Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 31 Online
» 4279 Today
» 4689 Yesterday
» 19891 Week
» 118536 Month
» 321200 Year
» 3348053 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 1202 m/e 06/1876

Locomotive Specifics
Designer J. Armstrong
Class Standard Goods
Company History GWR
Wheels 0-6-0
Builder Swindon Works
Order Number 42
Works Number 649
Fittings (as built)
Boiler Diagram S3 (Round top firebox)
Train Brakes Vacuum
To Service During 06/1876
Withdrawal During 11/1927
Service Life 51 yrs , 5 mths

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 06/1876
     Withdrawn m/e 11/1927

Modifications
Date Modified Modification
05/1890 Diagram S2c boiler fitted (Round top firebox)
09/1902 Diagram S4 boiler fitted (Round top firebox)
05/1906 Diagram S2 boiler fitted (Round top firebox)
02/1910 Diagram B4 boiler fitted (Belpaire firebox)
05/1923 Superheated boiler fitted


Summary
Date Event Details Source See Also
06/1876 To Service To service as Great Western Railway Number 1202
Built at Swindon Works, Works Number 649
   
05/1890 Modification Diagram S2c boiler fitted    
09/1902 Modification Diagram S4 boiler fitted    
05/1906 Modification Diagram S2 boiler fitted    
02/1910 Modification Diagram B4 boiler fitted    
05/1923 Modification Modification: Superheated boiler fitted    
11/1927 Withdrawn Condemned as 1202    

prev prev