front or nose by 08/1969

Allocations - WIP
Code Subsequent Codes Name From Date
50B   Hull Dairycoates (New) on 29/11/1962
51L   Thornaby w/e 15/06/1963
50B   Hull Dairycoates w/e 13/06/1964
41A   Tinsley w/e 11/10/1969
31B   March w/e 07/10/1972
TE   Thornaby w/e 16/02/1974
GD   Gateshead w/e 09/03/1974
TE   Thornaby w/e 18/01/1975
GD   Gateshead 3w/e 10/05/1975

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
11/12/1971   Air Brakes fitted        
by 04/1975   Steam heat boiler isolated        
05/1976   Steam heat boiler removed        
by 03/1980   Twin fuel tanks fitted        

Configuration - WIP
Date Configuration Description Additional Diagram Source
29/11/1962 vb Vacuum brakes, Steam heat      
11/12/1971 xb Dual brakes, Steam heat      
by 04/1975 xi Dual brakes, Isolated boiler      
05/1976 xo Dual brakes, No heat      
by 03/1980 xot Dual brakes, No heat, Extended Fuel Tanks      


Summary
Start Event Details Source See Also
29/11/1962 To Service To service as British Railways number D6782
Built at English Electric Vulcan Foundry
Allocated to Hull Dairycoates (50B)
Livery applied: Green bodywork with small yellow warning panel
   
15/06/1963 Allocation Reallocated to Thornaby (51L)    
13/06/1964 Allocation Reallocated to Hull Dairycoates (50B)    
08/1969 Livery Change of livery to Green with full yellow cab front or nose    
11/10/1969 Allocation Reallocated to Tinsley (41A)    
11/12/1971 Modification Modification: Air Brakes fitted    
07/10/1972 Allocation Reallocated to March (31B)    
02/1974 Renumbered Renumbered to 37082    
16/02/1974 Allocation Reallocated to Thornaby (TE)    
09/03/1974 Allocation Reallocated to Gateshead (GD)    
18/01/1975 Allocation Reallocated to Thornaby (TE)    
04/1975 Modification Modification: Steam heat boiler isolated    
10/05/1975 Allocation Reallocated to Gateshead (GD)    
05/1976 Modification Modification: Steam heat boiler removed    
03/1980 Modification Modification: Twin fuel tanks fitted    
1985 Renumbered Renumbered to 37502    
1995 Renumbered Renumbered to 37602    

prev prev