Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 23 Online
» 2118 Today
» 4397 Yesterday
» 19921 Week
» 72937 Month
» 192464 Year
» 3219317 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 3516 m/e 07/1885

Locomotive Specifics
Designer W. Dean
Class Stella
Company History GWR
Rebuild History
ClassFrom
3201 SG 2-4-0T07/1885
3201 (2-4-0)09/1894
Wheels 2-4-0
Builder Swindon Works
Order Number 64
Works Number 1021
Fittings (as built)
Condenser Fitted
Boiler Diagram S2 (Round top firebox)
Train Brakes Vacuum
To Service During 07/1885
Withdrawal During 12/1930
Service Life 45 yrs , 5 mths

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 07/1885
     Withdrawn m/e 12/1930

Modifications
Date Modified Modification
09/1900 Diagram S2a boiler fitted (Round top firebox)
02/1903 Diagram B2 boiler fitted (Belpaire firebox)
01/1907 Diagram S4 boiler fitted (Round top firebox)
03/1921 Superheated boiler fitted
03/1921 Diagram B4 boiler fitted (Belpaire firebox)


Summary
Date Event Details Source See Also
07/1885 To Service To service as Great Western Railway Number 3516
Built at Swindon Works, Works Number 1021
   
09/1900 Modification Diagram S2a boiler fitted    
02/1903 Modification Diagram B2 boiler fitted    
01/1907 Modification Diagram S4 boiler fitted    
03/1921 Modification Diagram B4 boiler fitted    
03/1921 Modification Modification: Superheated boiler fitted    
12/1930 Withdrawn Condemned as 3516    

prev prev